Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Secondary Recovery and Pressure Maintenance - Oil Recovery in Five-Spot Pilot FloodBy B. H. Caudle, L. G. Loncarie
Pilot flooding is one method of evaluating a proposed secondary recovery project. However, the amount and rate of oil recovery from an unconfined pilot area is not usually the same as from an equal ar
-
Implementing and using a fully integrated maintenance management information systemBy Paul D. Tomlingson
Part two of this two-part series covers the use of an integrated information system with administrative information, including error and absentee reports as well as open work files. Part one (ME, J
Jan 8, 1985
-
Coal - Subsurface Disposal of Mine WaterBy Robert Stefanko
With passage of the Clean Streams Act of the Commonwealth of Pennsylvania and its impact on the coal industry, considerable research has been conducted to explore various approaches to the problem, in
Jan 1, 1971
-
Anode Furnace Nitrogen Gas Purging System at Kansanshi Copper SmelterBy L. Hanschar, C. Bwalya, E. Mokola, K. Musonda, A. Makayi
This paper describes the installation, commissioning and operation of porous plugs featuring nitrogen gas purging in both Anode Furnaces at the Kansanshi Copper Smelter (KCS), a greenfield copper smel
Jan 1, 2019
-
Case History On Pipe Pile Installation - Presented At An Associated Pile & Fitting Corp. GEO-Pile Conference San Francisco, CABy Jerry F. Parola
In current practice, pile foundation design is based on a general under-standing of pile-soil interaction during installation and superstructure-pile-soil interaction after construction. The pile desi
Jan 1, 1986
-
Determination Of Design Pile Uplift Capacities Using Dynamic Pile Testing MethodsBy Juan M. Antorena
A pile driving and testing program was undertaken to evaluate installation procedures, assess capacity, particularly in uplift, of 360- and 460-mm (14- and 18-inch) square prestressed concrete piles a
Jan 1, 1995
-
Australia and New Zealand: Sharing the Vision or the Confusion?Great new drilling results! What's so sinful about being a multi-national company? Overseas protestors flown to Australia for a free holiday How to counter the protectionist danger?
Jan 1, 2000
-
Blasting a New Entrance to Carroll CaveBy Paul Worsey, Dave McCool, Ryan Freeman, Chris Wolters, Rick Hines, John Bowles
Carroll Cave, located in Camden County, in south central Missouri, is one of the most significant caves in Missouri with over 12 miles of mapped passages and over 100 known but unmapped side passages.
Jan 1, 2003
-
Optimization of Pellet Plant Process Parameters Using Six Sigma MethodologyBy Andrea McGlynn
Iron Ore Company of Canada, Labrador City 2011?Canada's largest iron ore producer, leading global supplier of iron ore pellets and concentrates ?Rio Tinto (58.7%), Mitsubishi Corporation (26.2%
May 1, 2011
-
Automatización de la planta concentradora de BHPBilliton Tintaya S. A.By Valentín Choquenaira Bombilla
El presente trabajo describe el proceso de automatización de la planta concentradora BHPBilliton deTintaya desde el punto de vista del usuario final y así proporcionar una visión global sobre los asp
Sep 12, 2005
-
Surface damage due to longwall mining - A case studyBy P. M. Lin
A subsidence monitoring program over a longwall panel was established (1) to explore the impacts of dynamic subsidence on the ground surface and structures and (2) to correlate the movements between t
Jan 1, 1989
-
Variable speed SAG millingBy M. N. Brodie
"The ability to adjust the speed of a SAG mill offers benefits to the process and to equipment maintenance. It can be provided with some slight effect on availability ranging from somewhat enhanced to
Jan 1, 2003
-
Alternative Final Cavern Linings For The East Side Access Transit ProjectBy Colin Barratt
The East Side Access (ESA) project is the largest underground rail infrastructure project under construction in New York City, USA. The Manhattan segment of the project is to be mined through rock and
-
Capacity Of Piles And Settlement Of Pile FoundationsBy M. Mets
Pile foundations have been used in Estonia since the beginning of 1960's. To evaluate the capacity of piles nearly 2,500 pile tests and 1,800 pile loading tests Have been carried out. The pile fo
Jan 1, 2000
-
Teck’s Secondary Leaching TechnologyBy H. M. Lizama, R. L. Stephens
Secondary leaching of previously leached supergene copper ore has been developed and implemented at Teck’s Quebrada Blanca operations. This consists of using in-situ leaching techniques aided by geoph
Jan 1, 2019
-
An Oxygen and Carbon Isotopic Study of Some Gold Deposits of Eastern AustraliaBy Wilson A. F
The use of stable isotopic measurements as a technique for elucidating the origin and history of the water in hydrothermal fluids is relatively new. Recept studies have emphasized the importance of me
Jan 1, 1981
-
Environmental Management Plans to Reduce Mine Closure CostsBy I F. Bell, K P. Hammerschmid
Well planned and executed environmental management plans can reduce life-of-mine operating costs and the need to deal with major environmental issues at the time of mine closure. With proper planning
Jan 1, 1995
-
Bearing Capacity Of Footings And Piles - A Delusion? - DFI Annual Meting, October 14-16,1999, Dearborn, Michigan - SummaryBy Bengt H. Fellenius
The bearing capacity equation?"the triple N formula"? is now about 50 years old. It was developed from theory of plastic resistance of metal to a cone being pressed into the surface of the metal, supe
Jan 1, 1999
-
A Methodology for Determining the Erosion Profile of the Freeze Lining in Submerged Arc FurnaceBy H. Dong
This paper presents a heat conduction model to determine the erosion profile of freeze linings in a ferronickel submerged arc furnace. Kirchhoff transformation was adopted to simplify the nonlinear eq
Jan 1, 2014
-
Unbraced Circular Cofferdam For Vent Building No. 6 At The South Bulkhead - IntroductionBy Philip Bonanno
The first major project in Boston's new access to Logan Airport was an Immersed Tube Tunnel which extended 3,600 ft. from South Boston to East Boston across Boston Harbor. Twelve tube sections, 3
Jan 1, 1994