Search Documents

  • IIMP
    Utilización del Programa GoldSim para aplicaciones de planeamiento estratégico

    By Siegfried Arce

    Existen muchas herramientas para la gestión de proyectos. Sin embargo, éstos no están en capacidad de realizar análisis de riesgos y evaluar alternativas que consideren incertidumbre. En ese sentido,

    Aug 25, 2002

  • ISEE
    Guidelines of Overburden Casting

    Since the ecrly 1970's several factcrs have changed. In the East the larger tracts of coal mined with large eauipment are being dePleted, The cost of moving the larger equipment from small tract to s

    Jan 1, 1989

  • NIOSH
    OFR-79-83 Remote Monitoring Of A Coal Waste Impoundment In West Virginia

    By Gordon E. Green

    This report addresses remote monitoring of coal waste impoundments for stability. Existing automated geotechnical monitoring systems are described and reviewed along with details of instruments suitab

    Jan 1, 1982

  • SAIMM
    Mineralogical Solutions For Pyrometallurgical Problems

    By L. Andrews

    Keywords: mineralogy, phase-chemical, chemical-looping combustion, XRD, SEM, EDS, QEMSCAN, PGM, slag, matte, ilmenite Mineralogy, traditionally associated with concentrator studies, is being incre

    Jan 1, 2011

  • SME
    Virtual Reality Animation Of The Proposed El Dorado Mine In El Salvador Assists Regulators In Reviewing An EIA

    By Troy Holm, Matthew L. Fuller, Frederick H. Earnest

    Virtual Reality Animation Of The Proposed El Dorado Mine In El Salvador Assists Regulators In Reviewing An EIA

    Jan 1, 2005

  • SME
    Technical Note - Use of a microcomputer in the design and selection of materials hoisting systems

    By J. D. Patsey, G. T. Lineberry

    Introduction A computer program was developed for analyzing drum-type hoists before modifying an existing system or designing a new one. Its use permits the preliminary evaluation of a system before

    Jan 2, 1987

  • SME
    bauma Exhibitors Display Their Products to Largest Crowd Ever

    The title of “the world’s biggest volume-produced hydraulic breaker,” that was held for more than a decade by the Atlas HB 7,000, changed hands with the launch of Atlas Copco’s HB 10,000 at bauma 2007

    Jan 1, 2007

  • CIM
    Implementing Best Practices of Metal Accounting at the Strathcona Mill

    By Donald Leroux, Asim Tuzun, Simon Gariépy, Luc Lachance, Hayley Halsall-Whitney

    "The importance of coherent material balance results has long been recognized by mining and metallurgical companies. Although this is still true nowadays, various stakeholders are increasingly concern

    Jan 1, 2012

  • SME
    Analysis of Fall-Related Imminent Danger Orders in the Metal/Nonmetal Mining Sector Mining, Metallurgy and Exploration

    By Mahiyar Nasarwanji, Jonathan K. Hrica, Jonisha P. Pollard, Lydia M. Kocher, Brianna M. Eiter

    Within the metal/nonmetal mining sector, fall-related incidents account for a large proportion of fatal and non-fatal injuries. However, the events and contributing factors leading up to these inciden

  • NIOSH
    RI 2757 Extinction of Methane Flames by Helium

    By H. F. Coward, G. W. Jones

    "IntroductionIn the course of an investigation on the influence of black damp (a mix of nitrogen and carbon dioxide) on the limits of inflammability of fire damp (methane) in air, some new information

    Jun 1, 1926

  • CIM
    Aur Resources Inc. - Louvicourt Mine

    By Michel Rodrigue, Sylvain Duchesne, Louis Racine

    "LocationThe Louvicourt mine is located 20 km east of Val d'Or in Abitibi, in the northwest part of the province of Quebec. The mine is located on Highway 117 connecting Val d'Or to Montreal and very

    Jan 1, 2000

  • DFI
    Bored Piles With Base Preloading By Grouting - The Polish Experience

    By Bolestaw A. Ktosihski

    Preloading of bored pile bases by grouting is an effective way of reducing foundation costs. The bearing performance of a pile may be considerably improved. Various techniques and devices are used. Pr

    Jan 1, 2006

  • AUSIMM
    Carbon Management in a High Gold Price Environment

    By J K. Claflin, S R. La Brooy

    A case study from a current Ausenco project is presented to demonstrate the importance of maintaining high carbon activity to illustrate the driving force for plant improvements such as a carbon regen

    Jul 15, 2013

  • SAIMM
    Optimization of shuttle car utilization atan underground coal mine

    By P. R. Segopolo

    "The purpose of the project is to convert current shuttle car utilization on an underground coal mine to best practice by focusing on change-out points and tramming routes, which have a major influenc

    Jan 1, 2015

  • AUSIMM
    Verified Stability Modelling of Highwalls

    By D Fergusson, J D. St George

    Highwall stability is a major consideration in optimising opencast mine geometry. It involves assessing the risk of those slope failures that are large enough to have significant cost, safety and/or o

    Jan 1, 2006

  • AUSIMM
    Hismelt« - Direct Ironmaking Becomes a Reality

    Following extensive trials on a 100 000 tpa Research and Development facility at Kwinana, Western Australia, Hismelt Corporation (wholly owned by Rio Tinto) are confident of the future commercial su

    Jan 1, 1999

  • CIM
    Dynamic Modeling and Virtual Prototype Simulation of the GAP-Oil Sands Interactions

    By Samuel Frimpong

    The interaction of oil sands with a ground articulating pipeline (GAP) system has been simulated with the dynamic model established in this work by combining the multi-body and soil dynamics with the

    May 1, 2004

  • SME
    Enabling Mining Safety & Automation By Electronically Scanning Microwave Radar Systems On Surface Mining Machines

    Using a series-model of an automotive short range radar sensor (SRR) and a recently completed experimental radar system, field tests have been performed in a surface mine. It was examined, to what ext

    Jan 1, 2007

  • DFI
    Design Of Axially Loaded Compression Piles According To Eurocode 7

    By Bauduin C. Besix

    The Eurocode 7 "Geotechnical Design" is based on "Limit State Design", tackling the uncertainties as much as possible at their source through: - selection of characteristic values of variables (load

    Jan 1, 2002

  • TMS
    High Performance Recycling of Agricultural Wastes: Rice Husk Silica Used as Reinforcements of Magnesium Sintered Materials

    By Katsuyoshi Kondoh

    The utilization of silica particles originated in rice husks as reinforcements of magnesium composites was discussed. By using the solid state reaction of rice husk silica particles with magnesium pow

    Jan 1, 2009