    Low Noise and Low Vibration Tube Pile Installation by the Press-in Piling Method

    By Takefumi Takuma, Hiroyuki Nishimura, Shigeru Kambe

    "In order to achieve tubular pile driving with low noise and low vibration, the Press-in Piling Method has been adopted on many projects. The method utilizes reaction force derived primarily from prev

    Jan 1, 2015

  • DFI
    Injecting Sustainability into Deep Soil Mixing Projects

    By Paul R. Lear

    Sustainability continues to be an important aspect of remediation and infrastructure projects. Deep soil mixing (DSM), a common construction and remedial technology, can easily incorporate the followi

    Sep 8, 2021

  • DFI
    4 Equipment Installation: Recent Developments - Equipment Installation - Recent Developments: General Report On 'Deep Foundation Installation Monitoring' - 1. Introduction

    By B. De Paoli

    At Pietrafitta, between Assisi and Perugia, ENEL (Italian National Electricity Authority) has for some time been managing a power-station operated with lignite, mined from an open mine on the way to e

    Jan 1, 1994

  • DFI
    Use Of Geospatial Project Information Management Systems On Diaphragm And Secant Pile Walls

    By Andrew Higgins, Jamey Rosen

    This presentation will demonstrate some recent advancements in the applications of Project Information Systems (PIMS) technology to seepage barrier walls in the context of evolving Owner Specification

    May 1, 2022

  • DFI
    Electronic Instrumentation in Support of Installation of Special Foundation Projects as Part of the Digital Future - Ensuring Safe Production and Improving Quality Control

    By Franz-Werner Gerressen

    New developments are required each day as our industry becomes more competitive. To improve performance, continue and to ensure future demands can be met. This requires the development of technical su

    Jan 1, 2019

  • DFI
    Implant Foundations – Press-in Piling Method for Urban Construction

    By Tsunenobu Nozaki

    "Basically, the “Press-in Piling Method” was invented to eliminate construction nuisances, such as noise and vibration which have been serious unsolved problems for advancing societies over a long tim

    Jan 1, 2015

  • DFI
    A Full-Scale Test by Low-Improvement-Rate Soil in Combination with Crushed-Stone Mat on Peaty Ground

    By H. Hayashi, M. Yamaki, H. Hashimoto, T. Yamanashi

    "In an experiment on a trial embankment, the deformation mode of the improved ground at the toe of the embankment was compared with the deformation mode of the unimproved ground. This comparison showe

    Jan 1, 2015

  • DFI
    Evaluating Bending Failure Of Floating Soil-cement (Sc) Columns Under Road Embankments Using 3d Fea

    By Sailesh S. Author

    The current design method for soil-cement (SC) columns improved soft clayey ground under the highway embankments assumes a slip circle failure surface shearing through the columns and the soils using

  • DFI
    Long-Term Performance Of Wind Turbine Foundations Through Numerical Modeling

    By Spencer Ness, Yazen Khasawneh, William Tjaden, Mohammad Nassim

    The evaluation of long-term performance of the wind turbine structures is essential in lowering the Levelized Cost of Electricity (LCOE) from wind sources. The required maintenance of the wind turbine

    Oct 1, 2022

  • DFI
    Field Measurements Of In-Situ Equipment Track Pressure And Working Platform Deformation Using Earth Pressure Cells And Fiber Optics

    By Peter Faust, Peter Hubbard, Kenichi Soga

    The European Federation of Foundation Contractors (EFFC) and The Deep Foundations Institute (DFI) have set up a task group to compile a Guide for Working Platforms. The first edition of this Guide has

    May 1, 2022

  • DFI
    “Value Engineering” — Four Case Histories

    By Maral Papazian Bedian

    "Case 2. 100th Street Bus Depot: Elimination of Deep Caissons in Favor of Spread FootingsThe PROJECTThe 100th Street Bus Depot is a new five-story bus terminal for the New York City Metropolitan Trans

    Jan 1, 2003

  • DFI
    Pile Foundations For Algiers New Airport Terminal

    By Ramdane Bahar

    The new Algiers airport building is a reinforced concrete building of more than 80 thousand square meters of floor slabs. It is located at Dar-EI-Beida, near the old passenger terminal, about 20 km ea

    Jan 1, 2002

  • DFI
    Proposed Micropile Section for the 2006 IBC

    By Lawrence F. Johnsen, Marc J. Gallagher

    "Micropiles are small diameter, bored, grouted-in-place piles incorporating steel casing and/or reinforcements. The omission of micropiles from most United States building codes has resulted in the ap

    Jan 1, 2005

  • DFI
    Seismic Stability Analysis of Seepage Control Measures for Levees in Central Valley, California

    By Zia Zafir

    "Levees in the central valley of California are primarily for flood control purposes and thus are subjected to infrequent hydraulic loading. The primary concern for these levees is their instability d

    Jan 1, 2016

  • DFI
    Helical Pile Foundation Solution for Landfill Redevelopment

    By Kevin Baumgartner, Steven Babcock

    A landfill in Phoenix, AZ reached capacity and was graded over in the 1970s. The property was subdivided into lots in 2007 to create a business park. However, the challenging site conditions caused by

    Sep 8, 2021

  • DFI
    Suwanee American Cement Plant, Branford, Florida: A Case Study Of Large Diameter Continuous Flight Auger Design Build Foundations

    By Gordon King

    This paper presents a case study of large diameter continuous flight auger (CFA) piles and drilled shafts utilized for foundation support of a series of heavily loaded cement plant structures at the S

    Jan 1, 2003

  • DFI
    Performance Of Storage Tanks Supported By Shallow & Deep Foundations

    By Akhila Manne, Prasad P. V S R

    Storage tanks are heavily loaded thin-shelled structures that exert large loads on and require large foundations to support them. They are generally very sensitive to foundation settlements as it may

    Nov 1, 2022

  • DFI
    Session 20 "Grouting for Water Retaining Embankments"

    By Timothy Flaherty

    We observed the boiling in the water very close to the water adjacent to where we were drilling. That only happened at the very beginning before it was switched to water flushing. Yes, it was performe

    Feb 10, 2003

  • DFI
    Micropiles For Rehabilitation Of Two Existing Structures

    By Jeffrey R. Hill

    This paper discusses the use of micropiles for the rehabilitation of the following two structures: the Milwaukee Auditorium Theatre, in Milwaukee, Wisconsin, and the Cupples Ballpark Lofts, in St. Lou

    Jan 1, 2008

  • DFI
    Deep Foundations: Study on Effect of Drilling Fluids on Concrete Integrity

    By Alberto Carmona Rosell, Sri Ram Ramankutty

    "The installation of Bored Piles and Diaphragm Wall under slurry using tremie raises quality concerns on the integrity of concrete. It is vital to understand the effects on concrete integrity during c

    Jan 1, 2015