Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Towards Improving Gearless Mill Drive Availability (8130f4b0-7b8b-4d03-8ef0-64e205ed7248)

    By P. R. Warner

    This paper reviews the development of certain aspects of the electrical specifications of Anglo American’s suite of specifications for gearless mill drives (“GMDs”). These specifications are based on

    Jan 1, 2012

  • CIM
    Theoretical estimation of in situ bulk density of coal

    By G. Grant Smith

    In situ bulk density of coal is a variable applied to various aspects of coal resource evaluation, such as compositing ply analyses of coal attributes that are expressed on a weight per cent basis, an

    Jan 1, 1991

  • CIM
    Coal preparation process control

    By A. I. A. Salama, M. W. Mikhail, R. J. Mikula

    "The Coal Research Laboratory (CRL) of CANMET along with other research organizations in coal-producing countries envisage major benefits from computer applications in coal preparation, Some of these

    Jan 1, 1985

  • CIM
    Optimisation and Continuous Improvement of Antamina Comminution Circuit (f8192cd7-9bd8-4215-8434-d5a9df56e042)

    By Edward Rybinski, Serkan Dikmen, Walter Valery, Jorge Ghersi, Roberto Valle, Alex Jankovic, Javier Linares, Frank Davila

    Compañía Minera Antamina is a polymetallic mining complex that produces copper and zinc concentrates as primary products and molybdenum and lead/bismuth/silver concentrates as by-products. In 2007, Me

    Jan 1, 2012

  • CIM
    The Role of Orebody Geological Controls in Mine Planning and Design

    Orebody classification systems ? Modern classification systems ? Genesis and environment of deposition (Important in economic geology) ? Shape and structure / Form, texture and mineral content ? M

    Feb 1, 2008

  • CIM
    Petrosleeve Repair Technology

    By R. J. Smyth

    A Steel Compression Reinforcement Repair Technique (PetroSleevel) system has been developed that has the ability to repair pipeline defects such as stress corrosion cracking (SCC) without requiring we

    Jan 1, 2005

  • CIM
    Coal Mining in Poland: Methods, Production and Development

    By Zygmunt Wegrzyk

    Poland is rich in hard and brown coal reserves, which have become the most important, and steadily developing, primary source of energy. With 192.6 mill. t of hard coal production and 40 mill. t of ex

    Jan 1, 1979

  • CIM
    Reducing Titanium Ignition Risk with Overpressure Control in Pressure Oxidation

    By T. Krumins, L. Zunti, R. Frischmuth

    Titanium and titanium alloys are commonly selected for pressure oxidation autoclave vent piping and pressure control valve components, as well as autoclave internals, in high-temperature operations. I

    Jan 1, 2014

  • CIM
    Pilot plant study on improved electrostatic precipitation of copper converter dust

    By L. Lamothe, C. H. The

    "Pilot precipitator tests were conducted at Noranda's Horne Smelter in late 1978 to evaluate methods of improving converter dust collection efficiency. A bout 35 Nms/min. of converter off-gas wer

    Jan 1, 1985

  • CIM
    The Iron Blast Furnace Theory and Practice - 35 Years Later

    By I. A. Cameron

    In 1979, John Peacey and William (Bill) Davenport published The Iron Blast Furnace Theory and Practice billed as "An up to date and comprehensive treatment of blast furnaces from fundamental principle

    Jan 1, 2014

  • CIM
    The Fording River Mine-an overview

    By P. J. Urso

    "This paper discusses the mining problems encountered at the Fording River coal mine to date, and how they have been solved. All of the production now comes from surface mining, but underground hydrau

    Jan 1, 1980

  • CIM
    Potash exploration at Malagawatch, Cape Breton, Nova Scotia

    By L. Dekker

    "In 1979 Chevron Standard Limited and Irving Oil Limited intersected a thick, high-grade sylvinite zone in the Windsor Group in the Chevron Irving Malagawatch No. I well in central Cape Breton. This w

    Jan 1, 1985

  • CIM
    Revenue Mill Optimization Study

    By D. G. Cerigo

    "INTRODUCTIONAn interim report covering an uncompleted project on revenue mill optimization was presented at the invitation of Mr. C.S. Stevens, the Secretary of the Canadian Gold Metallurgists. The w

    Jan 1, 1967

  • CIM
    Environmental management from a corporate perspective

    By Henry Brehaut

    "It is difficult to know how much environmental information is absorbed by those in a position to put it to use. The following information may seem like ""old stuff"" to those whose companies are taki

    Jan 1, 1991

  • CIM
    Analysis of risk in mining projects

    By T. Alan O'Hara

    "The decision to invest capital in developing a mine and constructing a mineral processing plant and services is usually made after a feasibility study shows 'that the estimated future cash flow

    Jan 1, 1982

  • CIM
    Conversion from "post" pillar cut-and-fill mining to blasthole-a case study at Falconbridge

    By J. Lebl, S. Bharti, D. J. Cornett

    "This paper presents the design and application of blasthole mining to an area at Strathcona Mine previously employing post pillar cut-and-fill. Extensive mining in the area had led to gradually deter

    Jan 1, 1983

  • CIM
    Modeling of Change of Coal Permeability Induced by Gas Adsorption

    By C. J. Li, J. L. Feng

    In the present study we focuses on developing the poroelasticity model that deals with adsorptioninduced permeability change mostly occurred in porous media constituted several phases such as coal. Th

    Jan 1, 2015

  • CIM
    Zone 4 North 520-7350E & 590-7215E Freeze Drifts Development

    By Brian Mattie

    Overview ?Overview of the mining area ?Description of the mining phases ?Risk assessment ?Design criteria and description for freeze drifts ?Freeze wall design ?Raisebore mining Four Main

    Nov 1, 2011

  • CIM
    Automating Sag Mill Speed Control at Gibraltar Mine

    By Ken McClure, Alex Day

    Located North of Williams Lake British Columbia, Gibraltar Mine is the fourth largest open pit Copper mine in North America. Gibraltar commenced Copper concentrate production in 1972 with a mill throu

    Jan 1, 2019

  • CIM
    The Fond-du-Lac uranium deposit (7b70037e-1884-48b9-bbb6-ec12c7755eb8)

    By L. A. Homeniuk, R. Bonnar

    "The Fond-du-Lac uranium deposit is located on the northern rim of the Athabasca Basin. The uranium mineralization is, for the most part, confined to the Athabasca Group, which is underlain by pre-Hel

    Jan 1, 1982