Search Documents

  • AIME
    Secondary Recovery and Pressure Maintenance - Oil Recovery in Five-Spot Pilot Flood

    By B. H. Caudle, L. G. Loncarie

    Pilot flooding is one method of evaluating a proposed secondary recovery project. However, the amount and rate of oil recovery from an unconfined pilot area is not usually the same as from an equal ar

  • SME
    Implementing and using a fully integrated maintenance management information system

    By Paul D. Tomlingson

    Part two of this two-part series covers the use of an integrated information system with administrative information, including error and absentee reports as well as open work files. Part one (ME, J

    Jan 8, 1985

  • AIME
    Coal - Subsurface Disposal of Mine Water

    By Robert Stefanko

    With passage of the Clean Streams Act of the Commonwealth of Pennsylvania and its impact on the coal industry, considerable research has been conducted to explore various approaches to the problem, in

    Jan 1, 1971

  • CIM
    Anode Furnace Nitrogen Gas Purging System at Kansanshi Copper Smelter

    By L. Hanschar, C. Bwalya, E. Mokola, K. Musonda, A. Makayi

    This paper describes the installation, commissioning and operation of porous plugs featuring nitrogen gas purging in both Anode Furnaces at the Kansanshi Copper Smelter (KCS), a greenfield copper smel

    Jan 1, 2019

  • DFI
    Case History On Pipe Pile Installation - Presented At An Associated Pile & Fitting Corp. GEO-Pile Conference San Francisco, CA

    By Jerry F. Parola

    In current practice, pile foundation design is based on a general under-standing of pile-soil interaction during installation and superstructure-pile-soil interaction after construction. The pile desi

    Jan 1, 1986

  • DFI
    Determination Of Design Pile Uplift Capacities Using Dynamic Pile Testing Methods

    By Juan M. Antorena

    A pile driving and testing program was undertaken to evaluate installation procedures, assess capacity, particularly in uplift, of 360- and 460-mm (14- and 18-inch) square prestressed concrete piles a

    Jan 1, 1995

  • AUSIMM
    Australia and New Zealand: Sharing the Vision or the Confusion?

    Great new drilling results! What's so sinful about being a multi-national company? Overseas protestors flown to Australia for a free holiday How to counter the protectionist danger?

    Jan 1, 2000

  • ISEE
    Blasting a New Entrance to Carroll Cave

    By Paul Worsey, Dave McCool, Ryan Freeman, Chris Wolters, Rick Hines, John Bowles

    Carroll Cave, located in Camden County, in south central Missouri, is one of the most significant caves in Missouri with over 12 miles of mapped passages and over 100 known but unmapped side passages.

    Jan 1, 2003

  • CIM
    Optimization of Pellet Plant Process Parameters Using Six Sigma Methodology

    By Andrea McGlynn

    Iron Ore Company of Canada, Labrador City 2011?Canada's largest iron ore producer, leading global supplier of iron ore pellets and concentrates ?Rio Tinto (58.7%), Mitsubishi Corporation (26.2%

    May 1, 2011

  • IIMP
    Automatización de la planta concentradora de BHPBilliton Tintaya S. A.

    By Valentín Choquenaira Bombilla

    El presente trabajo describe el proceso de automatización de la planta concentradora BHPBilliton deTintaya desde el punto de vista del usuario final y así proporcionar una visión global sobre los asp

    Sep 12, 2005

  • SME-ICGCM
    Surface damage due to longwall mining - A case study

    By P. M. Lin

    A subsidence monitoring program over a longwall panel was established (1) to explore the impacts of dynamic subsidence on the ground surface and structures and (2) to correlate the movements between t

    Jan 1, 1989

  • CIM
    Variable speed SAG milling

    By M. N. Brodie

    "The ability to adjust the speed of a SAG mill offers benefits to the process and to equipment maintenance. It can be provided with some slight effect on availability ranging from somewhat enhanced to

    Jan 1, 2003

  • SME
    Alternative Final Cavern Linings For The East Side Access Transit Project

    By Colin Barratt

    The East Side Access (ESA) project is the largest underground rail infrastructure project under construction in New York City, USA. The Manhattan segment of the project is to be mined through rock and

  • DFI
    Capacity Of Piles And Settlement Of Pile Foundations

    By M. Mets

    Pile foundations have been used in Estonia since the beginning of 1960's. To evaluate the capacity of piles nearly 2,500 pile tests and 1,800 pile loading tests Have been carried out. The pile fo

    Jan 1, 2000

  • CIM
    Teck’s Secondary Leaching Technology

    By H. M. Lizama, R. L. Stephens

    Secondary leaching of previously leached supergene copper ore has been developed and implemented at Teck’s Quebrada Blanca operations. This consists of using in-situ leaching techniques aided by geoph

    Jan 1, 2019

  • AUSIMM
    An Oxygen and Carbon Isotopic Study of Some Gold Deposits of Eastern Australia

    By Wilson A. F

    The use of stable isotopic measurements as a technique for elucidating the origin and history of the water in hydrothermal fluids is relatively new. Recept studies have emphasized the importance of me

    Jan 1, 1981

  • AUSIMM
    Environmental Management Plans to Reduce Mine Closure Costs

    By I F. Bell, K P. Hammerschmid

    Well planned and executed environmental management plans can reduce life-of-mine operating costs and the need to deal with major environmental issues at the time of mine closure. With proper planning

    Jan 1, 1995

  • DFI
    Bearing Capacity Of Footings And Piles - A Delusion? - DFI Annual Meting, October 14-16,1999, Dearborn, Michigan - Summary

    By Bengt H. Fellenius

    The bearing capacity equation?"the triple N formula"? is now about 50 years old. It was developed from theory of plastic resistance of metal to a cone being pressed into the surface of the metal, supe

    Jan 1, 1999

  • SAIMM
    A Methodology for Determining the Erosion Profile of the Freeze Lining in Submerged Arc Furnace

    By H. Dong

    This paper presents a heat conduction model to determine the erosion profile of freeze linings in a ferronickel submerged arc furnace. Kirchhoff transformation was adopted to simplify the nonlinear eq

    Jan 1, 2014

  • DFI
    Unbraced Circular Cofferdam For Vent Building No. 6 At The South Bulkhead - Introduction

    By Philip Bonanno

    The first major project in Boston's new access to Logan Airport was an Immersed Tube Tunnel which extended 3,600 ft. from South Boston to East Boston across Boston Harbor. Twelve tube sections, 3

    Jan 1, 1994