Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
- 
                     Continuous Blasting Improvements At Landau Colliery ? Synopsis Continuous Blasting Improvements At Landau Colliery ? SynopsisBy M. Rakoma Following the blasting fatality on 17 December 2009, Landau Colliery was forced to change from the blasting practices that had been utilized since the start-up of the mine. Since then, attempts have b Jan 1, 2013 
- 
                     Geotechnical Investigation Of Decline Shaft Portals (98716578-d9a6-4b5f-b3d0-51b497360883) Geotechnical Investigation Of Decline Shaft Portals (98716578-d9a6-4b5f-b3d0-51b497360883)By R. A. Puchner The location of a decline shaft portal can have far reaching implications if the geotechnical conditions are not suited for safe and cost effective excavation. Ideally the portal should be positioned Jan 1, 2009 
- 
                     Geotechnical Investigation Of Decline Shaft Portals Geotechnical Investigation Of Decline Shaft PortalsBy R. A. Puchner The location of a decline shaft portal can have far reaching implications if the geotechnical conditions are not suited for safe and cost effective excavation. Ideally the portal should be positioned Jan 1, 2009 
- 
                     Ventilation For Sinking Vertical, Sub Vertical And Decline Shafts. Ventilation For Sinking Vertical, Sub Vertical And Decline Shafts.By D. M. Walters To achieve safe and healthy working conditions in shaft sinking operations, ventilation, and where necessary cooling, must be provided. These requirements are considered for sinking vertical, sub-vert Jan 1, 2009 
- 
                     Transition From Open Pit To Underground Mining At Chuquicamata, Antofagasta, Chile Transition From Open Pit To Underground Mining At Chuquicamata, Antofagasta, ChileBy Antonio Karzulovic, Sergio Olavarría, Patricio Adriasola The economical analyses of different Chuquicamata open pit mine planning scenarios, indicate that the pit closure should occur at latest in the year of 2017. However, about 60,000 m of drill holes hav Jan 1, 2006 
- 
                     Sampling mineral commodities?the good, the bad, and the ugly - Synopsis Sampling mineral commodities?the good, the bad, and the ugly - SynopsisA wide range of drill holes and process streams are sampled for resource estimation, grade control, and contractual purposes in the minerals industry. However, despite the availability of training cou Jan 1, 2010 
- 
                     Competencies: Engineers As Managers - An Australian Case Study - Introduction Competencies: Engineers As Managers - An Australian Case Study - IntroductionBy R. Thomason Thank you Dr Barcza, President of the South African Institute of Mining and Metallurgy, for inviting me to share our experiences in Australia as regards the competency movement and my Association?s ex Jan 1, 1997 
- 
                     Classification of Roof Strata and Calculation of Powered Support Loads in Shallow Coal Seams of China Classification of Roof Strata and Calculation of Powered Support Loads in Shallow Coal Seams of ChinaBy G. Song "SynopsisAccording to the overlying rock strength and thickness of 10 shallow coal seams in China, the strata are classified into four types: weak and laminated strata (hereinafter referred to as WL), Jan 1, 2015 
- 
                     Shaft Sinking Scheduling/Planning - Introduction Shaft Sinking Scheduling/Planning - IntroductionBy P. N. Lategan Mining companies are challenged with increased difficulty in delivering capital projects on schedule and within budget. In 2005, PricewaterhouseCoopers global review of major capital projects in the m Jan 1, 2009 
- 
                     Shaft Excavation Method In Soft Soil ? Synopsis Shaft Excavation Method In Soft Soil ? SynopsisBy F. N. F. le Roux This paper describes the method used for excavating the upper 33m of emergency access shaft E2 for the underground single track tunnel running between Park and Rosebank station of the Gautrain Rapid R Jan 1, 2009 
- 
                     Shaft Excavation Method In Soft Soil ? Synopsis (57c66dec-079b-41a9-bafc-ab363857a914) Shaft Excavation Method In Soft Soil ? Synopsis (57c66dec-079b-41a9-bafc-ab363857a914)By F. N. F. le Roux This paper describes the method used for excavating the upper 33m of emergency access shaft E2 for the underground single track tunnel running between Park and Rosebank station of the Gautrain Rapid R Jan 1, 2009 
- 
                     Shaft Sinking Scheduling/Planning - Introduction (545beb62-d4f4-42b2-aefa-514c1419aba6) Shaft Sinking Scheduling/Planning - Introduction (545beb62-d4f4-42b2-aefa-514c1419aba6)By P. N. Lategan Mining companies are challenged with increased difficulty in delivering capital projects on schedule and within budget. In 2005, PricewaterhouseCoopers global review of major capital projects in the m Jan 1, 2009 
- 
                     Using Machine Carousel To Reduce Cladding Support Cycle At Pk2 Ventilation Shaft Using Machine Carousel To Reduce Cladding Support Cycle At Pk2 Ventilation ShaftBy Braam Blom PK2 Ventilation shaft is part of Paardekraal No 2 twin shaft system that is being developed to replace depleting Merensky reef production at Paardekraal shaft complex. The sinking team at this shaft f Jan 1, 2009 
- 
                     Using Machine Carousel To Reduce Cladding Support Cycle At Pk2 Ventilation Shaft (311f8feb-63e6-4d23-980e-900e4671e984) Using Machine Carousel To Reduce Cladding Support Cycle At Pk2 Ventilation Shaft (311f8feb-63e6-4d23-980e-900e4671e984)By Braam Blom PK2 Ventilation shaft is part of Paardekraal No 2 twin shaft system that is being developed to replace depleting Merensky reef production at Paardekraal shaft complex. The sinking team at this shaft f Jan 1, 2009 
- 
                     Copper Solvent Extraction: Status, Operating Practices and Challenges in the African Copper Belt Copper Solvent Extraction: Status, Operating Practices and Challenges in the African Copper BeltBy Kathryn C. Sole, Owen Tinkler "Although the first large-scale application of copper recovery by solvent extraction (SX) took place in Zambia in the early 1970s, it is only in the last decade that this technology has become widely Jan 1, 2015 
- 
                     Introduction To Nuasahi Chromite Mine ? An Under Ground Chromite Mine Introduction To Nuasahi Chromite Mine ? An Under Ground Chromite MineBy Vinay Kumar Agrawal, Rama Nath Praharaj IMFA Group is the largest producer of Charge chrome not only in India but also in Asia. This Group has plants situated at Therubali and at Choudwar. They also have a Thermal power plant at Choudwar wh Jan 1, 2007 
- 
                     The Corrosivity Regions Of Southern Africa ? Long Term Trends And Implications For Materials Selection - 1. Introduction The Corrosivity Regions Of Southern Africa ? Long Term Trends And Implications For Materials Selection - 1. IntroductionBy John E. Leitch The cost of corrosion as measured by such cost components as the renovation or replacement of coated steel, or the use of expensive coating systems on steel, is considerable. Extrapolating from figur Jan 1, 2006 
- 
                     Characterisation Of SO2 In Off-Gas At Zimplats Smelter Characterisation Of SO2 In Off-Gas At Zimplats SmelterBy L. Mabiza Keywords: Pyrometallurgy, furnace, sulphur, SO2, off-gas, Zimplats Zimplats embarked on an off-gas sampling campaign in December 2009 to characterise the concentration of SO2 in the off-gas from Jan 1, 2011 
- 
                     A Review of Work-Integrated Learning in South African Mining Engineering Universities A Review of Work-Integrated Learning in South African Mining Engineering UniversitiesBy L. A. Maseko "As part of the mining engineering curriculum, students are required to be placed in industry for vacation work or work-integrated learning (WIL). In this paper we review work-based placement as done Dec 1, 2018 
- 
                     Bateman Mega DMS Modules- Successes And Challenges - Introduction Bateman Mega DMS Modules- Successes And Challenges - IntroductionBy N September, R Abate Bateman Modular (previously Van Eck and Lurie) has been building and supplying the mining industry with modular DMS plants for the last 30 years. These DMS modules range in capacity from 1 tph to 200 Jan 1, 2006 
