Search Documents

  • DFI
    Izmit Bay Bridge Crossing: Integrated Multidisciplinary Approach Reduces Risk And Lowers Overall Project Cost For Bot Bridge Consortium

    By Jacob Chacko

    The Izmit Bay bridge, a 3-km-long suspension bridge crossing of Izmit Bay, Turkey is planned to be constructed in one of the most seismically active places in the world. The site, which has the poten

    Jan 1, 2011

  • CIM
    The San Martin project: design and operating experience in the development of a 12,000 tpd gold heap leach mine in Central America

    By Paul Hosford, Tim Haldane

    "The paper describes the fast-track development of the project from feasibility study through to detailed design and construction, highlighting the process adaptations for handling sticky ore and wate

    Jan 1, 2002

  • AUSIMM
    Construction of Reinforced Concrete Chimney at Yallourn Briquetting Works

    The principal dirnensions of the chimney were fixed as follows: Height from formation to coping, 328 ft. 8 in.; inside diameter concrete shell, 13 ft. Gin.; inside diameter of the 4~-in. brick lining.

    Jan 1, 1924

  • SME
    Analysis Of Real-Time Shield Pressures For The Evaluation Of Longwall Ground Control Problems

    By K. Saikiran, A. R. Nalla

    Longwall management, regular shield maintenance, and evaluation of ground control problems can be performed using real-time shield monitoring program. Based on real-time shield pressure data, evaluat

    Jan 1, 2000

  • AUSIMM
    The Supreme Deposit - Exploration Success at a Near Mine Target in the Reefton Goldfield

    By L Reynolds

    Oceana Gold (New Zealand) Limited (OceanaGold) has commenced mining operations at the Globe-Progress mine in the Reefton Goldfield, an area that historically produced 2.1 million ounces of gold from u

    Jan 1, 2007

  • ISEE
    Techniques for Assessing the Performance of Explosives and Initiating Devices

    By A R. Cameron

    "The number of commercial explosive products available to the mining industry has been steadilyincreasing and associated with this there has been an increase in the range of characteristics or propert

    Jan 1, 1994

  • AIME
    Reservoir Engineering - General - Partial Integration of Equations of Multiphase Flow

    By J. C. Martin

    Equations for three-phase, three-dimensional, compressible flow (including capillarity) are reduced to two-dimensional relations by a partial integration. This reduction allows three-dimensional flow

    Jan 1, 1969

  • AUSIMM
    Geology and Suggested Genesis of Cobalt-Tungsten Mineralization at Mt. Cobalt, North Western Queensland

    Cobalt/tungsten mineralization at Mt. Cobalt, located 170 km southeast of Mt. Isa in northwestern Queensland, is described. Mineralization occurs in the Kuridala Formation of the Mary Kathleen Group,

    Jan 1, 1983

  • SAIMM
    A More Corrosion Resistant Hercules? Alloy

    By A. Muwila

    Hercules? is a low nickel austenitic stainless steel developed at Mintek that has a typical composition of 9 wt% Mn, 0.05 wt% C, 2wt% Ni, 0.25 wt% N and 16.5 wt% Cr. A more corrosion resistant version

    Jan 1, 2007

  • CIM
    Greenhouse Gas Abatement Through Energy Optimization

    By David Clarry

    ?The issue ?reduction requirement ?Planning abatement steps ?Energy Management & Energy Efficiency ?Energy Recovery / Utilization ?Alternative Energy Professional Services Overview ?Capital Pro

    May 1, 2009

  • SME
    Use Of Precast Concrete Segments For The Price Road Drainage Tunnel Tempe, Arizona

    By William D. Leech, Ronald E. Romley, Gary N. Sheppard

    The Price Road Drainage Tunnel was constructed for the Arizona Department of Transportation (ADOT) in 1988 and 1989 to provide surface water drainage for the proposed outer Loop Highway (SR 117). The

    Jan 1, 1991

  • SME
    Zinc Alloys Replace Bronze in Mining Equipment Bushings and Bearings

    By Tony S. Calayag

    Throughout the mining industry today, new bearing materials - ZA* high-performance zinc-aluminum alloys - are reducing costs of maintaining and rebuilding a wide range of equipment. As replacements fo

    Jan 7, 1983

  • DFI
    The Settlements Of Buildings On Pile Foundations

    By Mait Mets

    In Estonia, the deformations monitoring of 1500 buildings are currently under investigation, buildings on pile foundations make up 10 per cent of these. In the following text we will be considering th

    Jan 1, 2002

  • DFI
    Prediction Of Jet Grout Column Diameter In Cohesive Soil

    By Chu E. Ho

    Current methods of determining jet grout column diameters are highly empirical and site specific, and do not take into account the jet hydrodynamics and soil parameters explicitly. A theoretical model

    Jan 1, 2006

  • DFI
    Pile Design For Offshore Structures Subjected To Subsidence

    By Juan J. Campo

    The Freeport-McMoRan Main Pass Mine development in the Gulf of Mexico is a complex designed to extract up to 67 million long tons of sulphur over a 40 year period. The initial development includes 15

    Jan 1, 1992

  • SME
    New York Subway Stations And Crossover Caverns—Update On Initial Support Design

    By Charles Stone, Hannes Lagger, Dru Desai

    The design methodology of the planned Second Avenue Subway Project (SAS) led to development of the initial support design to estimate cost and quantities in the Preliminary Engineering (PE) stage. Car

    Jan 1, 2007

  • SME
    A Tale Of Two Pit Lakes: Initial Results Of A Three-Year Study Of The Main Zone And Waterline Pit Lakes Near Houston, BC

    By G. Lawrence, R. Pieters, A. Leung, T. Pedersen

    The Main Zone and Waterline pit lakes at the Equity Silver Mine near Houston, BC (Canada) are the sites of a new 3-yr research program with three primary goals: 1) understanding controls on metal con

    Jan 1, 2002

  • SAIMM
    Wind Erosion Of Tailings Dams And Mitigation Of The Dust Nuisance

    By G. E. Blight

    Wind erosion can be a major cause of the loss and dispersion of tailings material from a tailings dam into its surrounding environment. Such dust dispersion can be a serious nuisance, as well as a hea

    Jan 1, 2007

  • AUSIMM
    Optimising Geotechnical Logging to Accurately Represent the Geotechnical Environment

    Typically, large volumes of data are collected during geotechnical investigations for mining projects but rarely is this done in a comprehensive manner that enables all aspects of the geotechnical env

    Nov 25, 2010

  • NIOSH
    OFR-123(5)-78 Advancement Of Mine Ventilation Network Analysis From Art To Science - Volume V Application Of PSU/MVS To The Ventilation Planning Of A New Mine

    By R. Stefanko

    In this report, the use of Penn State Ventilation Simulator (PSU/MVS) for planning and evaluating new coal mine ventilation systems is demonstrated. The simulator's application to evaluate the ve

    Jan 1, 1977