Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Time Dependent Open-End Pipe Pile Capacity Assessment By Dynamic And Quasi-Static Methods

    By Derrick D. Dasenbrock

    Three piers of a new river bridge are supported on 1.067 m diameter open-end steel pipe piles. At time of drive, and after pile re-strikes, high-strain dynamic capacity values at plan tip elevations,

    Jan 1, 2006

  • DFI
    Repair Of Deep Foundations - Summary

    By Dennis W. Boehm

    The building boom of the late 1970's and early 1980's has all but used up most of the better sites across the more populated metropolitan areas of the United States. This means that current

    Jan 1, 1999

  • DFI
    Rehabilitation Of Existing Foundation Piles Of Marine Structures In New York City Harbor, USA

    By P. B. Kelleher

    Most of the piers and other pile-supported marine structures in the New York City Harbor area were constructed prior to the widespread use of currently available pile protective systems. As a result,

    Jan 1, 1989

  • DFI
    Recent Advances In Large Diameter Diaphragm Wall Shafts

    By Benoit Virollet

    Over the last 10 years the diameter of unbraced, unlined and unanchored circular shafts has grown dramatically in many parts of the world. This progress has taken place through improvements in: constr

    Jan 1, 2006

  • DFI
    The Channel Tunnel Project - Historical Background

    By C. J. Kirkland

    For two thousand years and more, we insular Britons have been grateful for the existence of the narrow strip of water that separates us from mainland Europe. It has given us a sense of security agains

    Jan 1, 1991

  • DFI
    Environmental Considerations For Foundation Construction In The Boston Area - The New MCP

    By James V. Errico

    On October 1, 1993 the regulations for assessing and cleaning up contaminated soil and groundwater in the Commonwealth of Massachusetts were revised. These new regulations, known as the Massachusetts

    Jan 1, 1994

  • DFI
    Deep Foundations On Deer Island

    By Michael W. Oakland

    Deer Island is the site of the Massachusetts Water Resources Authority (MWRA) wastewater treatment plant which, when completed in 1999, will serve 43 cities and towns in central eastern Massachusetts.

    Jan 1, 1994

  • DFI
    Deep Mix-In-Place Soil/Cement Stabilisation Using Hollow Stem Augers For Excavation At Elland, West Yorkshire

    By J. A. Elliot

    Deep Mix-in-Place soil stabilisation is achieved by forming columns of soil/cement arranged to overlap by secant intersection. Alternate columns are constructed initially and infilled. The cementitiou

    Jan 1, 1989

  • DFI
    Careful And Controlled Underpinning Methods In Restoration Of Damaged Houses In The Old Town Of Stockholm

    By T. Iwanowski

    Stress wave measurements and calculations are often used to make a safe determination of the bearing capacity and the integrity of driven piles. Some applications to the restoration of old buildings i

    Jan 1, 1991

  • DFI
    Helical Foundations And Tiebacks: Quality Control, Inspection And Performance Monitoring

    By John S. Pack

    The last 25 years have seen rapid expansion in the use of helical screw pile foundations and tiebacks for new and retrofit construction of buildings and earth retention structures. An estimated $100 m

    Jan 1, 2003

  • DFI
    Displacement Dependent Stiffness And Damping Constants Of Pile Groups

    By Shamsher Prakash

    Equivalent spring constants for analysis of footings is a function of Young's modulus of pile material (Ep), shear modulus of soil (Gs), and geometry of the footing and/or piles. Shear modulus is

    Jan 1, 2002

  • DFI
    Anamolies Ammednments And Revision Of Is Code On Underreamed Piles - Synopsis

    By A. V. Shroff

    The Indian Standards code of practice for design and construction of underreamed piles contains provision for installing such piles in expasive soils. In recent years, a large amount of research work

    Jan 1, 1996

  • DFI
    Design Parameter For Jacked Pile

    By Sugie Prawono

    Jacked pile is the only piling system in which the load capacity of the pile, at any penetration depth, could be monitored directly during its installation process. Each installed pile could have a gr

    Jan 1, 1999

  • DFI
    Post-Grouted Drilled Shafts: A Case History Of The PGA Boulevard Bridge Project

    By Gray Mullins

    A post grouted drilled shaft foundation system was successfully used in place of the specified driven pile foundation system as a Value Engineering Cost Proposal (VECP) for the new PGA Boulevard Grade

    Jan 1, 2003

  • DFI
    Video Inspection Of Rock Sockets For A Piling Project

    By Ali Ameli

    Design loads are limited for piles relying upon toe stresses in rock due to uncertainty about the rock quality over the whole pile diameter because of rock mass properties or construction effects. Th

    Jan 1, 2006

  • DFI
    Problems Of Cast In Situ Driven Piles Added To Existing Piles And Built Near A Standing Structure

    By L. F. Albert

    The paper describes solutions given to foundation problems during the reconstruction of a power plant set on fire, located adjacent to several still Working Units. After a detailed site and laboratory

    Jan 1, 1989

  • DFI
    Case History On Pipe Pile Installation - Presented At An Associated Pile & Fitting Corp. GEO-Pile Conference San Francisco, CA

    By Jerry F. Parola

    In current practice, pile foundation design is based on a general under-standing of pile-soil interaction during installation and superstructure-pile-soil interaction after construction. The pile desi

    Jan 1, 1986

  • DFI
    Sonic Drilling Offers Quality Control And Non-Destructive Advantages To Geotechnical And Construction Drilling On Sensitive Infrastructure Sites

    By John P. Davis

    The use of conventional, circulatory air rotary and fluid rotary, cased and uncased drilling methods in the vicinity of sensitive infrastructure can have deleterious effects on the ground conditions s

    Jan 1, 2006

  • DFI
    Analyses On Laterally Loaded Cast-In-Place Concrete Piles ? Synopsis

    By Makoto Kimura

    Failure tests on laterally loaded single and pile group are analyzed with a 3-dimensional elasto-plastic finite element program. In the analysis, the mechanical behavior of the ground is supposed to b

    Jan 1, 1996

  • DFI
    Problems Encountered For Deep Caissons For The Second Bassein Creek Bridge At Mumbai, India

    By Deepak B. Deshpande

    This paper enumerates various difficulties encountered in the design and construction of deep caisson foundations for the Second Bassein Creek Bridge constructed over a creek with very difficult site

    Jan 1, 2002