Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Importance and sensitivity of variables defining the performance of pre-split blasting using artificial neural networksBy AK Raina
Blasting is used in mining and civil excavations to break the rockmass for ore production or creation of space. One of the disadvantages of the method is that it causes breakage beyond the proposed ex
-
Structural Variation And Mining Methods At Quintette Coal Limited's Mesa, Wolverine, And Shikano PitsBy K. Sharman
Quintette Coal Limited (managed and 50% owned by Denison Mines Limited) operates an open pit coal mine located in northeastern British Columbia, in the foothills of the Rocky Mountains. (See Fig. l).
Jan 1, 1991
-
3. Planning of Underground Materials-Handling Systems ? IntroductionBy L. H. E. Weyher
A mine is essentially a vast materials-handling system. All other systems found in the mine exist to one degree or another to support the materials-handling functions, from the cutting at the face to
Jan 1, 1979
-
Control System For Long Distance Slurry PipelinesBy Jay P. Chapman
The basic control requirement for multi-pump, long distance slurry pipelines are discussed and a particular example of an operating slurry pipeline using programmable controllers is presented.
Jan 1, 1983
-
An Economic Rationalization Of Coal Preparation Methods And EquipmentBy Gerry Norton
The purpose of this paper is to make the most complete assessment of coal cleaning methods, both process and equipment related to modern-day production and environmental requirements. In order to ac
Jan 1, 1977
-
Press Technology Taking Hold in Global Mining IndustryBy William Gleason
During the past five years, mining operations have had access to press technology for piping and joint fittings that can save owners a significant amount of time when installing or replacing pipes by
-
Subsidence Monitoring Plan Of Longwall Panels - A Case Study Kitt Mine No. 1By James E. Kolesar
An essential prerequisite to expanding the application of longwall mining techniques in the United States is the development of a better understanding of the mechanics of rock mass deformation near th
Jan 1, 1982
-
Conneaut Coal Terminal ExpansionBy Paul Soros
The Conneaut, Ohio, terminal of the Bessemer & Lake Erie Railroad was the first rail-to-ground-to-water coal terminal on the Great Lakes. Compared to the traditional method of holding coal in railroad
Jan 1, 1969
-
Trends In Peat Management And Utilization In The Upper Great Lakes RegionBy Dennis Asmussen
The peatlands of the U.S. and Canadian parts of the Upper Great Lakes region have a long history of modest utilization in agriculture, forestry, horticulture, and as natural undisturbed areas. Only re
Jan 1, 1980
-
Maintenance Manpower Audit And DevelopmentBy Myles E. Altimus
One responsibility of a manager is to improve his human organization. Some executives believe a manager should be measured and compensated accordingly on the basis of his ability to improve the qualit
Jan 1, 1966
-
Predicting The Moisture Content Of Coals Dewatered By ScreensBy B. J. Arnold
Utility coal specifications usually contain a requirement for a maximum moisture content in order to prevent coal handling problems and to minimize evaporative losses in the boiler. As most coal clean
Jan 1, 1997
-
Flotation Chemistry of the Inco Matte Separation Process (89790c89-08ab-4e74-a924-1bf1d9a80319)By J de Cuyper, N. R. Tipman, G. E. Agar, L. Laré, W. Freyberger
The flotation chemistry of the commercial INCO matte separation process was investigated. The slow cooling of Bessemer converter matte forms discrete phases of Cu2S and Ni3S2 and a Cu-Ni alloy. After
Jan 1, 1976
-
Recent Developments And Applciation Of The Tower Mill Tower MillBy R. Fred Pena
The Tower Mill has proven to be a grinding machine with a demonstrated application flexibility. Variations in applications have proven to be numerous. This mill was originally intended for fine grindi
Jan 1, 1986
-
A Study On Pulsating High Gradient Magnetic SeparationBy L. Shuyi
In order to develop the pulsating high gradient magnetic separation technology, a type of laboratory pulsating high gradient magnetic separator (PHGMS) has been manufactured. Experiments of its separa
Jan 1, 1990
-
Split-Online® Digital Image Analysis System To Quantify Particle Size For The Industrial Mineral IndustryBy J. Kemeny, B. Norton, T. W. BoBo
Digital image analysis systems to quantify particle size of crushed materials have successfully been applied in large-scale mining operations throughout the world. Particle size measurement at various
Jan 1, 2004
-
Determining the optimum number of entries for longwall development panels in deep, gassy minesBy R. E. Ray
As coal reserves at shallow depths continue to be exhausted, a number of US coal companies are developing seams previously considered too deep to mine economically. Because of increased cover load, mi
Jan 1, 1988
-
Design-Build Project Delivery Method Selection and Implementation of a GBR-B and GBR-C for the Pawtucket Tunnel - RETC2023By Robin Dill, Julian Prada, Kathryn Kelly, Brian Hann, Todd Moline
Narragansett Bay Commission’s (NBC) Pawtucket Tunnel Project includes construction of the 11,600-ft long, 30-ft ID, deep rock tunnel. This paper presents insight into the features and benefits of lump
Jun 13, 2023
-
The Place Of The Jigs In Modern Coal Preparation ? An Operator's ViewpointBy Michael P. Evans
Traditionally in coal processing jigs have been used to clean the coarse coal fraction, the +3/8" or +1/4" material. Today with the advent of modern fine coal jigs in the United States, its place was
Jan 1, 1983
-
Environmental Mediation: Resolution Of A Site-Specific Dispute With Area-Wide Policy ImplicationsBy Verne Huser
The intensity of environmental conflict, the delays and legal battles that have marked the 1970's suggest the need for additional processes to resolve environmental disputes. Our present means fr
Jan 1, 1979
-
Tarp North Branch Tunnel Leg – A Case HistoryBy Joseph P. Sobanski, Michael P. Bruen
The North Branch tunnel segment of the Tunnel and Reservoir Plan Mainstream System consists of 14,075 m (45,885 ft) of 9.2 m (30.2 ft) finished diameter and985 m (3,232 ft) of 2.5 m (8.25 ft) finished
Jan 1, 1999