Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
In Situ Measurements for Geomechanical Design of Cemented Paste Backfill Systems
By M. W. Grabinsky
Better in situ performance data is required in order to advance the rational geomechanical design of cemented paste backfill systems. A few in situ test programs have been conducted, but these have su
May 1, 2007
-
Mining taxes and social policy
By Robert B. Parsons
"Exploration and development of mineral resources in developing countries by Canadian-based multinational mining companies is becoming increasingly common. One problem being encountered is that the ob
Jan 1, 1991
-
Average Relative Error in Geochemical Determinations: Clarification, Calculation, and a Plea for Consistency (31b12265-3348-4f2c-b091-f58cbc224f80)
"The measurement of error in assays collected as part of a mineral exploration program or mining operation historically has been undertaken in a variety of ways. Different parameters have been used to
Jan 1, 2007
-
The Challenges and Ramp op of Filtered Tails in a Modern Production Plant – Éléonore Project Experience
By Andy Fortin, Jeet Basi, Simon Hille
Goldcorp’s Eleonore mine is situated in Ell Lake area in the northeastern part of the Opinaca reservoir in the James Bay region of Quebec. The design of the 7000 t/d process plant includes crushing,
Jan 1, 2016
-
Introduction of and Experience Gained With Cemented Hydraulic Fill at the Gossan Hill Mine, Western Australia (5fc42dae-6b1c-469d-926f-1a8ca2654f54)
On the 26th of June 2000 a hydraulic fill retaining barricade failed at the Bronzewing mine in Western Australia. The barricade failure resulted in the release of 19,000 m3 of saturated hydraulic fil
May 1, 2007
-
Stuck in Traffic and Boiling Over - Why project-level thinking can?t fix portfolio-level problems
By Stuart Elliot
Brownfield project portfolios are notoriously hard to manage. Day to day there is a constant stream of changes and challenges within projects and across the whole program. When the budget year is over
Nov 1, 2011
-
Geochemical exploration in areas of shallow till: some case histories
By A. D. Thomas, V. N. Rampton, S. Paradis, C. F. Gleeson
"A shallow till sampling program was completed on a 1 km grid over the St . George Batholith in southern New Brunswick. The ""B"" soil horizon was analyzed for Cu, Pb, Zn, Ag, Co, Mo, U and Sb and the
Jan 1, 1986
-
Operation of Enviro Clear Thickeners in Series as CCD Units
By L. W. Hamel
"Two 35 foot diameter enviro clear thickeners were tested in series as CCD units from June until October, 1978. Up to shutdown in July, we ran with automatic bed level control via the level probes and
Jan 1, 1979
-
Sampling and Assaying of Coarse Gold at La Herradura – Minera Penmont S. de R.L. de C.V., Mexico (50ed6113-280f-4c5e-b31d-b2173f6016d8)
By Pablo González, Rodolfo Espinosa, Jose-Luis Noyola, Sergio Cossio
"Minera Penmont, at La Herradura, is a joint venture between Industrias Peñoles, S.A. de C.V., and Newmont Mining Corporation. The mine is located in the northern Mexican state of Sonora. La Herradura
Jan 1, 2003
-
Nickel Rim South -Xstrata?s First New Mine in Sudbury in 20 Years
By Rick Collins
Presentation Agenda 1.Sudbury Basin 2.Diamond Drilling 3.Planned Production 4.Safety 5.Timeline 6.Sustainable Development 7.Scope Elements 8.Progress 9.Delivery Approach 10.Owners and EPCM
May 1, 2009
-
Continuous Vat Bio-Oxidation of a Refractory Arsenical Sulphide Concentrate
By P. Brad Marchant
"To properly evaluate bioleaching as a commercial alternative for sulphide concentrate oxidation, to enhance cyanidation response, it was necessary to define and optimize critical operating variables
Jan 1, 1985
-
Dust Control at Granisle Copper
By L. W. Hamel
"DUST CONTROL - GRANISLE COPPER LIMITEDINTRODUCTIONGranisle. Copper Limited is located in the north-central region of the Province of British Columbia, approximately 200 road miles north-west of Princ
Jan 1, 1976
-
Selective flotation of sphalerite from Pb-Zn ore without copper activation
By M. Leroux, S. R. Rao, J. A. Finch
"Poor Pb-Zn selectivity during Pb flotation in laboratory tests on a Mississippi Valley-type Pb-Zn ore was traced to apH effect. In the pH range, 9.5 to 11.0 sphalerite floated readily without copper
Jan 1, 1987
-
Human resources for a global company
By N. Bédard
"This paper highlights Cambior’s initial approach for recruiting and retaining its international employees, the importance of proper preparation and the support needed to ensure a competent and stable
Jan 1, 2004
-
Chemcell Petrochemical Operations at Edmonton
By J. A. Relf
The construction of refineries and gas conservation plants in the general Edmonton area in the early 1950's made available large quantities of by-product liquified petroleum gases (LPG). These gases,
Jan 1, 1962
-
Mineral processing, research and development projects in Nova Scotia conducted through the Canada/Nova Scotia Mineral Development Agreement
By D. M. Doyle, P. J. Hannon
"The Canada/Nova Scotia Mineral Development Agreement (M.D.A.) is a subsidiary of a five-year Economic and Regional Development Agreement, signed on June 11, 1984. The objectives of the M.D.A. are to
Jan 1, 1987
-
New Initiatives in Swedish Mining Research and Development
By Göran Bäckblom
The Swedish mining companies LKAB and Boliden, the equipment supplier Atlas Copco, the general contractor NCC and the specialist company Reflex joined forces in 2005 to advance the field of rock techn
May 1, 2006
-
The Development of the Coal Industry 1n Canada, from 1920 to 1935
By F. W. Gray
IN 1922, the writer communicated to the Institute a paper entitled The Development of the Coal Industry in Canada (1), which summarized the considerations set out in a series of papers (2) concerned w
Jan 1, 1936
-
Performance of Large Low- and High-Aspect Ratio SAG Mills at Gold Fields’ Ghanaian and Australian Mines
By Michael I. Brittan, Craig M. Sams
"Economies of scale and the variable characteristics of many large ore deposits have resulted in grinding installations using very large SAG mills fitted with variable speed drives. Low-aspectratio si
Jan 1, 2006
-
Optimization of cable bolting pattern for cut-and-fill stopes in a manganese mine using observational, empirical, and numerical modelling approaches
By A. Sinha, N. K. Babar, H. R. Kalihari, A. K. Chakraborty, M. R. Saharan, C. P. N. Pathak
A case study is presented on the optimization of cable bolting patterns in cut-and-fill stopes at the Chikla Mine, MOIL, India. Rock mass characterization, using Bieniawski’s RMR and Barton’s Q, indic
Jan 1, 2007