    Kentucky Route 9 - Licking Pike Widening Design Build Slope Stabilization

    By Frederick W. Slack

    This paper will discuss the inherent value engineering associated with the design and construction of approximately 184,000 SF of anchored tieback wall, installed as part of the widening and drainage

    Jan 1, 2003

  • SME
    Construction of Nine Shafts for the Manhattan Section of the New York City Water Tunnel No. 3

    By Yifan Ding, Shemek Oginski, Patrick Finn

    The Manhattan section of the New York Water Tunnel No. 3 constructed by the Schiavone/Shea/Frontier-Kemper Joint Venture is a $668 million project. The contract includes a tunnel drive of 8.85 km (29,

    Jan 1, 2007

  • ISEE
    Innovative Blasting Mine Life Extension at a Coal Mine in Australia

    By R. Bitmead, R Barker, A. Drake

    The opencut coal mine is located about 50 km west of Brisbane, the capital city of Queensland in Australia and produces about 140 000 tonnes per annum of high grade steaming coal utilising a small tea

    Jan 1, 2002

  • CIM
    Utilizing Strain Criteria to Predict Highwall Stability Performance

    By H. Warren Newcomen

    Assessments of the stability performance of open pit highwalls have traditionally been based on consideration of surface movement rates. Although generally accepted in industry, this approach presents

    May 1, 2004

  • SAIMM
    The ?Other Class? Of Pipeline Coatings

    By Gerard de Vries

    pipeline industry and are still growing in size. Liquid epoxy and polyurethanes are an excellent choice for whatever the aggressiveness of the substance transported and whatever the harmful outside in

    Jan 1, 2006

  • SME
    Design and Construction of the Fields Point Tunnel Pump Station for the Narragansett Bay Commission CSO Abatement Program, Providence, Rhode Island ? Introduction

    By Geoffrey Hughes

    The Narragansett Bay Commission (NBC) is a regional sewer authority that serves ten communities in the Providence, Rhode Island metropolitan area. From 1992 to 1999, the NBC developed a comprehensive

    Jan 1, 2008

  • IIMP
    Mejorando la eficiencia de la operación mediante el control avanzado en Molienda

    By Juan Kobashicawa, Bernardo Falcón

    En este trabajo se explican los controles automáticos desarrollados (In-House) e implementados en el circuito de Molienda de Compañía Minera Antamina, el cual abarca Molinos SAG, de Bolas y los Hidroc

    Sep 1, 2017

  • CIM
    Constancia Project Process Plant Design and Start Up

    By David Stephenson, Hugo Granados, Steven Klohn

    "HudBay’s Constancia project is a copper molybdenum concentrator located in southern Peru. In 2010 Ausenco was contracted to perform a feasibility study optimization review which resulted in an improv

    Jan 1, 2016

  • IIMP
    Modelamiento y Simulación Sistémica (software) para facilitar la evaluación del proceso molienda - Clasificación en plantas concentradoras

    By Juan Oswaldo Alfaro, Angel C. Nuñez, Hildebrando A. Cóndor

    Se ha desarrollado un software para facilitar la evaluación del proceso molienda-clasificación en plantas concentradoras. Se ha modelado en UML-Lenguaje Unificado de Modelado; los datos e información

    Sep 1, 2017

  • SME-ICGCM
    Application Of Computer Programs For Rock Pressure Control

    By V. M. Shick

    For practical purposes of the use of information resources in the field of geomechanics and mine surveying with accepted mining technology in mines, the authors have developed the packaged software pr

    Jan 1, 1996

  • NIOSH
    OFR-28-90 Industrial Minerals Of The Valdez Creek Mining District, Alaska

    By D. D. Southworth

    In 1987, the Bureau of Mines initiated a mineral assessment of the 5.7 million-acre Valdez Creek Mining District (VCMD). Following a literature search and interviews with persons knowledgeable about d

    Jan 1, 2011

  • AUSIMM
    Atomic Absorption Analysis for Nickel Using a Resonance Detector

    Resonance re-emission from nickel vapour affords a convenient method for isolating the resonance lines at 3415A, 3515A, and 3524A. The vapour is generated by cathodic sputtering and is illuminated by

    Jan 1, 1968

  • ISEE
    Presplitting Techniques for Conventional, Air Deck and Dimension Stone Applications

    "The objective in controlled blasting is to reduce overbreak to control the final pit wall slope, shaft, drift ditch, bench, etc. to the final planned excavation limit. The six main types of controlle

    Jan 1, 1994

  • ISEE
    Techniques to Assess the Influence of Blast Design Parameters on Airblast and Blast Vibration

    By Robert Hivick, Frank Sames

    The control of environmental effects, especially blast vibration and airblast, has become a dominating planning criterion for most surface blasting operations. Compliance with existing regulations is

    Jan 1, 1999

  • SME
    Shaft Construction in Toronto Using Slurry Walls

    By Vince Luongo

    PROJECT DESCRIPTION The York Durham Sanitary System (YDSS) Interceptor in the Town of Richmond Hill located just north of Toronto, Ontario, Canada will see the construction of a tunnel extending a

    Jan 1, 2007

  • DFI
    Press-In Piling Technology For Sustainable Construction

    By Philip Dubbeling

    Conventional dynamic sheetpiling techniques are ill-suited to urban development because of the emission of excessive noise and ground vibrations. Drilled shafts and slurry walls alleviate some of thes

    Jan 1, 2006

  • SME
    Columbus Circle Station Complex - History and Rehabilitation

    By Aram Grigoryan

    This paper addresses historical aspects and construction sequencing of the subway complex under Columbus Circle in Manhattan; the structural elements of the rehabilitation and new construction; and th

    Jan 1, 2008

  • SME
    Effect Of Ore Particle Size On Gold Dissolution In A Cyanide Solution

    By J. Egan

    The recovery of gold by ore leaching is influenced by the size of the particles and the chemical environment. Within the experimental error associated to the testing of gold ore, results of a series o

    Feb 27, 2013

  • ISEE
    A New and Reliable Technique for Safely Removing Underground Rock Hang-ups

    By Brian Micke, Mick Gavrilovic

    The problem of rock hang-ups in underground mining operations has been a continuing one since the days of the “hang-up man”. This position commanded the highest pay of any underground worker in many h

    Jan 1, 1999

  • SAIMM
    The Thermophysical Properties Of Raw Materials For Ferromanganese Production

    By M. Ksiazek

    Keywords: Thermal conductivity, thermal diffusivity, flash method, specific heat capacity, manganese ore Manganese ferro-alloys manufacturing involves a combination of quality raw materials and an

    Jan 1, 2011