Search Documents

  • SME
    Evolution Of Controlled Blasting Practices Dragon Products Company, LLC Quarry Operations, Thomaston, Me

    By K. Boakye

    This paper presents the results of a review of historic blast design practices at the Dragon Products Company, LLC (Dragon) Quarry Operation, along with the results of two different blast design vibra

    Feb 27, 2013

  • NIOSH
    Raising The Bar Of Ventilation For Large-Opening Stone Mines

    By R. H. Grau, S. B. Robertson, R. B. Krog, T. P. Mucho

    Due to the difficulties of ventilating large opening stone mines, the effective dilution of diesel particulate matter and noxious gases has often been problematic. Since stone mines have large opening

  • SME-ICGCM
    Bi-Directional Shield Recovery in a Wide Face Longwall Move with a Pre-Driven Recovery Room under Weak Roof Conditions

    By Peter Zhang

    Shield recovery in a longwall move is normally conducted from tailgate to headgate. However, if the face is wide and the immediate roof is weak, difficult conditions with considerable roof sag, excess

    Jan 1, 2007

  • DFI
    Cut-Off Walls For Diamond Mining In The Arctic

    By Wolfgang G. Brunner

    A 3800 m long temporary water-retaining dike has been constructed under extreme conditions in the harsh northern climate to enable two of the kimberiite pipes at the Diavik Diamond Project reserve to

    Jan 1, 2003

  • NIOSH
    Coal Mine Seismicity And Bumps: Historical Case Studies And Current Field Activity

    By Keith A. Heasley, John L. Ellenberger

    The National Institute for Occupational Safety and Health (NIOSH) has continued the research role of the former U. S. Bureau of Mines to develop techniques that will reduce the hazards in the mining w

  • CIM
    Recent Gravity Improvements at the Porcupine Joint Venture

    By Ron Millions, J. A. Folinsbee, Ishwinder Grewal, Michael Fullam, Don Strickland, Tony Y. Chong

    "Since milling began in 1912, the Dome mill, now part of the Porcupine Joint Venture (PJV), has been expanded several times, the most recent increasing the milling rate from 3,500 to 11,500 tonnes per

    Jan 1, 2004

  • AUSIMM
    The Application of Hydraulic Stowing Partially Deslimed Mill Residue in Stopes at Broken Hill South Limited

    CONTENTS: Broken Hill The mixing stations.Operating and mixing apparatus.Pulp distribution.Stope preparation.Filling procedure.Consolidation of old fill.Drainage:Pulp density tests. Life of sand pipe

    Jan 1, 1944

  • DFI
    Unusual Dolphin Monopile Structure

    By C. T. Christensen

    The paper gives an outline of the design, installation and performance of a series of mooring and berthing dolphins for a major ferry berth outside the port of Elsinore, Denmark. The Dolphins are larg

    Jan 1, 1989

  • NIOSH
    Technology News - No. 517 - New Updates For NIOSH Coal Mine Ground Control Software

    The NIOSH suite of coal mine ground control software addresses nearly every aspect of coal mine ground control planning, including geologic characterization, mine layout, pillar design, and support se

    Jan 4, 2006

  • IIMP
    The sleeper pit lake - a successful model for pit closure

    By Martin Williams

    During the coming decade, many of the first generation of ‘super-pit’ gold and base metal mining operations in North and Latin America will reach the end of their economic lives. The closure of such p

    Apr 22, 2003

  • ISEE
    Blasting Bridges and Culverts in Fish Streams: Water Overpressure and Vibration Analysis

    By Kristen Dunlap

    There are several thousand remote stream crossing structures in the Tongass National Forest in need of removal. In 2007 thirty-three collapsing log bridges, log culverts, and metal culverts no longer

    Jan 1, 2009

  • TMS
    Study On Tin And Zinc Recovery And Pellet Preparation For Blast Furnace From Iron Concentrate Containing Tin And Zinc

    By Yuanbo Zhang

    Keywords: Complex Iron Ores, Roasting, Tin, Zinc, Pellets, Comprehensive Recovery. The complex iron ores containing tin, zinc are typical refractory ores. Large reserves of the ores are found in Ch

    Jan 1, 2005

  • CIM
    Stope Sequence Optimization for Narrow Vein, Long Term Mine Planning

    By André van Wageningen

    Long term mine scheduling is one of the most difficult optimization problems. The problem is said to be NP-complete in that the best possible solution cannot be found any quicker than checking all pos

    Oct 1, 2004

  • CIM
    In-Situ Recovery in Hard Rock Applications: Idealistic Notion or Realistic Future Processing Option?

    By L. Vollert

    In-situ recovery of metals is presently experiencing a revival not seen since early applications in amenable copper oxide deposits, uranium and generally applications where neither, porosity and perme

    Jan 1, 2019

  • DFI
    Some Problems Encountered During Pile Installation - Synopsis

    By [D. N. ] Naresh

    During different activities pile installation like pile boring, concreting etc., it is likely that various problems, depending up on site condition may be encountered. There are possibilities that som

    Jan 1, 1996

  • CIM
    The Use of End Members for Grind – Recovery Modeling, Tonnage Prediction and Flowsheet Development at Raglan

    By L. Boyd, A. Charland, G. Potts, D. Fragomeni, N. O. Lotter

    "The Raglan orebody and concentrator has been the subject of study in Process Mineralogy at Falconbridge since 1998. (Lotter and Tuzun, 1998) The orebody is classified into three distinct textural gro

    Jan 1, 2005

  • SAIMM
    Advanced Methods To Characterize Thermal Properties Of Quartz

    By E. H. Myrhaug, K. Aasly, T. Malvik

    Six different types of quartz and quartzites used as raw materials by ferroalloy plants have been investigated with respect to their thermo mechanical properties. In order to investigate the effect of

    Jan 1, 2007

  • DFI
    A Need To Reevaluate Attitudes In Engineering And Construction

    By d&apos, E. Appolonia

    A construction project is successful when all parties contributing to it are winners. It is not a success when there are winners and losers. Con­tractors, engineers, suppliers and equipment developers

    Jan 1, 1985

  • SME
    Practical Application Of A Partial Cab To Reduce The A-Weighted Sound Level At The Operator’s Station On Surface Drill Rigs (16e0ea79-d925-4b2c-a99c-4b4744e63b41)

    By P. Jurovcik, D. Yantek, D. Ingram

    The National Institute for Occupational Safety and Health (NIOSH) identified hearing loss as the most common job-related disease in the United States in its 1996 National Occupational Research Agenda.

    Jan 1, 2007

  • SME
    What we learned about MINING ENGINEERING and you

    By Marianne Snedeker

    In September 1985 we published a questionnaire asking about the content of MINING ENGINEERING and about your interests. By Dec. 10, our cutoff date, we had 430 responses, representing about 1.5% of th

    Jan 1, 1986