Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Ceramics for the continuous casting of small cross section productsBy N. A. McPherson, P. C. Stevens, A. J. Rigby
"There has been a consistent move in recent years to continuously cast small billets while utilizing ceramic stream protection between tundish and mould. The need to have ceramic stream protection has
Jan 1, 1990
-
Highly Efficient Gold (I) Complex Catalyst for Hydration of AlkynesBy Eiichiro Mizushima
Catalyst systems comprising (Ph3P)AuCH3 and acid co-catalysts were found to be highly efficient for hydration of alkynes to give ketones. Methanol was the best choice of solvents. Introduction Hydra
Oct 1, 2003
-
Hyperspectral Remote Sensing Characterization of Mine Materials for Process ControlBy Isabel F. Barton, Matthew J. Gabriel, Mark D. Barton
Process control, mine-to-mill optimization, and other mining operations depend on having robust, comprehensive mineralogical and chemical characterization. However, current characterization methods re
Jan 1, 2019
-
An Approach to Assess and Control the Flotation of Minerals – SemiconductorsBy V. Panayotov, M. Panayotova
"Finding a reliable relationship between fundamental properties of minerals of non-ferrous metals and their ability to float is extremely important. The approach presented in this work allows us to dr
Jan 1, 2016
-
Regional-Scale Paleoclimate Influences on a Proposed Deep Geologic Repository in Canada for low and Intermediate Level WasteBy S. D. Normani
A Deep Geologic Repository (DGR) for Low and Intermediate Level radioactive waste has been proposed by Ontario Power Generation for the Bruce Nuclear site in Ontario, Canada. The DGR is to be construc
May 1, 2009
-
Geological Structure of the Southwest Portion of the Sudbury BasinBy E. S. Moore
Introduction The geology of the Sudbury nickel field has been studied extensively, but there are few reports dealing with the structure of the interior of the basin. It was not until the Treadwell-
Jan 1, 1930
-
Environmental and Occupational Hygiene Considerations for High-Arsenic Metallurgical TestworkBy H. Ardehali, P. Lind
Many gold deposits also contain significant quantities of deleterious elements such as arsenic. Several biological pathways are possible for arsenic exposure; special care and caution must be used whi
Jan 1, 2014
-
Selecting Effective Hydrogen Production and Delivery Optionis for Mining ApplicationsBy Kimberly M. Curran
The path by which hydrogen supply is provided to any end use application will have a strong effect on the specific economics and price stability for the product supply and the flexibility with which i
May 1, 2007
-
An Intelligent System for Monitoring Tower Cranes on Construction SitesBy M. A. Nadar
Harsh and dynamic construction sites are generally equipped with cranes in order to rapidly and conveniently move heavy loads from one location to the other. If not properly inspected and managed, thi
Aug 1, 2013
-
Network Communication Note to Assist Backhoe Operators and Dump Truck Drivers for EarthworkBy Katsutoshi Saibara
Network communication note is a cloud system for an earthwork project. It enables backhoe operators and dump truck drivers to monitor their own works in progress currently and performed up to the pres
Aug 1, 2013
-
Life has no Limits. Purifying Water Mined from Asteroids for In Situ Resource UtilizationBy Laura Kelsey
Contaminant Robust In Situ Water Extractor CRIWE Nafion-based water clean-up Extract purified water from natural extraterrestrial sources In situ water processing for downstream electrolysis
May 1, 2013
-
Transportation of Gravel for Back-Fill by Branch Aerial TramBy W. F. J. Cosser
AN agreement having been arrived at in 1935 whereby McIntyre Porcupine Mines would purchase gravel for back-filling purposes from Hollinger Consolidated Gold Mines, the aerial gear as described below
Jan 1, 1938
-
Development of Fail-Safety system for Building Wall Cleaning RobotBy J. Huh
Recently, there is growing trend to build the high-rise and install curtain walls. Following this trend, we developed robot for building wall cleaning work, which moves along Built-in guide rail of bu
Aug 1, 2013
-
Selected Methods for Shaft Lining Repairs in Polish Coal MinesShafts are the most important workings in the underground mines. Their technical state to a large extent determines the safety and efficiency of mining operations. However, in many cases periodically
Aug 1, 2013
-
An overview of wear-resistant alloys for the mining industryBy J. B. C. Wu, B. McKee
"Mining along with subsequent processing of the minerals often presents conditions where a wear- and/or corrosion-resistant alloy is needed to minimize downtime and maximize efficiency. This paper is
Jan 1, 1997
-
Determination of a Friction Angle for an Alkaline Igneous RockBy John E. Udd
The stability of a rock mass is influenced by the presence of discontinuities. In assessing stability, it is required that one should know the frictional and cohesive properties of these contained wea
Jan 1, 1979
-
Assessment of slag backfill properties for the Noranda Chadbourne ProjectBy Norman Lecuyer, Jacque Nantel
"The Chadbourne Project, located within the limits of the town of Noranda, Quebec, will make use of backfill materials to fill the voids left by the mining of stopes and pillars. A series of tests wer
Jan 1, 1983
-
Development of microprocessor-based system for mining and metallurgical applicationsBy Stavros A. Argyropoulos, Radhakrishna Valiveti, Bernard Closset
"The use of microprocessors in metallurgy is currently increasing at a very fast rate. A large number of companies are offering systems ""off the shelf"" which are aimed at the data acquisition and pr
Jan 1, 1984
-
Conditional Bias of Geostatistical Simulation for Estimation of Recoverable ReservesBy Jason A. McLennan
Conditional bias is an infamous problem with estimation methods including kriging. Changing estimation parameters will mitigate, but not remove, conditional bias. The conditional bias of kriging is we
May 1, 2002
-
Two-Stage Fluid Bed Reactor for Arsenic Removal and FixationBy K. Adham, C. T. Harris
Arsenic is often associated with copper, nickel and gold in sulphide deposits. This paper describes a two-stage high-temperature fluid bed reactor for the removal and fixation of As from ores and conc
Jan 1, 2014