Search Documents

  • NIOSH
    Coal Dust Explosions and Their Suppression

    By Wadaw Cybulski

    The problem of coal dust explosions: Basic information about the explicability of coal dust: Main parameters of the explosibility of coal dust; Main parameters of the explosibility of coal dust; Limit

    Jan 1, 1975

  • CIM
    Intelligence for Grouting Balance

    By J. A. López-Molina, S. García, V. Castellanos-Pedroza

    "Grouting aims to reduce the permeability of rock mass below a predetermined value and has been widely used in rock engineering field for a long time. However, the injection procedure needs several em

    Jan 1, 2015

  • CIM
    Canadian Diamond Industry: An Overview

    By Robert Boyd

    The Diamond Markets ? Supply has continuously increased over the past 25 years ? However, global supply is expected to drop by 1 to 2% by 2015 ? Demand Driven Market ?Demand is expected to grow 3%

    May 1, 2006

  • NIOSH
    OFR-151(4)-83 Development Of A Procedure For Land Use Potential Evaluation For Surface-Mined Land - Appendix III: Western U.S. Surface Mine Case Study

    By Raja V. Ramani

    The recognition that surface mining need not be viewed as a permanent dedication of the land but rather as a temporary non-renewable use in a series of land uses has caused greater emphasis on the re-

    Jan 1, 1983

  • AIME
    Determination Of Room And Pillar Dimensions For The Oil-Shale Mine At Rifle, Colorado

    By Fred D. Wright, Philip B. Bucky

    FOREWORD By E. D. Gardner[$] THE present known petroleum reserves are limited, and unless important new fields are discovered the Nation will be dependent, in the not too distant future, upon im

    Jan 1, 1947

  • AUSIMM
    The Design of Continuous Thickeners for Flocculated Materials

    By Goldney L. H

    The authors review the literature and discuss the application of methods to the design of thickeners for ilocculated metallurgical pulps. The use and evaluation of flocculents is described. Experiment

    Jan 1, 1959

  • SME
    Tunnelling Under Glaciers - Construction Update: Galore Creek Mine Access Tunnel, British Columbia, Canada

    By Dean Brox

    The Galore Creek Mine project is one of the newest major mining projects under development in Canada. The project is located in a very remote area of northwestern British Columbia and is being develop

    Jan 1, 2008

  • SME
    Electrical Default Detection on Downed DC Trolley Lines – Preprint 97-38

    By J. S. Peterson, G. P. Cole

    The National Institute for Occupational Safety and Health (NIOSH), Pittsburgh Research Center (PRC), has conducted research to improve electrical fault detection on coal mine direct current (dc) troll

    Feb 24, 1997

  • DFI
    Peribonka Dam In Canada A Showcase Of Advanced Ground Engineering Techniques

    By Mazin Adnan

    The 80m high dam at the Peribonka river in the Canadian province of Quebec was designed for the generation of 385 MW of hydro electrical power (Fig.1). The complex ground conditions required the e

    Jan 1, 2008

  • NIOSH
    OFR-78-93 A Comparison Of Regulatory Processes Associated With Metal-Mine Development In Alaska And British Columbia

    By Mary E. Cocklan-Vendl

    Regulatory processes associated with development of major mining operations in Alaska and British columbia were evaluated using specific case studies. Included were one hard rock mine in Alaska (Red D

    Jan 1, 1993

  • CIM
    Mining Operations and Slurry Pipelines Update and Future

    By R. A. Hill, J. D. Pitts

    "Long distance slurry pipeline systems have been successfully trans-porting steam coal, iron concentrates, copper concentrates and limestone for an aggregate of nearly 60 years and nearly three billio

    Jan 1, 1978

  • CIM
    Successful Treatment of Complex Feeds through the Isasmelt™ and Albion Process™

    By S. Nikolic, G. M. Stieper, D. P. Mallah, B. J. Hogg, P. B. Voigt

    Copper feed materials processing is becoming more challenging, due to an incremental increase in the mineralogical and compositional complexity of these feeds. These complex and polymetallic feeds are

    Jan 1, 2019

  • AUSIMM
    Paper No. 169. The Training of a Mining Engineer.

    A GREAT deal of attention has lately been given to the discussion as to the education required for engineers, and especially for mining engineers. The Institute of Civil Engineers has had a committee&

    Jan 1, 1909

  • AUSIMM
    Investigation of the Cementation of Copper on Iron

    The kinetic and practical aspects of the extraction of copper from copper-rich solutions by cementation on iron was investigated. Tests were made on the effect of stirring speed, cupric sulphate conce

    Jan 1, 1972

  • AUSIMM
    Intensive Boring on the Wonthaggi Coal-Field, Victoria

    THE Wonthaggi coal-field lies south easterly from Melbourne at a distance by rail of 86 miles, on the flats of the Powlett River, immediately to the south of the deep-cut valleys and steep intervening

    Jan 1, 1918

  • IIMP
    Technical Evaluation of batch process and continous process for the production of cemented pasted backfill

    By Emmanuel Portilllos

    Every paste backfill system is typically unique, this being due to the particular tailings characteristics, the backfill recipe and requirements of mine planning. Key to successful transport to the un

    Sep 9, 2007

  • IIMP
    Diseño e innovaciones al método de explotación sub level caving en función al elipsoide de extracción Perubar S.A. Unidad Rosaura

    By Víctor De la Cruz

    Dado que la mina Rosaura (Lima) se dedica a la explotación de minerales polimetálicos como el zinc, plomo, cobre y plata, la caracterización geomecánica de su estructura, morfología y reservas demostr

    Sep 9, 2007

  • CIM
    Determination of Silver Bearing Minerals in the Lady Loretta ore

    By Donald Leroux, Dave Scott, Giovanni Di Prisco

    "The Lady Loretta lead-zinc deposit in Northwest Queensland, Australia contains an average of 5.9% lead, 17.1% zinc and 97 g/t silver. Ore mineralization is mostly comprised of fairly complex intergro

    Jan 1, 2002

  • IIMP
    Evaluación de las alternativas de planeamiento a largo Plazo en la Mina Toquepala

    By Tomás Gonzáles

    El presente trabajo describe la metodología usada para evaluar las estrategias de las alternativas del planeamiento a largo plazo en la explotación del mineral y el lixiviable en la Mina Toquepala.

    Aug 25, 2002

  • SME
    Investigation of Climatic Conditions in Underground Coal Mining Mining, Metallurgy and Exploration (63acde09-eb8c-4eb1-b788-340f56a030a7)

    By İbrahim Çınar, Hakan Özşen

    Mine workers in heavy and dangerous work are under several physical risk factors, for example temperature, humidity, noise, vibration, lighting and air velocity. Thermal comfort includes parameters su