Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Tyrethane for Screening Fabrication

    By S. L. Aaroe

    "TYRETHANE PRODUCTSTyrethane® is the family brand name which has been adopted by The W. S. Tyler Company of Canada, Limited to identify its polyurethane products. Since we have been manufacturing Wove

    Jan 1, 1976

  • CIM
    Implementation of Stage Grinding at the Brunswick Mine Concentrator

    By J. Andrew Cornier, Mike Cooper

    "Upon successful completion of the AG/SAG Mill project (Cooper et al., 2001) the Brunswick Mine concentrator was configured with single line processing through the AG/SAG mill, followed by two paralle

    Jan 1, 2002

  • CIM
    Miocene Epithermal Au-Ag Vein Mineralization, Dixie Claims, Midas District, North-Central Nevada; Characteristics and Controls

    By E. T. C. Spooner, Ioannou S. E.

    "Abstract- The Dixie Zone Au-Ag deposit is a low sulfidation (adularia-sericite) epithermal system located 1.4 km from the producing Ken Snyder mine (7.0 M oz Au equivalent reserve/resource), Midas Mi

    Jan 1, 2000

  • CIM
    The Pebble Copper-Gold-Molybdenum Porphyry, Alaska

    By John G. Payne

    The Pebble deposit contains three contiguous zones. In the Pebble West zone, granodiorite stocks intrude gently warped volcanosedimentary rocks that had been intruded by diorite sills and two felsic i

    May 1, 2006

  • CIM
    The Sampling System of Courier 300 Analyzer

    By Tapio Leskinen

    "l. IntroductionA reliable sampling system is the basis for an on-stream analyzer. This was realized in Outokumpu company when the development work of the Courier 300 On-Stream X-ray analysis system w

    Jan 1, 1976

  • CIM
    Tuluwaka Mine – From Greenfield to Production in 14 Months

    By Ross Nairn

    "Tulawaka Mine is a joint venture between Pangea Minerals Limited 70% (a wholly-owned subsidiary of Barrick Gold Corporation) and Northern Mining 30%. Tulawaka Mine is located in North West of Tanzani

    Jan 1, 2006

  • CIM
    Design, Construction and Commissioning of Gold Tailings Plant at Mazowe Mine, Zimbabwe

    By Peter Makuvise, Alain M. Bantshi

    "The Mazowe Gold Mine is managed by Metallon Gold (Zimbabwe) and is situated in the west-central part of the Harare greenstone belt. Orebodies here generally comprise shear zones which are in-filled w

    Jan 1, 2017

  • CIM
    Effluent Treatment with Toxicity Control at Placer Dome (CLA)’S Dome Mine

    By Trevor Yeomans, David Yaschyshyn

    "Placer Dome (CLA) operates the 90-year-old Dome Mine, in South Porcupine, Ontario.The milling operation currently processes 5 million tons of ore per year, from both the underground and Open pit mini

    Jan 1, 2001

  • CIM
    The Aurora Super-Pump, a Large Diameter Slurry Pump for Aurora North

    By D. Wolfe, R. Cleminson

    "The Aurora North mine has been operating for more than ten years, and is the source of over half of Syncrude’s bitumen production. The slurry systems at Aurora experience high rates of wear, and miss

    Jan 1, 2013

  • CIM
    Ground Control Aspects of Mining Deep Remnant Panels at Falconbridge Lockerby Mine ? A Case Study

    By J. Ran

    There are challenges in mining deep tabular ore deposits using the open stoping method, particularly mining remnant panels towards the end of mine life. The remnant panels have experienced stress conc

    Apr 1, 2005

  • CIM
    Improving Quality Control and Combustion in Pyrometallurgical Processes using Multivariate Image Analysis of Flames

    By Gianni Bartolacci, Patrice Nadeau, Szatvanyi. Gerard, Carl Duchesne, Claude Chrétien

    "Combustion is used throughout the mineral processing industry to produce steam in boilers, to dry concentrates in rotary dryers, and to apply heat treatments in pyrometallurgical furnaces. Tight comb

    Jan 1, 2005

  • CIM
    Case Study of Thickened Tailings at Goldcorp’s Musselwhite Mine in Northern Ontario

    By Jérôme Girard, Shiu Kam, Sue Longo

    "Historically, tailings management in a northern climate has involved the deposition of tailings into the Tailings Management Area (TMA) as conventional slurry. This type of system is obviously viable

    Jan 1, 2011

  • CIM
    A regressive mode of highwall failure in coal strip mines

    By B. Stimpson, K. Kosar, K. Barron

    "A number of high wall failures have occurred in some of the Alberta coal strip mines of a type called by the authors ""Multiple block plane shear slope failure "". They cause rapid deterioration of t

    Jan 1, 1986

  • CIM
    Porcupine Joint Venture A new birth ? a new venture ? a plan for success!!!

    Located in Timmins, Ontario the Porcupine Joint Venture, a pooling of assets between two existing operations (the Dome Operation of Placer Dome (CLA) and the Hoyle Pond Operation of Kinross Gold Corpo

    May 1, 2003

  • CIM
    Freeport McMoran El Paso Refinery Steam Control

    By Bradford C. Wesstrom, Ricardo Parra

    The Freeport McMoRan El Paso Refinery uses co-generation to produce some of its electricity and all of its steam. This paper will cover the operation of the co-generation plant natural gas turbine at

    Jan 1, 2019

  • CIM
    Milling Circuit Control and Optimisation: The Millstar with IES

    By J. R. Hart, V. C. Smith, V. P. Babarovich-Hansen, J. H. Schubert

    "An introduction and case study of Mintek's latest generation of Milling Circuit controller, the MillStarTM with IES (Interpreting Expert System) is presented. This paper also describes as a case stud

    Jan 1, 2000

  • CIM
    Subaqueous Deposition of Acid Generating Tailings into an Acidic Lake Environment: Pilot Column Test Results

    By Linda C. M. Elliot, Liangxue Liu

    "The deposition of tailings under water is considered to be one of the most environmentally promising and potentially cost effective methods to reduce or eliminate acid mine drainage from tailings. On

    Jan 1, 1997

  • CIM
    Paste Backfill at the Brunswick Mine

    By Michael Cooper, Eric Konigsmann, A. Moerman

    "A paste backfill plant and underground piping distribution system was commissioned at the Brunswick Mine in June, 1998. Concentrator tailings, composed mainly of pyrite and lesser amounts of silicate

    Jan 1, 1999

  • CIM
    Ensuring Safety of Autoclave Plants with Emergency Shutdown Systems

    By Murray Pearson, Jack Murray

    "The danger of autoclaves lies in the high temperatures and pressures that exist in autoclave vessels. The usage of autoclaves will continue to expand in the mining industry because of their efficienc

    Jan 1, 2009

  • CIM
    From the Ground up ? Aber - 2005 Charting its own Unique Course in Response to its Unique Position ? Mining Rocks

    By Robert Gannicott

    ??A mining company without the burden of operating a mine ??Management focused on marketing a high-quality, run-of-mine range of Canadian diamonds ??Robust revenue stream ??Specialist diamond know

    Apr 1, 2005