Dates in technical reportsBy Deborah A. McCombe
"There are a number of important dates that must be disclosed when a Qualified Person (QP) is preparing a technical report for securities purposes. The dates are discussed in NI43-101 and the Form of
Jan 1, 2003
-
Particle Bee Algorithm for Tower Cranes Layout With Materials Quantity Supply and Demand OptimizationBy L. C. Lien
Tower crane layout (TCL) is a typical construction site layout (CSL) problem, which is suitable for a wide range of work assignments and site conditions. Tower crane is one of the key facilities for v
Aug 1, 2013
-
Lining of Bored Raises at Inco ? Manitoba DivisionBy Richard N. Zimmer
This paper discusses the installation of corrugated steel linings in bored raises at Inco's Thompson Mine. The procedure for the installation of these linings is outlined and the relative advanta
Jan 1, 1978
-
Comparative issues in civil and common law contractsBy M. Boodman, E. Gertner
"At first glance, the activities related to mining and mineral exploration appear to be local or domestic, rather than international, in nature. Minerals, as corporeal or tangible property, form an in
Jan 1, 2004
-
Cyanide Destruction at Western Mines, Myra Falls OperationsBy A. G. Eccles
"INTRODUCTIONWestern Mines' copper-lead-zinc operations are located in Strathcona Provincial Park, near the geographic centre of Vancouver Island. This park includes Buttle Lake, which flows into the
Jan 1, 1977
-
The Position of Coal Supply tn Regard to the Requirements for Electric-Utility OperationsBy C. E. Baltzer
This paper highlights the position of coal supply in regard to the requirements for electric-utility operations. The text and the appended tables outline the trend of thermal power development and fue
Jan 1, 1961
-
Bumps in No. 2 Mine, Springhill, Nova Scotia (6b22a26e-d82e-4ce9-8c21-9da88f205566)By Walter Herd
For the past eight years, No. 2 mine of the Cumberland Railway & Coal Co., Springhill-a subsidiary of the Dominion Coal Co., Ltd.-has had an unenviable reputation for bumps. As the workings extended i
Jan 1, 1929
-
Expert Systems for Control of No. 4 Autogenous Mill Circuit at Wabush MinesBy P. Cleyle, K. McDermott, M. Hall, C. A. Harris
"This paper describes the implementation of an expert system for monitoring and control of the NO. 4 autogeneous mill and spiral circuits at Wabush Mines.This process control system incorporated the m
Jan 1, 1992
-
Training of mining engineers in the United States, Great Britain and southern AfricaBy A. E. Hall
"This paper summarizes findings of a two-month investigation in Zambia and Zimbabwe and a one-month visit to Britain in1990-1991. United States contacts have supplied information about that country.Za
Jan 1, 1993
-
Water Problems in the Cape Breton Coal Mining DistrictsBy J. L. Bowlby
Introduction In the following discussion, boiler-feed and mine waters will be considered from the point of view of the problems arising from the chemical nature of the mineral and gaseous impurities
Jan 1, 1934
-
Applying Simulated Annealing to Practical Mining Phase DesignBy Meimei Zhang
In the overall open pit mine planning process, mining phase design is a strategic driver in guiding and constructing the block extraction sequence and determining the annual net cash flow distribution
Oct 1, 2009
-
Slag Cleaning of Outokumpu Direct-to-Blister Flash Smelting SlagsBy J. Tuominen
Outokumpu Direct-to-Blister Flash Smelting is currently in operation in two smelters, a third one is under construction and a fourth one is in the design phase. The two smelters in operation are the G
Jan 1, 2007
-
Hollinger Shaft PracticeBy V. J. Southey
HOLLINGER mining operations have required development by 24 vertical shafts having a total length of 28,160 feet. Seventeen of these are sunk from surface and seven are interior shafts. Four surface s
Jan 1, 1939
-
Truck Selection and Application at HiltonBy L. Price, R. Hortie
Movement of ore and waste from the Hilton Mines pit is accomplished by truck haulage. With the aim of reducing costs, a study of truck fleet replacement was initiated. The study included on-site short
Jan 1, 1971
-
Oil sands reaction to cable shovel motionBy T. G. Joseph, G. W. Hansen
"This paper considers the duty cycle of an electric cable shovel and correlations with measured passive seismic responses of the underfoot oil sands material in-pit. It has been observed that the cycl
Jan 1, 2002
-
Recent Trends in Autogenous GrindingBy Bunting S. Crocker
This paper reviews the trends in the past two years in autogenous grinding throughout the world. It covers rock grinding in South Africa, Sweden, Canada, the United States, Finland and Germany. To pro
Jan 1, 1963
-
Nuclear Fuel Resources and Price TrendsBy D. D. Bell
This paper presents the history of uranium procurement and demand, and takes a look at future requirements. The three basic conclusions drawn are: (1) the productive capacity of former and existing pr
Jan 1, 1967
-
Retrofit of Agrium’s Special Standard Surge Bin Improves Reliability, Safety, and Life Cycle CostBy T. Holmes, S. Davison
"A surge bin at Agrium’s Vanscoy potash operations has been plagued with flow, wear, and corrosion issues since being built in 1967. The culprits? The bin’s carbon-steel construction, geometry, and th
Jan 1, 2018
-
Coal Research and Development in Canada -1969"In response to needs created by intensive exploration and accelerating expansion of coal mining in the Western provinces, Canadian R & D on coal is progressively widening its scope. Principal interes
Jan 1, 1970
-
Some Geological Problems of Central SaskatchewanBy F. H. Edmunds
I N presenting this paper, the writer wishes to point out some of the difficulties and problems of geological work in that part of Saskatchewan in which outcrops are few. These problems are well known
Jan 1, 1937