Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Diving Underground - Through a Hologram - To Better Understand Foundation Risk

    By Scott A. Anderson, Benjamin S. Rivers, Derrick D. Dasenbrock, Silas Nichols

    Unknown geotechnical conditions are a major source of risk. Unexplored places vastly outnumber the sampled and tested ones, and widely spaced boreholes with intermittent tests and samples are the norm

    Jan 1, 2019

  • DFI
    Impact Of Clay On Early Jet Grouting Strength

    By Debra F. Laefer

    Jet grouting is a ground improvement technique that has become widely adopted over the past three decades, yet relatively little data has been published about performance characteristics of mixes unde

    Jan 1, 2009

  • DFI
    Role Advanced Technology - Resolve Inherent Dichotomy In High Strain Dynamic Testing

    By Achyut Kumar Allady, Praveen Arumughan

    NCHRP Synthesis 418 (2011) entitled, “Developing Production Pile Driving Criteria from Test Pile Data” details the occurrence of dichotomy between pile Skin resistance and pile Tip resistance mobiliza

    May 1, 2022

  • DFI
    Methodology for Drilling Offshore or Onshore in Hard Rock for Deep Foundations with Pile Top Drill Rigs (PBA)

    By Dinesh Hinduja, Pérez: Miguel

    "Large structures are generally exposed to dynamic and structural loading. They require usually either foundation connected to hard rock through sockets or driven foundations, which encounter boulders

    Jan 1, 2015

  • DFI
    Installation and Efficiency of Common Helical Pile Couplings

    By Jason Herron, Joseph Brown

    The common couplings for joining sections of helical piles with an outside diameter of 6.625 inches and 8.625 inches are square on square, flange to flange, external pipe sleeve, internal pipe sleeve,

    Jan 1, 2019

  • DFI
    Performance Monitoring of Mixed Ground Working Platform for a CCR Surface Impoundment

    By Ali Ebrahimi, Jeremy M. Gasser, Cuneyt Gokmen, Paul J. Sabatini, Roneet Das, William Tanner, Amir Ahmadipur

    There are safety concerns related to operation of heavy equipment over coal combustion residual (CCR) impoundments during construction of the impoundment closure programs. As part of a pilot study pri

    Jan 1, 2019

  • DFI
    Verification of Installation and Performance of ACIP Piles for Bridges

    By W. Morgan NeSmith

    "The DFI ACIP Pile Committee, in conjunction with the Florida DOT, completed an ACIP Pile installation monitoring and performance test program in late 2016 to advance the inclusion of ACIP piles in fu

    Jan 1, 2017

  • DFI
    Cement Deep Soil Mixed Walls/Grout Plug for Groundwater Cut Off and Excavation Support at the Bart Warm Springs Extension

    By Harry Schnabel, Mitchell L. Fong, Douglas R. Jenevein, Thomas S. Lee

    "The Warm Springs Extension (WSX) is one of a series of projects that will eventually extend the Bay Area Rapid Transit System (BART) from Fremont to San Jose, California. A cut and cover tunnel was u

    Jan 1, 2015

  • DFI
    Construction of a Ground Improvement Scheme to Support Large Mechanically Stabilized (MSE) Earth Walls in Kitimat, BC – Using Cutter Soil Mixing

    By James Coull, Brian Wilson, David Siddle

    "In 2012, Golder Construction Inc. was awarded a Design-Build contract for the design and construction of an extensive, deep ground improvement scheme to support up to 20 metres (66 ft) high Mechanica

    Jan 1, 2017

  • DFI
    Back-Calculations Of Centrifuge Tests On Pile Groups Subjected To High-Cyclic Loading

    By Torsten Wichtmann, Jan Macheck, Frederik Broz, Patrick Staubach, Hauke Zachert

    The majority of heavy or strongly loaded structures, for instance high-rise buildings, large span bridges or gas storage tanks are founded on pile groups. However, current design codes and guidelines

    May 1, 2022

  • DFI
    Micropiles for Seismic Retrofits

    By Rob Jameson

    "Although seismic retrofit is recognized as a key micropile application, widely-used reference documents do not clearly address design and testing recommendations for micropiles that are loaded primar

    Jan 1, 2009

  • DFI
    Berth Deepening A Three Decade Old Wharf Structure For The Next Generation Of Container Ships

    By Bill Paparis

    The thirty year old wharf structures at the Port Authority of New York & New Jersey?s Port Elizabeth Marine Terminal are being modernized for the next generation of Post-Panamax container ships, which

    Jan 1, 2013

  • DFI
    Pile Design Philosophies For Coralline And Weak Carbonate Rocks

    By Rahul Wankhade, Sunil S. Baswankar, Aditya S. Kharatkar

    Despite advances in pile design methodologies and piling techniques at site, difficulties and uncertainties still exists for design of piles particularly in coralline deposits and weak carbonate rocks

    Sep 1, 2022

  • DFI
    Cutoff Wall Selection for Levee Improvement

    By Louay Owaidat

    The United States Army Corps of Engineers (USACE) Sacramento District awarded a $64 million construction contract in February 2020 to the Maloney Odin Joint Venture for 3 mi (4.8 km) of levee improvem

    Oct 1, 2022

  • DFI
    Construction of the Tailings Storage Facility Freshet Management Embankment Cut Off Wall at Mount Polley Mine

    By Terry Eldridge, Keith MacKay, David Siddle, Luke Moger

    On August 4th, 2014, a breach occurred in the Perimeter Embankment of the Tailings Storage Facility (TSF) located at the Mount Polley Mine, releasing approximately 10.6 million m3 of supernatant water

    Jan 1, 2016

  • DFI
    Effective Sampling, Testing and Specification Approaches for Deep Mixing at Kitimat LNG, BC

    By Randy R. Williams, Brian W. Wilson, George M. Filz, Marina S. W. Li, Donald A. Bruce

    "In-situ wet grab sampling and post-installation coring of soil-cement structures are typically carried out for Quality Control (QC) and Quality Assurance (QA) of deep mixing (DM) schemes. Wet grab sa

    Jan 1, 2015

  • DFI
    Soil Cement Tensile Strength and Modulus as a Function of Unconfined Compressive Strength

    By Dominic Parmantier, Jason Page

    "In the past, the designers of DSM have analyzed various failure modes and then specified a minimum unconfined compressive strength (UCS) for the soil-cement. The specified minimum UCS reflected the c

    Jan 1, 2015

  • DFI
    Alternative Analytical Methods for Borehole Permeability Tests in Seepage Barrier Walls

    By R. Lee Wooten, David R. Shields, Darren D. Clark

    "Borehole permeability tests that measure flow or head changes in boreholes located within seepage barrier walls are commonly used to estimate the in situ permeabilities of those walls for quality con

    Jan 1, 2016

  • DFI
    Value Engineering Through Systematic Site Investigation and Design Optimization – A Case Study

    By Lu Yitan, Frances Badelow, Manish Tiwari

    "Large ‘design and construct’ projects often present significant geotechnical risks. However, these also present significant opportunities for value engineering in design. These opportunities can be r

    Jan 1, 1900

  • DFI
    Outstanding Issues In Understanding The Behaviour Of Thermally-Activated Pile Foundations

    By Teresa M. Bodas Freitas, Arianna Lupattelli, Peter J. Bourne-Webb, Diana Salciarini, Martina Zito, Donatella Sterpi

    The thermomechanical response of thermally-activated (TA) piles under monotonic thermal loads is quite well understood and the remaining uncertainties relate to the effect of long-term, cyclic loading

    May 1, 2022