Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Promising Options for Solving the Dolomite Problem of the Florida Phosphate Resources—a Brief Review Mining, Metallurgy and Exploration

    By Dapeng Zhang, Brij Moudgil, Shibo Zheng, Chunhui Feng, Wenyi Song, Wending Xiao, Patrick Zhang

    Separation of dolomite from phosphate is the most challenging problem in phosphate mineral processing. Over 50% of the future phosphate reserve in Florida contains too much dolomite to process using t

  • SME
    Equipment adds efficiency, safety to cross passage work

    From a vast army of workers to gargantuan machines to immense volumes of material being moved, almost everything about the Port of Miami Tunnel (POMT) project points to tunneling on a massive scale. A

    Sep 1, 2013

  • SME
    Analysis Of Us Small-Mine Compliance Feasibility With Proposed New Respirable Dust Standards And Implications For Better Dust Control Methods

    By R. L. Grayson

    In 2010, MSHA began holding hearings on a new coal mine respirable dust rule, which proposes a 1.0 mg/m3 standard, a separate 0.1 mg/m3 quartz standard, and the use of single-shift samples for complia

    Jan 1, 2012

  • SME
    Reclamation Work Reclaims Gold Tailings in the Black Hills of South Dakota

    By Fred D. Fox

    Introduction Abandoned mill tailings deposits can be found throughout the northern Black Hills of South Dakota, indicative of mining activities that originated during the great gold rush days of 1875

    Jan 11, 1984

  • SME
    Steel Fiber Microsilica Shotcrete With Remote Controlled Equipment

    By Galyn Rippentropp, Finn Erik Overlie

    INTRODUCTION The wet shotcreting system utilizing steelfiber microsilica shotcrete with remote controlled equipment (The Robocon System) was developed in Norway 7-8 years ago. Norway was the natura

    Jan 1, 1987

  • SME
    Technology News – Atlas Copco Wagner Announces Improved 10-t LHD

    Atlas Copco Wagner launched its ST1010 Scooptram load haul dumper. The ST1010 replaces the company’s Wagner ST-1000 Scooptram. The improvements to the Wagner ST1010 include increased reliability, ea

    Jan 1, 2000

  • SME
    Impacts Of Spoil Conditions On Reforestation Of Surface Mined Land (b2bd3f1e-5fbd-441d-ae83-ec597c5ff463)

    By M. H. Pelkki, R. J. Sweigard, P. W. Conrad, J. M. Ringe, D. H. Graves

    Research has shown that excessive soil compaction is detrimental to the establishment of trees in reclaimed soils. Dry bulk density and penetration resistance are two soil parameters that can be used

    Jan 1, 2001

  • SME
    Optimization of Tellurium and Antimony Extraction from Residue Generated in Alkaline Sulfide Leaching of Tellurium-Bearing Alkaline Skimming Slag Using Central Composite Design Mining, Metallurgy and Exploration (e0c562d4-30bd-4458-b8cb-8e6a1cd409aa)

    By Qinghua Tian, Zhipeng Xu, Dong Li, Xueyi Guo, Liu Zhu

    A possible process for extracting tellurium and antimony from a residue generated in alkaline sulfide leaching of telluriumbearing alkaline skimming slag was proposed. The central composite design was

  • SME
    Design And Construction Service Tunnels On Palm Jumeirah Island

    By Ben Hayes, Michael Ryjevski

    The Palm Jumeirah is the smallest of the three Palm Islands (Palm Jumeirah, Palm Jebel Ali and Palm Deira). It is located on the Jumeirah coastal area of the emirate of Dubai, in the United Arab Emira

    Jan 1, 2007

  • SME
    Study on the effects of scrubber operation on the face ventilation

    For the past four years, the Department of Mining Engineering at the University of Kentucky has conducted a validation study of the CFD Fluent code, by comparing its results against mining-related ben

    Jan 1, 2009

  • SME
    New Test Methodology For Estimating The Abrasiveness Of Soils For TBM Tunneling

    By F. Dahl, P. Raleigh, J. Holzhauser, B. Nilsen

    Tunnel excavation using tunnel boring machines (TBMs), has become increasingly common in recent years, despite the fact that precise evaluation of certain risks have not kept pace with the use of thes

    Jan 1, 2007

  • SME
    Guidance for Partial Face Excavation Machines

    By Jochen Belz, Allan Henneker, Nod Clarke-Hackston

    For the construction of tunnels and other underground structures, extraction of the exact amount of material is of paramount importance both economically and for engineering purposes. In the Sequentia

    Jan 1, 2007

  • SME
    Silicosis : An Ancient Malady in a Modern Setting

    By R. C. Burtan

    Long before recorded history, man began to dig into the earth's crust in a never ending search for useful materials. It is well known that more than half of the earth's crust is composed of

    Jan 7, 1984

  • SME
    Selective Flocculation Of Fine Phosphate Materials (8c939b54-ad68-4cf0-a2e6-037610cedf74)

    By H. Sis, D. Dahlin, S. Chander, C. Summers

    Bench-scale selective-flocculation tests were conducted on samples of Florida and Western phosphate process tailings. Physical, mineralogical, and surface characteristics were determined for both typ

    Jan 1, 2002

  • SME
    Employment opportunities in the coal industry

    By T. R. Jr. McMillan

    Introduction Examining the short- and long-term job prospects for engineers in the coal industry might include looking at coal tonnage projections, future export markets, federal regulations, and the

    Jan 2, 1985

  • SME
    Exploratory Shaft Design For The Salt Repository Project

    By S. A. G. Poppen, M. B. Mirza, A. I. Cooley

    The U.S. Department of Energy (DOE) is responsible for siting and constructing a licensed geologic repository for commercially generated high-level nuclear waste. Within DOE, the Office of Civilian Ra

    Jan 1, 1987

  • SME
    The role of gas monitoring in the prevention and treatment of mine fires

    Queensland?s underground coal industry, as a whole, has arguably the best gas monitoring systems in the world. Each mine utilizes real time, tube bundle and onsite ultra fast gas chromatograph systems

    Jan 1, 2009

  • SME
    Piercing The Mountain And Overcoming Difficult Ground And Water Conditions With Two Hybrid Hard Rock TBMS

    By Brian Fulcher, Michael Bell, Shimi Tzobery, Werner Burger, John Bednarski

    The Arrowhead Tunnels Project represents the final portion of a 70 km (44-mile) long water conveyance facility that will bring up to 28 m3/sec (1,000 ft3/sec) of water into Southern California. The 13

    Jan 1, 2007

  • SME
    Rare elements in seafloor massive sulfides of the Semyenov hydrothermal cluster, Mid-Atlantic Ridge

    By Georgy Cherkashov, Svetlana Babaeva, Tamara Stepanova, Firstova. Anna

    Seafloor massive sulfides (SMS) study in the Russian Exploration Area at the northern equatorial Mid Atlantic Ridge began after signing the contract with International Seabed Authority in 2012. In ord

    Sep 1, 2014

  • SME
    Design, Construction And Start-Up Of The Ilo Smelter Modernization Project

    By H. Walqui, C. Noriega

    Southern Copper Corporation (SCC) is one of the world’s largest copper companies and is finishing the modernization of the Ilo copper smelter. A single ISASMELTTM furnace will start smelting 1,200,000

    Jan 1, 2007