    Using pyrometers and thermal camera for estimation the ventilation conditions

    By T. Struminski

    The paper is aimed to assess the possibilities of usage of pyrometers and thermal cameras to study ventilation and environmental conditions in underground mines. Surface and underground thermovisi

    Jan 1, 2003

  • SME
    NATM Strategies In The U.S.?Lessons Learned From The Initial Support Design For The Caldecott 4th Bore

    By Bhaskar B. Thapa

    The design of the Caldecott 4th Bore, located along State Route 24 in Oakland, California, is based on the principles of the New Austrian Tunneling Method (NATM). Typical NATM initial support design p

  • SME-ICGCM
    New Era in Longwall Top Coal Caving Geomechanics

    By Abouzar Vakili

    Longwall Top Coal Caving (LTCC), as the most attractive method for thick coal seams, has been suffering from insufficient geomechanical understanding for the past few years. Cavability without doubt

    Jan 1, 2007

  • CIM
    An Economical Vertical Transport System to Hoist 3 Mt of Ore per Annum from 1640 m

    By Wendy L. Naysmith

    This paper deals with the various options considered and factors that influenced the final selection of the headframe, shaft layout and hoisting systems required at the Impala No 16 Shaft in order to

    Oct 1, 2010

  • SAIMM
    Use Of Chemical Energy In Submerged Arc Furnace To Produce Ferrochrome: Prospects And Limitations

    By Chandrakala Kari, S. Mohan Rao, Gajanan Kapure, K. S. Raju

    High carbon ferrochrome production process is energy intensive, consumes approximately 3300-3400 kWh per ton of metal produced. This amounts to ~ 34% of the total ferrochrome production cost. The powe

    Jan 1, 2007

  • NIOSH
    Pillar Stability Issues Based On A Survey Of Pillar Performance In Underground Limestone Mines

    By Dennis R. Dolinar, John L. Ellenberger, Gabriel S. Esterhuizen, Anthony T. Iannacchione

    A survey of pillar conditions was carried out at 21 operating limestone mines that use the room-and-pillar method. The surveyed pillars were all located in rock that was classified as “Good” to “Very

  • SME
    Application Of Background Oriented Schlieren (BOS) For The Qualitative Analysis Of Flow Through A Regulator

    The schlieren technique describes an optical analysis method designed to enhance light distortions caused by air movement. The ability to visualize air flow has significant implications for analyzing

    Jan 1, 2011

  • SME
    The Dulles Corridor Metrorail Project—Extension to Dulles International Airport and Its Tunneling Aspects

    By V. Gall, J. Rudolf

    The Virginia Department of Rail and Public Transportation and the Metropolitan Washington Airports Authority are undertaking the extension of Washington Metropolitan Area Transit Authority’s Metrorail

    Jan 1, 2007

  • DFI
    Tied-Back Micropile Walls In Landslide Repair

    By Kevin W. Cargill

    In September 2004, Hurricanes Frances and Ivan caused the Pigeon River in western North Carolina to flood. This flooding eroded the embankment below Interstate 40 (I-40) and sent one of the eastbound

    Jan 1, 2006

  • SME
    Factors Influencing Use Of Mineral Admixtures For The Past Decade In The Western US - Preprint 09-081

    By G. Hoffman

    Sustainable development has brought social, environmental and energy efficiency concerns together with management and governance of natural resources. Cement manufacturing, an energy- and natural reso

    Jan 1, 2009

  • TMS
    Atomisation As A One Step Process For Hydrometallurgical And Flash Furnace Feed

    By David Norval

    Ni, Co, Cu and Pt, mattes are common materials that require granulating and milling of the resultant granules for further processing. This route is acceptable if the material is brittle (friable) whi

    Jan 1, 2006

  • TMS
    Productivity Increase In A Peirce-Smith Converter Using The Cop Kin And OPC System

    By Thomas Prietl

    The use of gas stirring systems through the furnace bottom is common for anode and holding furnaces in the copper industry The first implementation of a gas stirring COP KIN® system in a Peirce-Smith

    Jan 1, 2005

  • ISEE
    Optimization of Blast Fragmentation at Kisladag Gold Mine

    By Erkan Bayrak, Serkan Erkara, Ozkan Duzgun, Ekin Gungor

    This paper presents part of the outcomes of the drill and blast optimization project carried out at Kisladag Gold Mine in Turkey. Kisladag Gold Mine is the largest gold mine in Turkey with a low-grade

    Jan 1, 2015

  • ISEE
    Case History: Controlled Demolition of a Reinforced Concrete Structure in San Sepolcro, Italy

    By Roberto Folchi

    This note deals about the controlled demolition work for the dismantling of an industrial structure in San Seplocro, Italy. The structure to be demolished, the FLOWERS SILOS, consisted in a multilevel

    Jan 1, 1994

  • DFI
    Pittsburgh Steelers Stadium - Deep Foundations Case Study

    By Larry Rayburn

    In the spring of 1999, construction commenced on the new Steelers Football Stadium in downtown Pittsburgh, Pennsylvania. Richard Goettle, Inc. (RGI) was the successful bidder to install the specified

    Jan 1, 2001

  • SME
    Finite Element Assessment Of The Influence Of Caving On Barrier Pillar Loads In Deep Coal Mines - Introduction - Preprint 09-065

    By W. G. Pariseau

    Conventional barrier pillars in underground coal mines are intended to protect mains and sub-main entries for relatively long periods of time. Inter-panel barrier pillars that may be used in especia

    Jan 1, 2009

  • TMS
    Modeling Of Viscosities Of Imperial Smelting Furnace And Lead Blast Furnace Slags

    By Pengfu Tan

    A program ?SlagVis? has been developed to simulate the liquidus temperature, phase compositions and viscosities of ZnO-CaO-SiO2-Al2O3-?FeO? slag, such as Imperial Smelting Furnace (ISF) slag and lead

    Jan 1, 2005

  • AUSIMM
    Real-time slurry elemental analyser for iron ore beneficiation plant control

    By E Portes, G Noble, J Roberto, A Stabile

    Iron ore beneficiation plants are facing economic pressures to treat more challenging ore types, improve efficiency and improve product quality. Better control and stability of the plant process in th

    Jul 24, 2017

  • SME
    Designing the Alaskan Way Tunnel to Withstand a 2,500-Year Earthquake

    By Gordon T. Clark, James R. Struthers, Celal Kirandag

    INTRODUCTION Project Background The Washington State Department of Transportation (WSDOT) hired the Seattle office of Parsons Brinckerhoff to lead a team of consultants to produce an Environ-men

    Jan 1, 2007

  • NIOSH
    RI 2300 Underground Loading Devices in Metal-Mines

    By C. Lorimer Colburn

    "The diverting of men from industry to combat in the world's war focused the attention of the operators in this country upon mechanical means of doing things. The demand for man-power -was so insisten