Concrete Filled Steel Tubes for Deep Foundations of Transportation StructuresBy Charles Roeder, Amy Leland, Dawn E. Lehman
Concrete filled steel tubes (CFSTs) are composite members that are commonly used in many countries today. CFST components are used in the United States, but they are more common in Asia, in part becau
Jan 1, 2019
-
Engineering Foundation Support For Las Vegas Strip's Tallest Hotel CasinoBy Nicholas P. Gura
This paper presents the analysis, design, and load test program results for drilled shafts to support a 70-story hotel tower and associated 10 story podium structures located in Las Vegas, Nevada. A
Jan 1, 2007
-
Tension Testing of the Grouted Anchorage Assembly for Multistrand AnchorsBy Lucian L. Bogdan
"SummaryActive loaded strand anchors are often used for slope stabilization, retaining walls or tiedown anchors. Normally, strands are tensioned against the structure and wedges are locked inside the
Jan 1, 2005
-
A New Design Method For Drilled Shafts In Rock ? SynopsisBy Chris M. Haberfield
The design of side resistance of drilled shafts socketed into rock has traditionally been empirically based on the results of pile loading tests in which the side resistance can be isolated from the s
Jan 1, 1996
-
Verification of Installation and Performance of ACIP Piles for BridgesBy W. Morgan NeSmith
"The DFI ACIP Pile Committee, in conjunction with the Florida DOT, completed an ACIP Pile installation monitoring and performance test program in late 2016 to advance the inclusion of ACIP piles in fu
Jan 1, 2017
-
Innovations in Mass Stabilization for Ground Improvement and Environmental RemediationBy Charles M. Wilk
"Mass stabilization (MS) is a ground improvement technique that can prepare areas of low bearing strength soil for subsequent infrastructure development. The technique involves mixing binding agents s
Jan 1, 2015
-
Deflection-based Design For The Capitol Crossing Support Of ExcavationBy Harald P. Ludwig, Matthew J. Niermann
The support of excavation (SOE) for the Capitol Crossing project in Washington, DC consisted of a combination of soldier piles, lagging, tiebacks, braces, underpinning, single auger soil mixed (SASM)
-
Wick Drains into the unknownBy Brian McGlynn
There are many factors that can result in a site characterization being limited. For example, a client may undervalue the importance of a good geotechnical report, or an owner may feel that it would t
May 1, 2023
-
Preliminary Assessment of Reliability and Sampling Requirements for Deep Mixing Method (DMM) Foundations for LNG Processing Facility and Storage Tank (52fd79c3-58e2-4970-9b21-5f8e12930105)By Paul Summers, Kevin Richardson, Willem (Billy) Villet, Paul J. Sabatini, Attasit Korchaiyapruk, Edward C. Clukey
"A deep mixing method (DMM) foundation was selected by the Project Team for a very large LNG facility in West Africa. As described in a companion paper, this foundation consists of a large number of c
Jan 1, 2017
-
Drilled Shaft Foundations For The Float-In Dam On The Monongahela River At Braddock, PaBy Robert B. Bittner
The new gated dam on the Monongahela River at Braddock, Pennsylvania, was built for the US Army Corps of Engineers using an innovative ?In-the-Wet? technology. A key feature of this technology involv
Jan 1, 2013
-
Very Deep Piling For The Highrise ‘De Zalmhaven’ In Rotterdam (Nl)By Ed Revoort, Robert Schippers
In Rotterdam in the Netherlands the project ‘De Zalmhaven’ is being developed. The project consists of the realization of houses, parking facilities, two residential towers of 70 m and a residential h
May 1, 2022
-
Drilled Shaft Foundations for the Float-in Dam on the Monongahela River at Braddock, PA (6c19e969-5f09-43f8-9e6e-1837d4537e5e)By Robert B. Bittner
The new gated dam on the Monongahela River at Braddock, Pennsylvania, was built for the US Army Corps of Engineers using an innovative "In-the-Wef' technology. A key feature of this technology in
May 11, 2007
-
Prestressed Concrete Sheet Pile Retaining Wall to Support Railroad Embankment Widening Adjacent to a WetlandBy Abhijit R. Sheth, Craig M. Benedict, John Brun, Ara G. Mouradian
"Amtrak recently replaced the 1907-era bascule two-track bridge over the Niantic River between East Lyme and Waterford, Connecticut. The project included new approach embankments, with approximately 2
Jan 1, 2017
-
Implementation Of Alternative Deep Foundation SystemsBy Ray Zelinski
Caltrans sponsored a research project in 1992 which incorporated proprietary and generic pile types. The piles were subjected to axial tensile/compressive loads in deep, soft soils. Descriptions of va
Jan 1, 1993
-
Diplomacy and Innovation: Octakong and the Hong Kong-Zhuhai-Macau Bridge ProjectBy David White
"When finished (projected completion in 2016) the Hong Kong-Zhuhai-Macau Bridge Project will comprise three cable-stayed span bridges and a 4.15 mile immersed tube tunnel - linking Hong Kong to Macau
Jan 1, 2017
-
Underpinning and Temporary Earth Retention for the ReTRAC Trench in RenoBy K. Ronald Chapman, Claus Ludwig, Doug Jenevein
"In the spring of 2005 Schnabel Foundation Company completed a $15.2 million Design/Build subcontract to underpin 11 structures, and provide 202,800 square feet of earth retention for the Reno Transpo
Jan 1, 2006
-
Soil Mixing Treatment of Marginal Soil for Railway Construction and MaintenanceBy Charles M. Wilk
"Mass stabilization involves mixing binding agents into marginal or contaminated soil to improve the subject material’s physical and/or chemical properties. This paper concentrates on the principles o
Jan 1, 2017
-
Time-Dependent Increase In Load Capacity Of Tapered PilesBy Jeongbok Seo
This paper describes successful application of driven tapered-steel-pipe piles for two large-scale projects in the New York metropolitan area: Rego Park Mall, Rego Park, N.Y. and 164 Kent Avenue, Broo
Jan 1, 2008
-
Deep Foundations for the Bangkok MRT Chaloem Ratchamongkhon Line Metro ProjectBy Peter A. Thompson, Richard E. Prust
"The Bangkok Mass Rapid Transit (MRT} Chaleom Ratchamongkhon Line project is the first underground subway to be completed in Thailand. It consists of 22 km (14 miles) of twin-bored tunnels and 18 cut
Jan 1, 2005
-
Calibration of the Gates Pile Driving Equation for LRFD in LouisianaBy Glenn J. Rix, Eduardo Tavera, Raphael Siebenmann, Zhongjie Zhang, Robert C. Bachus, Jongwon Jung
"The Louisiana Department of Transportation and Development (LADOTD) uses a variation of the FHWA-modified Gates equation to verify the nominal pile bearing resistance, typically on smaller projects w
Jan 1, 2017