Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Classical And Finite Difference Method To Estimate Pile Capacity Compared With Pile Load Testing Results

    By Yogesh Prashar

    Three conventional uplift tests and 12 Rapid Pile Load Tests (RLT) were performed on total of fifteen 16-inch square pre-cast concrete driven piles at a test site in Emeryville California in December

    Jan 1, 2002

  • DFI
    Tanana River Bulkhead Expansion, Flexibility In Construction; Key To Arctic Dock Construction

    By Roy Peratrovich

    An innovative cost-saving design for a 1,100 ft bulkhead on the Tanana River at Nenana in central Alaska won Alaska Construction & Oil magazine's Construction Achievement Award. The designers uti

    Jan 1, 1985

  • DFI
    Piled Raft On Layered Soils

    By Luca de Sanctis

    The analysis of piled raft foundations in layered soils may be performed by 3D finite elements or by approximate procedures. Among the latter, the code NAPRA (Russo, 1998) is based on the method of th

    Jan 1, 2002

  • DFI
    Some Experience With Large Diameter Caissons ? Synopsis

    By I. H. Wong

    The large diameter caisson foundations and their construction methods for three 50 to 60 storey high buildings in Singapore are described. The caissons are 5 m to 8 m in diameter and 40 m to 100 m dee

    Jan 1, 2010

  • DFI
    Installation And Performance Of Interlocking Drilled Shaft And Tieback Shoring System - Summary

    By Alec C. Bloem

    A 55' deep excavation encompassing almost a city block in London, Ontario required a lateral earth retention system to provide both temporary excavation support and a permanent groundwater cut-of

    Jan 1, 1991

  • DFI
    Installation Of Augered Cast-In-Place Piles - Equipment (6ba9ad25-c173-46b9-a527-da25ba80fe4d)

    ? Hollow Stem Auger ? Drill Bits ? Leads/Torque Arm ? Hydraulic Gearbox ? Hydraulic Power Unit ? Grout Pump ? Crawler Crane

    Jan 1, 2002

  • DFI
    High Capacity Drilled Cast-In-Place Piles, House Of Representatives Building, Lansing, Michigan - Summary

    By Robert C. Rabeler

    Soil and Materials Engineers, Inc. (SME) has utilized drilled cast-in-place (D-CIP) piles on a number of projects in the midwest. These foundation systems have typically consisted of drilling an 8 to

    Jan 1, 1999

  • DFI
    Interlocking H-Sections For Cofferdams Resist High Pressure

    By Marc Dondelinger

    Interlocking H sections with deep webs and high section modulus are being used for cofferdams and shore enclosures where pressures are excessive. The H sections can be as much as a meter deep; they ca

    Jan 1, 1985

  • DFI
    A Brand New Barrier Wall Installed at Wolf Creek Dam

    By Maurizio Siepi, Fabio Santillan, Lyndon Bedford, Carlo Crippa

    "Abstract: Wolf Creek dam, on the Cumberland River in Kentucky, US, operated and maintained by the Nashville District of the USACE, is the Corps' largest reservoir east of the Mississippi river. The 1

    Jan 1, 2014

  • DFI
    Local Use And Design Of Augered, Cast-In-Place Piles In The Southern Piedmont Province ? Introduction

    By Geoffrey C. Hebner

    Augered, cast-in-place piles (ACIP) have become a very common foundation type in Atlanta and the Southern Piedmont Province as well as much of the United States in the past 20 years. Prior to the intr

    Jan 1, 2003

  • DFI
    Vibratory Driver/Extractors Do More Than Drive Sheet Piles - Summary

    By John L. White

    Vibratory driver/extractors do more than drive and extract sheet piles. I would say more than sixty percent (60%) of the time, vibratory pile driver/extractors are engaged in work that has nothing to

    Jan 1, 1997

  • DFI
    Earth Retention Systems In The Urban Environment - Special Considerations

    By George J. Tamara

    The urban environment presents special challenges for the design and construction of earth retention systems. Complications arising from difficult subsurface conditions are compounded by the presence

    Jan 1, 2003

  • DFI
    Overcoming Grouting Difficulties During Retaining Wall Stabilization

    By Jared M. Green

    This paper presents the wall stabilization design and implementation for a 541 linear ft masonry and concrete gravity-type retaining wall flanking the west perimeter of a 7.37 acre parcel in Bronx, Ne

    Jan 1, 2011

  • DFI
    Results Of Dynamic And Static Load Tests On Helical Piles In The Varved Clay Of Massachusetts

    By Jorge Beim

    Helical Piles are increasingly being used to support and rehabilitate structures subjected to compressive axial loads. Traditionally, empirical correlations between installation torque and load capaci

    Jan 1, 2012

  • DFI
    Operator Independent Installation Of Lime Cement (L/C) Columns

    By Tobias Hansson

    The quality of Lime Cement (L/C) columns is to a great extent dependent on the installation procedure. At a site in the south of Sweden, the client reported problems with the installed columns. To eva

    Jan 1, 2000

  • DFI
    Diaphragm Wall Construction In Hong Kong

    By Arturo Ressi di Cervia

    The utilization of diaphragm wall construction in Hong Kong began in 1974 with the construction of the New World Center, the first diaphragm wall job built in the British Colony. That landmark job

    Jan 1, 1993

  • DFI
    Quality Assurance In Jet Grouting For A Deep Seated Slab In Amsterdam

    By Thomas Passlick

    By means of further developed machines and techniques and with growing experiences in jet grouting, the challenge of this building method becomes more and more complex. To keep the concerning risks as

    Jan 1, 2006

  • DFI
    Dynamic Pile Testing In Soils Exhibiting Set-Up - Introduction

    By Juan M. Antorena

    A dynamic testing program was performed to evaluate installation procedures, assess capacity of 610-mm (24-inch) diameter open ended steel pipe to evaluate set-up and provide minimum pile tip elevatio

    Jan 1, 1995

  • DFI
    Coming To Times - Background - Collapse

    By Darrell L. Beddard

    The Loma Prieta earthquake occurred on October 17, 1989 at 5:04 PM, Pacific Daylight Time. It measured 7.1 in magnitude and was felt from Los Angeles north to the Oregon state line and east to western

    Jan 1, 1995

  • DFI
    Development of New Shaft Resistance Models for Piles Driven in the Puget Sound Lowlands

    By Armin W. Stuedlein, Youssef Bougataya

    Early stage design of driven piles primarily relies on static analysis based on one or a combination of total and effective stress approaches, the latter known as the method to estimate axial capaci

    Jan 1, 2018