Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Piles through Soft Clay for a Metro Project

    By Sanjay Gupta, Sorabh Gupta, Ravi Sundaram, Abraham Varghese

    "Geotechnical investigation for the Kochi Metro revealed a critical section of the Viaduct near Ernakulam Junction Railway Station. Four piers, located over a 220 m stretch, were passing through an ar

    Jan 1, 2015

  • DFI
    Estimating Kinematic Demands From Lateral Ground Deformations On Pile-Supported Wharves

    By Arash Khosravifar Ph. D. P. E., Thomas Torkelson P. E., Milad Souri Ph. D. P. E.

    Kinematic demands from lateral ground deformations can be a major cause of damage to maritime and highway transportation structures such as wharves, piers, and bridges. These kinematic demands are dif

    Oct 1, 2022

  • DFI
    Construction Of A New Quay Wall For A Sea Tank Terminal In The Port Of Antwerp

    By Stefan Mewes

    Europe’s second-largest seaport has installed a new combi wall consisting of pipe piles, sheet piles and inclined shaft grouted piles to support it. The new Liebherr piling rig with swinging leader wa

    Sep 1, 2022

  • DFI
    Recent Developments in Wind Turbine Foundation Design: Post Tensioned Single Pier

    By Mohsen Elsayed, Amr Sallam, Ahmad Mohamed, Xuebing Zheng, Mohamed Alrowaimi

    The foundation is an essential component of the wind turbine that ensures continued operation under stable and safe conditions. Both shallow and deep foundations are utilized to support wind turbines

    Jan 1, 2019

  • DFI
    Constructing Tsunami Walls with Pressed-In Sheet and Pipe Pile Combi-Walls

    By Takefumi Takuma, Tsunenobu Nozaki, Masashi Nagano

    The city of Naruto in the southwestern part of Japan is situated at the mouth of the mighty Yoshino River. An approximately 1,000m-long levee/bulkhead along one of the river’s tributaries in the city

    Sep 8, 2021

  • DFI
    Challenges in Managing an Aging Infrastructure, Lessons Learned from a Near Miss at the Lake Manatee Dam

    By Glen R. Andersen

    "Two of the greatest challenges we face in managing our aging infrastructure are to perform accurate condition assessments and to realistically predict the risk of non-action. The aim of this paper is

    Jan 1, 2017

  • DFI
    Use Of The Impression Pile To Reduce Carbon Emissions

    By S. E. Stallibrass, A. M. McNamara, J. P. Panchal, Leonardo M. LaLicata

    Urban development in congested cities requires a better exploitation of the available surface, leading to taller structures. These buildings are usually founded on piles that have to be increased in d

    May 1, 2022

  • DFI
    Diaphragm Wall For Deep Basement Provides Efficient Use Of Waterfront Property At Harbor East In Baltimore

    By S. Y. Fantaye

    This paper discusses the design, construction and performance of a 30 inch thick diaphragm wall recently constructed in Baltimore, Maryland at Inner Harbor East. The project site is an established ma

    Jan 1, 2008

  • DFI
    Nearshore Pile Construction Experience In Burnie, Tasmania

    By Thomas W. Scott, Manh N. Tran

    Marine environments present a range of challenges for pile construction. This paper contains a discussion on the design and construction of marine piles for a recent Toll Shipping wharf upgrade in Bur

    Nov 1, 2022

  • DFI
    Utilizing Real-Time Data and Statistical Analysis for Wet Soil Mixing: A Case History

    By Sunil Arora, Lisheng Shao, Chris Conkle

    "The East Garden Grove - Wintersburg Channel located in Orange County, California, required upgrades along the levees to mitigate potential liquefaction and lateral spreading hazards. The Orange Count

    Jan 1, 2015

  • DFI
    Northeast Boundary Tunnel – Mount Olivet Road Drop Shaft

    By Jeremiah M. Jezerski, Russell H. Lutch

    The Mount Olivet Road Drop Shaft (MOR-DS) support of excavation (SOE) is a circular unreinforced concrete shaft with an inside diameter of a 30.5 ft (9.3 m) and depth of 120.5 ft (36.7 m), constructed

    Oct 1, 2022

  • DFI
    Innovative Integrated Jet Grout And Contiguous Cfa Piled Solution For Complex Deep Shoring Wall In Soft Soils – Retaining Structural Design And Analysis

    By W. L. Chong, Y. Zou

    There are many types of Earth Retention Systems (ERS) available in the market where more than one method can be a feasible solution for a project. This paper examines the design and construct process

    Nov 1, 2022

  • DFI
    Diving Underground - Through a Hologram - To Better Understand Foundation Risk

    By Scott A. Anderson, Benjamin S. Rivers, Derrick D. Dasenbrock, Silas Nichols

    Unknown geotechnical conditions are a major source of risk. Unexplored places vastly outnumber the sampled and tested ones, and widely spaced boreholes with intermittent tests and samples are the norm

    Jan 1, 2019

  • DFI
    Wrigley Field – The 1060 Project

    By Darren S. Diehm

    "Construction for the restoration and expansion of 102-year-old Wrigley Field in Chicago, Illinois began at the conclusion of the 2014 baseball season. This six year project involves structural upgrad

    Jan 1, 1900

  • DFI
    Evolving Micropiles: Optimizing Foundations For Seismic Retrofit

    By Rob Jameson

    Micropiles are ideally suited to seismic retrofit applications. Their high tensile and compressive capacity can sustain the large concentrated loads induced during seismic events. Micropiles can be

    Jan 1, 2008

  • DFI
    Foundation Challenges And Innovative Solutions: The Wharf Phase 2, Washington, Dc

    By Aaron L. Sacks, David R. Good, Srinivas Yennamanda, Joseph K. Carey

    Construction of Parcels 6 and 7, the second phase of The Wharf, began in 2019 and geotechnical construction was completed by December 2020. The overall project consisted of horizontal site, parks, and

    Oct 1, 2022

  • DFI
    Urban Challenges In Design, Co-Ordination And Construction Of Deep Foundations And Retaining Walls

    By Pawan L. Sethi

    Design and construction of deep foundations and basements is increasingly becoming more complex, as the density and frequency of urban development increases. This growth brings various associated chal

    Nov 1, 2022

  • DFI
    Providing External Confinement to Precast Prestressed Pile Shafts to Improve Ductility - ·Experimental Observations

    By Andrew Budek

    "Analytical and experimental work has shown that achieving the full inelastic lateral capacity of a pile may require the formation of a plastic hinge below ground level, in the pile shaft. The confini

    Jan 1, 2005

  • DFI
    Broadway Viaduct Design Phase Load Test Program For Post Grouted Shafts

    By Mike Muchard

    A design phase load test program was performed at the Broadway Viaduct bridge site to evaluate load carrying capacity and constructability of post grouted drilled shafts. The program included construc

    Jan 1, 2009

  • DFI
    Charleroi Locks: Repair Methods to Restore Structural Integrity of Large-Diameter Drilled Shafts

    By Alexandre Alex) J. Bredikhin

    "DISCLAIMER: the statements presented herein are those of the author and do not necessarily represent the views of US DoD or its Components.ABSTRACTProgress on the $750M lock project on the Monongahel

    Jan 1, 2017