    Comparison of a and ß Methods with CPT and Pile Load Test Data: A Case Study with Attention on Soil Setup Effects

    By Mohammadreza Khanmohammadi, Kazem Fakharian

    "AbstractIn driven piles, the gradual dissipation of excess pore water pressure and consequently the soil setup significantly contribute to increasing the pile capacity with time. The question is rise

    Jan 1, 2014

  • SAIMM
    Integrated Furnace Controls: Implementation On A Covered-Arc (Shielded Arc) Furnace At Cerro Matoso

    By T. Gerritsen, R. C. Delgado, J. Janzen, E. R. Veloza

    The paper describes the components of an Integrated Furnace Control system for covered-arc (shielded arc) smelting with results from the recently started 75 MW Cerro Matoso Line 2 Furnace. The paper s

    Jan 1, 2004

  • SME-ICGCM
    Monitoring Coal Mine Seismicity with an Automated Wireless Digital Strong-Motion Network

    By Peter Swanson

    A seismic monitoring network has been installed in western Colorado (USA) in the vicinity of three underground coal mines to (i) distinguish and characterize seismic activity as either mining related

    Jan 1, 2008

  • ISEE
    An Automated Approach to Blast Optimization Through Performance Monitoring of Blast Hole Drills and Mining Shovels

    By M Scoble

    This paper will report on the application of data collected through the performance monitoring of large diameter surface rotary blasthole drii and electric mining shovels, in an integrated approach to

    Jan 1, 1992

  • CIM
    Design, Start-up and Optimization of Pb & Zn Flotation Circuits Utilizing Ultra-Fine Grinding Technology

    By Lyne Côté, Jose Adante

    "The Caribou underground mine, 50 km west of Bathurst, the Restigouche open-pit mine, another 30 km west and the concentrator located at the Caribou mine site resumed operations in July 2007 after a n

    Jan 1, 2009

  • SME
    Estimation Of Capital And Operation Costs Of Backhoe Loaders

    By B. Oraee

    Accurate estimation of equipment costs is a key factor in feasibility study and evaluation of design alternatives of mining projects. In this paper, capital and operation costs of backhoe loaders are

    Jan 1, 2011

  • CIM
    Water Utilization by Oil Sands Mines in Alberta

    By Leslie F. Sawatsky

    Raw water import requirements for oils sands mines depends mainly on factors such as ore processing rate, ore material characteristics, tailings processing technology, tailings storage systems, proces

    May 1, 2004

  • ISEE
    Regulation Compliance: Security in Manufacturiing, Transportation, Storage and Use of Commercial Explosives

    By John Capers

    •The IME is the Safety and Security Association of the commercial explosives industry in the United States and Canada. •Founded in 1913 •Board of Governors •5 Standing committees- 1. Technical 2. Envi

    Jan 1, 2006

  • SME
    Ventilation planning at Energy West?s Deer Creek Mine

    By L. Tonc

    In 2004, the engineers at the Deer Creek Mine located near Huntington, Utah initiated the ventilation planning to exploit a remote area of the mine?s reserves. This area was located under a mountain w

    Jan 1, 2009

  • NIOSH
    Helium ? General Summary (9246d274-98aa-4b94-b5e5-a562b0d0980a)

    By Harold W. Lipper

    BUREAU OF MINES helium plants produced a. record-breaking 477 million cubic feet of this essential element in 1959. The supply of helium was less than the demand before operations were resumed at the

    Jan 1, 1960

  • SME
    Eight problems examined that point out serious inadequacies in testing for drug use

    By James L. Weeks

    Introduction This paper attempts to summarize some of the major criticisms of drug testing. Eight problems with drug testing are discussed. These are: • It does not measure something employers have

    Jan 11, 1987

  • SAIMM
    Rapid Installation Of Support In A Partially Raise Bored Shaft Using Sky Jacks. ? Synopsis

    By D. Strachan

    Installation of support in known poor ground intersections during reaming operations requires rapid access to stabilize the shaft wall and thus to prevent the loss of the shaft through scaling. This i

    Jan 1, 2009

  • NIOSH
    RI 7779 The Spectral Growth Of Expanding Flames - The Infrared Radiance Of Methane-Air Ignitions And Coal Dust-Air Explosions

    By M. Hertzberg

    Results of a comprehensive study of the absolute spectral radiance of the infrared emissions from methane-air explosions are reported. The spectral growth of these expanding flames were recorded with

    Jan 1, 1973

  • NIOSH
    RI 8109 Hydrochloric Acid Digestion and Solvent Extraction of Western Phosphates

    By Joan T. May

    The Bureau of Mines conducted laboratory tests to evaluate the production of high-purity H3P04 by HCl digestion and solvent extraction. Both batch and bench-scale continuous tests were made. Western p

    Jan 1, 1976

  • CIM
    Modeling and Simulation of SkimAir® Flash Flotation as a Part of Grinding-Flotation Circuit – Case Study in Esperanza, Chile

    By Luis Bernal, Pertti Lamberg

    "SkimAir®, Outotec’s Flash Flotation unit, is placed in the grinding circuit to float the valuable liberated mineral particles from the circulating load of the grinding process while still relatively

    Jan 1, 2009

  • SAIMM
    Hatch Developments In Furnace Design In Conjunction With Smelting Plants In Africa

    By R. Sullivan, K. Joiner, B. Emery, M. de Vries, F. A. Stober, L. R. Nelson, J. M. A. Geldenhuis

    Keywords: Pyrometallurgy, smelting, converting, furnace design, furnace retrofit, high-intensity smelting, copper coolers, plate coolers, waffle coolers, tap-blocks, lower sidewall air-cooling, wall h

    Jan 1, 2006

  • SME
    Factors in the Variability of Measured Surface Settlements over EPB Driven Tunnels in Soft Clay

    By S. Boone, J. N. Shirlaw

    INTRODUCTION Soft, near normally consolidated clays generally provide ideal conditions for tunneling using Earth Pressure Balance (EPB) shields. It is easy to turn the clay into a low permeability,

    Jan 1, 2007

  • SAIMM
    Pitfalls In Vezin Sampling For Finely Crushed Materials (4f77bfd3-c00c-4e22-9de0-dc8343fb6770)

    By C. Kruger

    Anglo American Platinum has adopted a strategy of best practice principles (BPP) for sampling, mass measurement, analysis, and metal accounting for more than a decade now. When new plants are designed

    Jan 1, 2014

  • SME
    Planning and Fast Track Tunnel Design in Historical Downtown Charleston

    By James McKelvey, Larry Drolet, Jason Swartz

    INTRODUCTION When divers discovered that sections of a tunnel housing the pipeline that conveys wastewater from the Charleston Peninsula to the Plum Island Wastewater Treatment Facility had caved

    Jan 1, 2005

  • SME
    Use of Simulation to Validate Load And Haul Requirements at Cortez Gold Mines

    By W. L. Jacobsen, T. L. Dyer

    Cortez Gold Mines is completing a Feasibility Study for a new open pit gold mine in north central NV. The production schedule calls for a peak in material movement. This schedule is based on current o

    Jan 1, 2006