Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
A Review Of Previous Work On Important Properties Of Quartz For FESI And SI Metal ProductionBy E. H. Myrhaug, K. Aasly, T. Malvik
Quartz is one of the main raw materials for the carbothermic production of ferrosilicon and silicon metal. The ideal process is written: SiO2 + 2C = Si + 2CO The real process is much more compli
Jan 1, 2007
-
Recuperacion de particulas ultrafinas de casiterita en relaves de la mina San Rafael - MINSUR S.ABy Ian Gordon Hall
El presente texto describe el proceso de recuperación de las partículas ultrafinas de casiterita en los relaves de la mina San Rafael a través de diversas pruebas metalúrgicas, donde se usaron dos tip
Sep 12, 2005
-
Improving Truck-Shovel Energy Efficiency Through Discrete Event ModelingBy K. Awuah-Offei
Energy efficiency has become significant due to cost and environmental considerations. Comminution and material handling have been identified as the two most energy intensive processes in mining. The
Jan 1, 2012
-
Helping Banks To Manage Mineral Land TrustsBy S. M. Pickering
Banks frequently manage large privately owned mineral land trust accounts for estate heirs. The bank has a fiduciary obligation to follow the “Prudent Man Rule”, which requires that trust properties
Jan 1, 2002
-
Times Square Connection: ?Supporting The Cross Roads Of The World?By Victor F. Paterno
In December of 2007, a joint venture of J.F Shea, Skanska and Schiavone referred to as S-3II, was awarded a $1.15 billion (? 886,880,000) contract to construct the run-ning tunnels and station structu
-
Slurry Shield Tunneling in Portland—West Side CSO Tunnel ProjectBy James J. Kabat, James A. McDonald
Impregilo/SA Healy JV recently completed this Project using the first slurry shield TBM’s in the United States. The Project used two TBM’s to mine 18,000 feet in sands, gravels, and silty alluvial mat
Jan 1, 2007
-
New Developments With The Coal Mine Roof RatingBy Christopher Mark, Gregory M. Molinda, Timothy M. Barton
The Coal Mine Roof Rating (CMRR) was first presented at this Conference nine years ago. Since its introduction, the CMRR has been incorporated into many aspects of mine planning, including longwall p
-
Thermodynamic Equilibrium of Hydroxyl Complex Ions in Mn2+-H2O SystemBy Yunyan Wang
Diagrams of pc-pH for the complex ions concentration and pH value and -g- for activity coefficient and ionic strength ln±MnSOI4had been drew based on the thermodynamic principle of coordination chemis
Jan 1, 2010
-
Model-based control of column flotation: Toward industrial application and real-time optimizationBy André Desbiens, Jocelyn Bouchard, René del Villar
"The metallurgical performance of the column flotation process is determined by the concentrate grade and recovery. Although the former can be continuously measured using an on-stream analyzer, the la
Jan 1, 2003
-
Examples of Mine TimberingSo many emergencies that crop up in mining necessitate a departure from ordinary methods that the writer has been led to illustrate a few of the examples that have come under his notice during a somew
Jan 1, 1902
-
Characterization Of Mechanical Properties And Microstructure In Copper Nanopowder Alloyed Al7075 T651 Via Friction Stir ProcessBy Dongok Kim
Regardless of the advantages of the Friction Stir Process (FSP), for age-hardened aluminum alloys, the mechanical properties such as hardness in the stir zone decreased after FSP due to the growth or
Jan 1, 2006
-
Reducing Enclosed Cab Drill Operator’s Respirable Dust Exposure At Surface Coal Operation With A Retrofitted Filtration And Pressurization System (83490ae4-de2e-4245-8093-9fec0a123d31)By W. A. Heitbrink, J. D. Ashley, R. E. Gresh, J. A. Organiscak, A. B. Cecala
Many different types of mobile equipment used in surface coal mining utilize enclosed cabs to protect equipment operators. The overburden removal process is extremely dusty and can cause excessive ex
Jan 1, 2002
-
Construction of the Big Walnut Augmentation/Rickenbacker Interceptor Tunnel (BWARI, Part 1) —Columbus, OhioBy Glen D. Frank, Jeremy P. Theys, Mina M. Shinouda, Gary W. Gilbert
PURPOSE OF THE PROJECT The Big Walnut Augmentation Rickenbacker Interceptor project began in 1995with the preparation of the Scope of Services for the design of the Rickenbacker Interceptor, with
Jan 1, 2007
-
RI 9259 - Impact of Water Sprays on Scrubber Ventilation EffectivenessBy Jon C. Volkwein
The U.S. Bureau of Mines conducted a study to assess the impact of a directional water spray system on a unique single inlet dust scrubber on a low-profile mining machine. Tests were conducted in a fu
Jan 1, 1989
-
Managing Geologic Uncertainty in Pit Shell Optimization Using a Heuristic Algorithm and Stochastic Dominance Mining, Metallurgy and Exploration (444ce330-9c49-45a1-9758-2c54438ceb81)By · J. B. Boisvert, O. Leuangthong, T. Acorn
Optimizing final pit limits for stochastic models provides access to geologic and economic uncertainty in the pit optimization stages of a mining project. This paper presents an approach for optimizin
-
Managing Geologic Uncertainty in Pit Shell Optimization Using a Heuristic Algorithm and Stochastic Dominance Mining, Metallurgy and ExplorationBy · J. B. Boisvert, O. Leuangthong, T. Acorn
Optimizing final pit limits for stochastic models provides access to geologic and economic uncertainty in the pit optimization stages of a mining project. This paper presents an approach for optimizin
-
Amax Uses Practical Approach to Dewatering at Its Sleeper MineBy W. David Tyler
Any mining or engineering-construction excavation that extends below the water table must be dewatered. In many situations, the ground is of low permeability or the workings extend only a short distan
Jan 1, 1991
-
The Taranaki Oil-FieldTHE Taranaki oil-field is situated on the western side of the North Island of New Zealand, at about its widest part, and may be said to be the most compact and fertile part of the Dominion, for, with
Jan 1, 1912
-
Boddington Gold Mine - An Example of Sustaining Gold Production for 30 YearsBy G Veillette, B Parker, S Hart
This paper provides a history of the challenges that were experienced while treating both the clayey oxide gold ores and the supergene copper-gold ores at the Boddington Gold Mine during the period 19
Jan 1, 2007
-
Efecto de la modernizacion de la fundicion de SPCC sobre la calidad de los anodos y su proceso de electrorefinaciónBy Flavio Begazo Mamani
Recientemente Southern Perú desarrolló un nuevo proyecto donde se modernizaba la planta de Fundicion y se reemplazaba el convencional horno reverbero por la tecnología del ISASMELT, capturando más del
Sep 12, 2011