Search Documents

  • IIMP
    Como optimizar los métodos tradicionales de estimación de reservas con el análisis variográfico geoestadístico

    By Samuel Canchaya

    Los paquetes medianos y grandes de software a minería contienen en sus módulos de estimación de reservas alguna forma de análisis variográfico geoestadístico. En esa perspectiva, el presente trabajo s

    May 25, 1998

  • DFI
    Optimal Subsurface Investigation Approach for Overhead Transmission Structures

    By Haijian Shi, Drew Pizzo

    This article focuses on the appropriate application of subsurface investigation methods for transmission structures, which are typically designed to resist lateral rather than vertical loads. Currentl

    Jan 1, 2018

  • DFI
    Recent Developments In Continuous Flight Auger Piling

    By P. H. Derbyshire

    The use of continuous flight auger piles has increased significantly in the U.K. to such an extent that it is now the most widely used method of constructing small diameter bored piles. This paper des

    Jan 1, 1989

  • AUSIMM
    Submarine Hydrothermal Venting and Mineralisation Associated with Kermadec Arc

    The ~2500 km long Kermadec-Tonga arc northeast ofNew Zealand is the longest continuous intraoceanic arc in the world. At least 94 volcanic centres along the arc are submarine, most (87 per cent) withi

    Jan 1, 2005

  • CIM
    Comparative Study on Flotation Performance of Stockpiled and Fresh Ore Samples

    By C. Pelley, S. Kelebek, T. Katsabanis, B. Nanthakumar

    "As part of a larger investigation on generation of fines from mining activities and their effect on downstream operations, ore samples from Onaping area stockpiles of Falconbridge Ltd were studied. B

    Jan 1, 2006

  • SAIMM
    Insights Into The Influences Of Paste Additions And Levels On Söderberg Electrode Management

    By F. X. Prins, L. R. Nelson

    Tight control of electrode paste additions, hard and soft paste levels, baked zone position and electrode temperatures are integral to superior Söderberg electrode management practices. Paste addition

    Jan 1, 2004

  • NIOSH
    IC 6558 The Importance of Discipline in Mine Safety

    By D. Harrington

    We Americans fondly believe that ours is the greatest , most progressive and most civilized country in the world , but the cold statistical facts reveal that we apparently have little appreciation for

    Mar 1, 1932

  • SME
    Building Human Resources Through Systematically Designed Instruction

    By R. E. Mclvor

    This is an update of an original dissertation on this topic by Lavallee, McIvor and Stolovitch (1992). A step-by-step, technical procedure used to measure and improve the performance of plant grinding

    Jan 1, 2008

  • DFI
    Settlement Of Tall Buildings Supported On Deep Foundations In Southeast Florida, USA

    By Rudolph P. Frizzi

    This paper presents different deep foundation systems and associated settlement records for high-rise building projects in the coastal areas of southeastern Florida. An introduction to the sedimentary

    Jan 1, 2003

  • SME
    El Abra - Two Years Later

    By Rainer Kahrger

    This paper is a follow-up to the paper presented at the SME meeting in April of 1996. Since then, the El Abra facility has been started up, 9 months ahead of schedule, and has processed about 45 milli

    Jan 1, 1998

  • NIOSH
    Empirical Design of Span Openings in Weak Rock based upon Support Type Employed

    By A. M. Ouchi

    Existing empirical design tools have been developed from fair-to-good quality rock masses (RMR76 >50). This paper presents a focus of ground control research presently being conducted by the Roc

    Jan 1, 2008

  • SME
    Thermal Exposure Limit in a Simulated Refuge Alternative

    By C. D. Ashley, X. P. Garzon-Villalba, R. M. Lopez, T. E. Bernard

    Federal standards for refuge alternatives (RAs) mandate that they not exceed a Steadman apparent temperature (AT) of 95 °F (35 °C) at an assumedmetabolic rate of 325W, a limit that appears to be arbit

    Nov 8, 2019

  • AUSIMM
    Rock-Drill Developments

    THE following notes, compiled in the first instance for the makers of rock-drIlls, were read by Mr. Hanton at a meeting of the Broken Hill Branch on 12th Septelnber, 1922. It was decided that all Brok

    Jan 1, 1923

  • SME
    The Occurrence and Concentration of Rare Earth Elements in Acid Mine Drainage and Treatment By-products: Part 1—Initial Survey of the Northern Appalachian Coal Basin Mining, Metallurgy and Exploration

    By Paul F. Ziemkiewicz, Aaron Noble, Christopher R. Vass

    The conventional rare earth element (REE) industry has historically sought to develop ore deposits where geologic processes have produced mineralized zones with commercially attractive REE concentrati

  • SME
    The Occurrence and Concentration of Rare Earth Elements in Acid Mine Drainage and Treatment By-products: Part 1—Initial Survey of the Northern Appalachian Coal Basin Mining, Metallurgy and Exploration (4e302343-6c3c-4087-9974-a71041343ce5)

    By Paul F. Ziemkiewicz, Aaron Noble, Christopher R. Vass

    The conventional rare earth element (REE) industry has historically sought to develop ore deposits where geologic processes have produced mineralized zones with commercially attractive REE concentrati

  • AUSIMM
    Enhanced Drilling in Rio Tinto

    Rio Tinto has embarked on a journey to use automation to improve the performance of its surface mines. The driver for automation is to improve the accuracy and consistency of mining processes and less

    May 1, 2010

  • SAIMM
    New Opportunities - Exhaustive Monitored Copper Coolers For Submerged Arc Furnaces

    By M. Hopf, E. Rossouw

    Keywords: Pyrometallurgy, furnace, copper coolers, freeze lining, monitoring, Saveway The use of water-cooled copper components as sidewall elements of submerged arc furnaces and other pyrometallu

    Jan 1, 2006

  • AUSIMM
    Drill Steel Sharpening Practice at Lake View and Star Gold Mine

    The drill steel' sharpening shop, which stands adjacent to the Chaffers shaft, is built to the dimensions of 110 ft. 9 in. by 58 ft. wide, and is air conditioned in order to maintain reasonable w

    Jan 1, 1941

  • AUSIMM
    Calibrated Geotechnical Measurement to Provide a Quantitative Understanding of Rock Mass Conditions at the Tasmania Gold Mine, Beaconsfield, Tasmania

    Judicious placement of a range of geotechnical instruments was employed at the Tasmania gold mine, Beaconsfield, Tasmania, as a key strategy in the monitoring of rock mass conditions over the past fou

    Nov 25, 2010

  • CIM
    Towards Optimum Value in Underground Mine Scheduling

    By Bryan M. Maybee

    The scheduling of underground mining activities is a complex task, in particular because of the requirement to satisfy a large number of constraints. A Schedule Optimization Tool (SOT) for underground

    May 1, 2009