Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    The Application Of Rock Mass Classification Principles To Coal Mine Design In UK Conditions

    By David J. Reddish

    Longwall systems are inflexible in layout, intolerant of disruption and represent a substantial investment. It is therefore essential drat all understanding of the likely strata behaviour and support

    Jan 1, 2000

  • SME-ICGCM
    Pumpable Roof Supports: Developing Design Criteria by Measurement of the Ground Reaction Curve (8ba91e71-c09d-4bd5-afc0-848b526c152b)

    By Thomas Barczak

    Pumpable roof supports provide an alternative longwall tailgate roof support and have grown in usage during the past few years. Heintzmann Corporation has been installing pumpable roof supports at the

    Jan 1, 2003

  • SME-ICGCM
    Geotechnical Planning and Development of the BHP Minerals San Juan Pilot Mine, Waterflow, NM

    By P. E. Christensen

    Due to ever-increasing stripping ratios associated with the No. 8 Seam at the San Juan Mine surface operation, BHP Minerals decided to implement longwall mining for the extraction of the substantial f

    Jan 1, 1998

  • SME-ICGCM
    Modern Geotechnical Exploration And Mine Design

    By Patrick S. Artrip

    A deep mining operation in the Lower Kelly (Imboden) seam in Wise County, Virginia experienced severe ground control conditions in its attempt to develop reserves situated under increasingly higher co

    Jan 1, 1993

  • SME-ICGCM
    Prediction Of Rock Cutting Performance Using Fracture Mechanics Principles - A Review (0b1a12ed-9606-4d46-b68d-eea006d52e76)

    By Gexin Sun

    This paper overviews the recent research progress in predicting cutting performance using fracture mechanics principles. It is emphasised that rock fragmentation due to cutting is mainly a process of

    Jan 1, 1992

  • SME-ICGCM
    Analysis Of Longwell Shields And Their Interaction With Surrounding Strata In A Deep Coal Mine

    By Duk-Won Park

    A vast majority of the operating longwall sections use shield-type face supports to provide ground control in the United States. As a co-operative research program between the University of Alabama (U

    Jan 1, 1992

  • SME-ICGCM
    Salt Pillar Design Equation

    By Leo L. Van Sambeek

    Specification of properly sized pillars to support the overburden is one of the most challenging aspects of salt mine design. Interest in salt pillar design is heightened by the recent flooding of th

    Jan 1, 1997

  • SME-ICGCM
    Formation of Face Headings Using Stress Relief at Asfordby Mine

    By John Cassie

    The condition of roadways in the Deep Main seam at Asfordby mine, operated by RJB Mining (UK) Ltd, is strongly dependant on drivage direction relative to the maximum horizontal stress. The mine is la

    Jan 1, 1997

  • SME-ICGCM
    Elasto-Plastic Finite Element Structural Stability Analysis Of Room And Pillar Mine Workings (1726bb0c-5e63-4f04-a636-538432c37ec9)

    By S. Bensehamdi

    An advanced elasto-plastic finite element model adopting a modified Von Mises yielding criterion was used to simulate progressive failure of the rock strata surrounding a room and pillar mine structur

    Jan 1, 1992

  • SME-ICGCM
    Analysis of Geologic and Geotechnical Conditions and Their Effects on Longwall Mining to Optimize Mine Planning at Shoal Creek Mine

    By Yong-Ming Jiang

    In cooperation with Cyprus Twentymile Coal Co., researchers from the National Institute for Occupational Safety and Health (NIOSI-I), Spokane Research Laboratory, conducted a study at the Foidel Creek

    Jan 1, 1998

  • SME-ICGCM
    Massive Pillar Failure--Two Case Studies

    By David H. Tang

    Similar massive pillar failures were observed in two underground coal mines with different configurations of mine workings and overburden depths. Finite element models were used to analyze the causes

    Jan 1, 1984

  • SME-ICGCM
    Simplified Pre-and Post-Processing Technique for Performing Finite-element Analyses of Deep Underground Mines (4c70a887-9438-4254-8d3e-3283730c59e0)

    By Marc T. Filigenzi

    Two of the major ground control safety issues confronting underground mine operations today are shaft pillar stability and the failure of rock around active mine openings. Failure of a mine shaft can

    Jan 1, 1997

  • SME-ICGCM
    Tekflex As A Sprayon Screen Replacement In An Underground Hard Rock Mine

    By Chris Pritchard

    Falconbridge Ltd., a major base metal producer in the Sudbury Basin of Ontario, Canada, identified a need to find a safe and cost effective replacement for welded-wire mesh used to support loose groun

    Jan 1, 1999

  • SME-ICGCM
    Innovative Rock Reinforcement Hardware (a5497235-47bd-4c2e-8654-b4e79927169e)

    By D. F. Howarth

    Two innovative ground reinforcement products have been developed for use in the mining industry. One of these products is a high strength polyethylene (HOPE) bar for use as a rib bolt in underground c

    Jan 1, 1992

  • SME-ICGCM
    Cable Supports For Improved Longwall Gateroad Stability

    By Stephen C. Tadolini

    Cable supports offer several advantages over traditional secondary support methods. Cable supports enhance stress redistribution to pillars and gob areas, minimize or eliminate timbers and cribs which

    Jan 1, 1993

  • SME-ICGCM
    Transversely Elasto-Plastic Analysis of Surface Subsidence Arising from Longwall Mining of Inclined Coal Seams

    By M. Afsari Nejad

    A Transversely Elasto-Plastic Model was configured in FLAC (Fact Lagrangian Analysis of Continua) as a more realistic simulation of stratified and inclined strata behaviour examining surface subsidenc

    Jan 1, 1998

  • SME-ICGCM
    Roof Monitoring In Limestone Mines-Experience With The Roof Monitoring Safety System (RMSS)

    By Thomas E. Marshall

    During the past few years, the Pittsburgh Research Laboratory of the National Institute for Occupational Safety and Health (NIOSH) examined and characterized conditions at a majority of the undergroun

    Jan 1, 2000

  • SME-ICGCM
    An Application Of Tree Classification Method In Analysis Of Longwall Shield Stability

    By Yong-Ming Jiang

    Longwall mining systems are extremely complex and expensive and require great caution for reliable and efficient operation. In many cases, ground control problems are the primary concern in longwall m

    Jan 1, 1993

  • SME-ICGCM
    Rock Mechanics Study Of Lateral Destressing For The Advance-And-Relieve Mining Method (2bf3b56c-1393-4658-a2e4-6e9ace0d24dd)

    By Hamid Maleki

    The advance-and-relieve method benefits from lateral destressing associated with mining in laminated rocks and a high horizontal stress regime. This stress control method is based on measurements show

    Jan 1, 2003

  • SME-ICGCM
    Geotechnical Planning Basis for the Optimization of Workings

    By Nikolaos Polysos

    Besides considering the given geomechanical conditions, the geological/geotechnical logging of drill cores and heading faces during the driving of parallel entries and the resulting rock classificatio

    Jan 1, 2003