Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Deep Diaphragm Walls And Bored Piles For Subway Construction At The Amsterdam Central Station
By Wolf-R. Under
For improvement of urban traffic infrastructure, the City of Amsterdam is currently constructing the 9.5 km long North-South Metro line passing through the central districts of Amsterdam. Focal secti
Jan 1, 2006
-
Experiences Of The Cast-In-Situ Pile Filling In Stone-Line Intercalation
By Guan Jichang
An abandened breakwater, located at the rear of No. 2 berth in Dongdu Port area of Xiamen City, was not cleaned thoroughly when the backfilling of sand started. The uncleaned stone layer was about 2 t
Jan 1, 1991
-
The Pile Foundation Of Tall Buildings In Shenzhen
By Li Keqiang
This paper discusses the pile foundation of tall buildings in Shenzhen region. For 156 constructed tall buildings exceeding 18 storeys, about 86. 5 per cent of the sum. The two main types of foundatio
Jan 1, 1991
-
Development and Experiences on Versatile Applications of RD-pile Wall
By Fredrik Sarvell, Leo-Ville Miettinen, Veli-Matti Uotinen
"Abstract The continued concentration of building activities in cramped areas of city centres means more underground construction and facilities. Demand to minimize execution time and any kind of dist
Jan 1, 2014
-
Pin Piles For Seismic Rehabilitation Of Bridges
Since the 1989 Loma Prieta Earthquake in the San Francisco Bay Area, the California Department of Transportation (CALTRANS) has accelerated seismic upgrading of their bridges. Many structures can be i
Jan 1, 1993
-
Residual Loads Measurements in Driven Steel H-Piles
By Reda M. Bakeer
"Measurements obtained during load testing of two steel H-piles driven at a site in Northeastern Mississippi are discussed. The general site conditions, equipment used, testing procedures and results
Jan 1, 2017
-
The Synergy Between Theory And Practice In Geo-Engineering
By Bas R. Hemmen
GeoBrain is a facility at GeoDelft with the purpose to provide society with all relevant geo-engineering knowledge and experience in a structured way. On the basis of the available knowledge and exper
Jan 1, 2006
-
Construction Of Deep Open Foundations For Airoli Road Bridge On Thane Creek In New Bombay - Synopsis
By A. R. Jambekar
City of Bombay has been developed out of former 7 islands. Landmass of 434 sq.km. of Bombay, started looking inadequate for further growth and expansion of Bombay City. In order to develope twin city
Jan 1, 1996
-
Case History: Use Of Rock-Socketed Augered Cast-In-Place Piles
By Tracy Brettmann
The use of rock-socketed Augered Cast-In-Place (ACIP) piles is new to the Austin and central Texas region. This case history describes the design methodology, load test results, quality control proced
Jan 1, 1998
-
Evaluation Of Design Methods For Tieback Retaining Walls In Seattle - Introduction
By John P. Turner
The behavior of tieback retaining walls depends on many factors, including soil properties, groundwater conditions, construction sequence, spacing and stiffness of tiebacks and soldier piles, tieback
Jan 1, 1990
-
A Case Study on the Effects of Using Surcharge Fill as a Complement to Ground Improvement with Dry Deep Mixing
By Stefan Larsson, Sebastian Adevik, Sadek Baker, Razvan Ignat
"Abstract Uncertain strength, deformation and flow properties in dry deep mixing columns often lead to conservative choices concerning design values where the design is regularly complemented with a s
Jan 1, 2014
-
Approach Wall Foundations Olmsted Locks And Dam Project ? Summary
By Jeffrey A. Schaefer
The Olmsted Locks and Dam project is located on the Ohio River approximately 16.5 miles upstream of its confluence with the Mississippi River. It consists of twin 1200 ft. locks with floating and fixe
Jan 1, 2001
-
Deep Excavation In The Shanghai Soft Clay Under Protection Of A Cast-In-Situ Retaining Wall ? Synopsis
By M. Pernot
A 12 m-deep excavation has to be perfomed in the Shanghai soft clay to install an underground electric substation. This article was originally intended to study the behaviour of the wall, the excavati
Jan 1, 2010
-
Appropriate Field Measurements For Testing Capacity-Prediction Methods For Piles Installed By Vibration - Introduction
By Michael W. Neill, O&apos
The engineering profession generally does not accept vibro-driven piles as bearing piles unless their capacities can be verified by restriking with an impact hammer, which significantly reduces the ec
Jan 1, 1989
-
What Has Been Learned About Drilled Shafts From The Osterberg Load Test - Summary
By Jorj O. Osterberg
The Osterberg (O-Cell) Method makes it possible to separate the side shear resistance (skin friction) from end bearing. The O-Cell is placed on or near the bottom of a drilled shaft and after the conc
Jan 1, 1999
-
Innovations In Scandinavia
By Carl-John Grävare
This paper deals with some of the systems and equipment that are being developed and/or are in use in Scandinavia. The main subject is the development of loading tests on the piles using monitoring eq
Jan 1, 2000
-
Quality Control For Augered Cast-In-Place Piles In Texas And Louisiana - 1.0 Introduction
By Timothy L. Roberts
For many years practicing geotechnical and structural engineers in Texas and Louisiana were reluctant to include augered cast-in-place (ACIP) piles as a viable deep foundation alternate. Three primary
Jan 1, 1998
-
Instrumented Rock-Socketed Drilled Piers Hamilton General Hospital ? Introduction
By R. G. Horvath
In the Hamilton area, and in many other areas of Ontario and around the world, large diameter drilled pier (caisson) foundations are frequently selected as the most appropriate foundation system for h
Jan 1, 1987
-
Geojet®-Turbojet® - A Deep Mixing Method For The Solution Of Geotechnical Problems
By Maurizio Siepi
The realisation of most of the civil engineering works is subordinate to the execution of consolidation works, in order to improve the soil physical-mechanics characteristics. The works classifiable w
Jan 1, 2002
-
Some Problems Encountered During Pile Installation - Synopsis
By [D. N. ] Naresh
During different activities pile installation like pile boring, concreting etc., it is likely that various problems, depending up on site condition may be encountered. There are possibilities that som
Jan 1, 1996