Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Dynamic modelling, simulation and control of a grinding circuit

    By H. W. Smith, D. Guerin

    "This paper describes the development of a dynamic model for a full- scale (64 tonnes/hr) grinding circuit consisting of an open-circuit rod mill feeding a ball mill operating in closed circuit. The o

    Jan 1, 1980

  • CIM
    Micro-Structured Iron (III)-Hydroxide Agglomerates with High Porosity as Adsorbent

    By Tobias Riedel, Peter Ay, University of Applied Sciences, Bianka Bade, Nicole Pausch, Bernhard Gemende, Florian Logsch, Matthias Leiker, Satyanarayana Narra, Claudia Glaser

    This study focusses on the production of micro-structured agglomerates with high porosity from iron (III)-hydroxide-containing materials as adsorbent. A fractal-like structure of the agglomerates was

    Jan 1, 2016

  • CIM
    Air-Photo Interpretation Reduces Costs For A Wide Variety Of Oilfield Projects

    By O. B. Horne, R. O. Morgan, C. E. Anderson

    "Air-photo interpretation and photogrammetry are two of the most effective and versatile tools available to the petroleum industry. The techniques have proven successful in providing solutions to many

    Jan 1, 1968

  • CIM
    SABC Circuit Operations at Eldorado?s Jinfeng Gold Mine

    By Yan Yang

    The Jinfeng gold mine is one of the three gold mines that Eldorado Gold has in China and it is the second largest gold mine in China. The mine is located in a relatively remote and mountainous area in

    Jan 1, 2012

  • CIM
    Conversion of Dome Mine No.8 shaft timber guides to steel guides and refits of shaft hardware and skips

    By W. G. Spencer, E. Sulis, P. M. Tiley

    "Dome Mine's No.8 shaft is located about 1 km northeast of Dome's No.3 shaft and mill complex in South Porcupine, Ontario.No.8 shaft was brought into production in 1984 to hoist ore and wast

    Jan 1, 1993

  • CIM
    Mixed Integer Programming Models for Intermediate Open Pit Scheduling with Variable Slopes

    By Hooman Askari-Nasab

    Open pit mine plans define the complex strategy of displacement of ore and waste over the mine life. The objective of the mine plan is to maximize the future cash flows within the technical and physic

    Oct 1, 2009

  • CIM
    Pyrometallurgical processing of Stillwater concentrates

    By J. G. Whellock, R. J. Phillips, J. W. Matousek, P. J. Marcantonio

    "Stillwater Mining Company (SMC), a partnership of Chevron Resources and Manville Corporation, produces a copper-nickel, platinum-palladium flotation concentrate at its Nye, Montana mine. The concentr

    Jan 1, 1989

  • CIM
    Haul Roads for Surface Mines in Canada

    By Dwayne D. Tannant

    This paper presents a summary of results from a questionnaire sent to surface mines in western Canada seeking information on haul road design, construction, and maintenance. There has been a marked in

    May 1, 2001

  • CIM
    The beneficiation of Canadian refractory silicate minerals - kyanite, sillimanite and andalusite

    By P. R. A. Andrews

    "The sillimanite group minerals, kyanite, sillimanite and andalusite are identified as alumino-silicate minerals with the common chemical composition AIP3.Si02' so that each possesses similar phy

    Jan 1, 1995

  • CIM
    Excavation of a mine shaft through deep overburden by natural freezing

    By John De La Vergne, Morri Medd

    "This paper describes the sinking of a circular concrete ventilation shaft through 110feet of water-bearing overburden. The brine circulation freezing method was used to stabilize the walls during exc

    Jan 1, 1982

  • CIM
    The use of computer blast simulations to improve blast quality

    By R. F. Favreau, R. A. Morin, G. W. Kuzyk, P. J. Babulic, N. J. Tienkamp

    "Atomic Energy of Canada Limited is constructing an Underground Research Laboratory (URL) as part of a comprehensive program to evaluate the concept of nuclear fuel waste disposal deep in crystalline

    Jan 1, 1989

  • CIM
    Research on Operator?s Mastery of Unmanned Construction

    By Masaharu Moteki

    At present, the Unmanned Construction System (UCS) is adapted on initial operation against the disaster. For instance, it has been used in Unzen. When the scale of the disaster is big, or the danger t

    Aug 1, 2013

  • CIM
    Geostatistical ore reserve estimation at the Lac Knife graphite deposit, Esmanville Township, Quebec

    By Marc Lavigne

    "The Lac Knife graphite deposit was estimated, as part of a feasibility study, using a geostatistical ore reserve estimation method: ordinary kriging. Based on the geology and its interpretation, the

    Jan 1, 1991

  • CIM
    Implementation of Advanced Control Strategies Using VentSim™ Control at San Julian Mine in Chihuahua, Mexico

    By Daniel Torres Espinoza, Jose Pinedo

    "Ventilation is a vital service in underground mines, required to provide fresh air to the work force and dilute diesel equipment gases (CO, NOx) and diesel particulate matters (DPM). At a Mexican pre

    Jan 1, 2019

  • CIM
    The Advantages of the Nemaska Electromembrane Process to Directly Produce Lithium Hydroxide

    By Jean-Francois Magnan

    "The old conventional process to produce lithium raw material dates from 1954 (CA patent #504477A). This process produces low purity lithium carbonate (Li2CO3) only. To obtain battery-grade carbonat

    Jan 1, 2016

  • CIM
    Rare earth element lithogeochemistry of granitoid mineral deposits

    By B. J. Fryer, R. P. Taylor

    "As a monitor of the processes involved in the formation of granitoid mineral deposits the coherent group behaviour of the rare earth elements (REE) actively reflects changing fluid characteristics. F

    Jan 1, 1983

  • CIM
    Progress Report on Use of On-Stream X-ray Analyser at Mattagami Lake Mines Limited

    By K. V. Konigsmann

    "The mill at Mattagami Lake Mines treats 3,850 tons per day. The mill feed is a heavy sulphide ore. It is composed ofPyrite & Pyrrhotite - 40%Marmatite - 17%Chalcopyrite - 2%Magnetite - 10%Talc and ot

    Jan 1, 1969

  • CIM
    The use of conductivity measurements in the control of grinding mills

    By A. Montini, M. H. Moys

    "A conductivity probe mounted in the shell of the mill has been used to measure the behaviour of the load in the mill as a function of operating variables. It was found that certain properties of the

    Jan 1, 1987

  • CIM
    Interpretation of second derivative aeromagnetic maps at the Silver Queen and Equity Silver mines, Houston, B.C.

    By B. N. Church, A. R. Pettipas

    "The second vertical derivative method of processing aeromagnetic data from low level helicopter surveys yields results correiatable with the known geology and may be utilized to indicate possible tar

    Jan 1, 1990

  • CIM
    Survey of the occurrence of Ra-226 in the Rio Algom Quirke I uranium mill, Elliot Lake

    By J. M. Skeaff

    "The main solution, ore and residue pulp streams in the Rio Algom Quirke I uranium mill at Elliot Lake have been sampled and analyzed for radium-226. Analysis of the ore and leached residues indicates

    Jan 1, 1981