Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Presidential Address, 1959A President, soon after he is appointed, sees looming ahead of him the Presidential Address; and in something approaching despair wonders what he can possibly talk about which might hold the interest
Jan 1, 1959
-
RI 5899 Electric Smelting And Gaseous Refining Of Cement-Copper Precipitate ? SummaryBy F. E. Brantley
Research was undertaken by the Bureau of Mines to assess the technical feasibility of smelting cement-copper precipitate in an electric furnace to produce commercial-grade copper. The blister-grade co
Jan 1, 1961
-
Innovations in Gold and Silver Recovery: World OverviewBy Hans von Michaelis
"INTRODUCTIONThe renaissance in gold and silver recovery technology has continued to unfold and it is appropriate to review some of the useful new technologies as well as try to identify some of the i
Jan 1, 1985
-
Real-Time Data Reconciliation for Process ControlBy Éric Poulin, Simon Gariépy, Mario Paredes Malca
"While the design of a control strategy depends on the available process knowledge, its implementation depends on the available process information. On-line chemical analyzers are today widely spread
Jan 1, 2006
-
Extensive Mechanization Produces Record Performance In Drill-Blast TunnellingBy Hans Hamrin
Three drill-blast cycles of 3.1 m advance achieved in one working shift of 7.5 hours at the Holsfjorden Tunnel project in Norway. The tunnel, 5235 m long, with a cross section of 8.6 m2, was completed
Jan 1, 1987
-
I-880 Replacement Project (Cypress Freeway) Large Diameter Driven Pipe Pile Foundations Test Program And Construction Test Pile Program - Indicator Pile Test Program - Field WorkBy Darrell L. Beddard
Pile driving started October 29, 1993 and was completed on January 27, 1994. Field work included driving piling from ground surface at one site and at or near proposed footing elevations for the remai
Jan 1, 1996
-
Solutions to Acid Mine Drainage at Blackball and Sullivan MinesBy K Gordon
A methodology for assessment and remediation of acid mine drainage (AMD) developed at the Sullivan Mine in the West Coast Region has been applied to the closed Blackball Mine, Blackball, West Coast Re
Jan 1, 2004
-
Copper Mining in Zambia – History and FutureBy Cade Mweemba, Alex Mwanza, Jackson Sikamo
"The Zambian Copper mining industry as we know it today has its genesis from early in the 20th century in the 1920s. Consistent private sector-driven investment in the industry over a period of over 5
Jan 1, 2015
-
Applicable Analytical Tools For A Seismic Design Of Underground ExcavationsBy Christopher M. St. John, Tony F. Zahrah
Empirical and numerical methods are the two extremes of the tools available for the seismic design of subsurface excavations and underground structures. Both have their limitations: when relying on pu
Jan 1, 1985
-
Bearing Capacity Of Pile By Curve-Fitting Method ? SynopsisBy Z. Q. Zhou
It is the first worke in design of pile foundation to determine the carring capacity of single pile, and a static loading on site is considered to be the lost derect and reliable way. All values P and
Jan 1, 2010
-
A Simple Evaluation Of Dynamic Pile TestsBy D. Kolymbas
A simple formula is introduced which allows the evaluation of dynamic pile tests. The following case is considered: The pile top is dynamically loaded by an impact. The velocity v of the pile top is r
Jan 1, 1989
-
RI 3610 Beneficiation Of Alunite ? Introduction (0bc4c843-f77c-4802-a3e8-7e9cfe26205c)By Alton Gabriel
During the fall of 1940, J. R. Thoenen of the Mining Division, Bureau of Mines, accompanied by the senior author, surveyed the more important domestic alunite deposits. Although the study was designed
Jan 1, 1942
-
Use of Porous Concrete in Secant Bored Pile WallsBy Matthias Pulsfort, Markus Herten, Rolf Breitenbücher, Claudia Fierenkothen
"Secant bored pile walls are frequently used as retaining walls in watertight excavations to cut off ground water aquifers and are subsequently exposed to ground water pressure loading in addition to
Jan 1, 2017
-
RI 3610 Beneficiation Of Alunite ? IntroductionBy Alton Gabriel
During the fall of 1940, J. R. Thoenen of the Mining Division, Bureau of Mines, accompanied by the senior author, surveyed the more important domestic alunite deposits. Although the study was designed
Jan 1, 1942
-
High Stress Pile Testing At Soldier FieldBy Michael H. Wysockey
The load test program for the pile foundation at Soldier Field included static and dynamic load tests at four locations around the site. The dynamic tests were run with no knowledge of the static resu
Jan 1, 2002
-
English Sea Drives - A Success StoryBy Joseph L. Margin
From a stubborn start to record setting performances in little over a year, that is the story of the English Running Tunnel Boring Machines. The program to transfer technical information on these high
Jan 1, 1991
-
Collaborative Strategic Research Initiatives: Their Benefits and Best Practice Approaches for Establishing the SameBy Daniel Brutto
"Environmental considerations are a key driver within marine mining consenting processes across different national and international legislative regimes and are critical in shaping the global public p
Sep 1, 2014
-
New Monitoring Technologies for Measuring the in-situ Performance of Rock BoltsBy Hani Mitri
Understanding the interaction between rock bolts and underground rock movement is critical for safe and cost effective underground excavation design. Although early research on this subject involved a
Jan 1, 2012
-
Meadowbank Mine Process Plant Throughput IncreaseBy J. Allaire, P. N. Muteb
The Meadowbank mine is operated by Agnico-Eagle Mines Ltd. and is located in the Kivalliq District of Nunavut in northern Canada. The process plant operates presently at a throughput of 11,500 tpd wit
Jan 1, 2013
-
The DC WASA Anacostia River CSO Control Tunnel ProjectBy David C. Girard, Larry Williamson, Leonard R. Benson, Ronald E. Bizzarri
On the east side of Washington DC, the DC Water & Sewer Authority is developing a Facility Plan for the Anacostia River CSO Control Projects, including 8 to 12 miles of CSO storage/conveyance and floo
Jan 1, 2007