Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Time Domain Reflectometry Measurements of Oil Sands Tailings Water Content: A Study of Influencing Parameters

    By A. R. Sorta, D. C. Sego

    ABSTRACT Temperature, solute, texture, and thixotropic effects on time domain reflectometry (TDR) measurements of water content in oil sands tailings are investigated. Results indicate that TDR water

    Jan 1, 2013

  • CIM
    Mineralogical and Metallurgical Study of the Mike Cu-Au(-Zn) Deposit, Carlin Trend, Nevada

    By Jaeheon Lee, Junmo Ahn, Isabel F. Barton

    "Newmont’s Mike prospect, currently undeveloped, is a blind Cu-Au(-Zn) deposit on the Carlin Trend, containing >8.5 M oz. Au, 1027 M lbs. Cu, and 809 M lbs. Zn as Carlin-type gold and polymetallic Cu-

    Jan 1, 2017

  • CIM
    Mining Methods at the Nickel Plate Mine

    By A. Shaak

    The town of Hedley is some 200 miles due east of Vancouver and lies in the bottom of the Similkameen River valley, at the junction of Twenty Mile creek, at about the 1,700-foot elevation above sea lev

    Jan 1, 1946

  • CIM
    Discover Jansen

    By John Stubbs

    Sub-Surface Shaft excavation Mine development Headframes Surface Production facilities Product storage and loading Tailings area Infrastructure Discovery Lodge Utilities Operatio

    May 1, 2013

  • CIM
    Conceptual Support Systems to Limit Damage to Tunnel Floors in Rockbursting Environments

    By M. Rizwan

    Mine workings are progressing to greater depths as shallow mineral resources are being depleted, and civil engineering projects are nowadays being developed at substantial depths. The threat to tunnel

    Jan 1, 2015

  • CIM
    Transformation of Iron-Containing Residues in the Pressure Acid Leaching of Arid Region Nickel Laterites

    By D. M. Muir

    The mineralogy of residues formed during the pressure acid leaching of arid region nickel laterite ore varies according to the salinity of the process water, alkali cation additives and the overall ac

    Jan 1, 2006

  • CIM
    Fe-Separation and HCL Regeneration Technologies for Ore Leaching Processes

    By G. Frithum

    In the present paper a new and highly economic route for Fe-separation from HCl leaching processes in hydrometallurgical applications is described. In most ore leaching processes, Fe is involved and n

    Jan 1, 2014

  • CIM
    The Role of Rock Mechanics Studies and Instrumentation in Balaghat Underground Mine of Moil - A Case Study

    By G. G. Manekar

    MOIL Limited (formerly Manganese Ore India Limited), a Government Enterprise, under the Ministry of Steel, Government of India, produces about 1.1 million tonnes (T) of manganese ore annually from thr

    Aug 1, 2013

  • CIM
    Investigation of Liner Shape Effects on Load Movement in Tumbling Mills by Discrete Element Method (Dem) - The Sarcheshmeh Copper Complex and Gol-E-Gohar Iron Ore Company Sag Mill Cases (14d0e787-f55b-4126-9ff1-fc13bad257f4)

    By Z. Bibak, S. Banisi, A. Ghasemi, E. Nematollahi

    "The major importance of liners in grinding is their role in providing an appropriate trajectory for the charge. Since it is not possible to study the charge movement by direct observation in operatin

    Jan 1, 2016

  • CIM
    Start Up, Commissioning and Optimization of the Gravity Circuit at Atlantic Gold’s Moose River Project in Eastern Canada

    By C. Hudson, D. Tremblay, A. Frey

    "A discussion of the design, challenges and successes associated with the commissioning of the gravity recovery circuit at Canada’s newest open pit gold mine - Atlantic Gold’s Moose River Consolidated

    Jan 1, 2019

  • CIM
    Triple Segmented Intercell Bar: A Contribution in Copper Electrowinning

    By E. P. Wiechmann, J. A. Henríquez, P. E. Aqueveque, L. G. Muñoz, G. A. Vidal

    "The original segmented intercell Optibar succeeded in reducing the magnitude and occurrence of short circuits. It also improved the specific energy consumption of the process. This paper expands the

    Jan 1, 2012

  • CIM
    Research on the Separating Features of a Permanent Magnetic Drum Separator Designed with Strong Specific Magnetic Force and Open Magnetic System

    By Chuanhui Cao, Shimei Liu, Xiaojing Li, Yueyuan Zhou

    "Force analysis on weakly-magnetic particles and non-magnetic particles in magnetic field are presented, using a kind of permanent magnetic drum magnetic separator, which is designed with strong speci

    Jan 1, 2016

  • CIM
    Rapid determination of corrosion rates of permanent-mold cast copper-base alloys

    By V. S. Sastri, M. Elboujdaïni

    "Corrosion rates of silicon brasses, highzinc yellow brass, low-zinc yellow brass, leadedtin bronze and silicon bronzes in both permanent-mold and sand-cast conditions were determined in soft water of

    Jan 1, 1997

  • CIM
    Cyanide Analysis for Complex Cyanide Solutions (CIM Journal | Vol. 4, No. 2)

    By W. van der Merwe

    ABSTRACT With the gold industry processing more complex ores, the online measurement and control of cyanide addition to the gold leaching circuit has become more critical. This paper compares the two

    Jan 1, 2013

  • CIM
    Simulation for Ball Mill Sizing: The Path to a Successful Plant Start-Up

    By A. Rousselet, H. Gilbert-Tremblay, A. Berton

    "Robex Resources interrupted production at the Nampala Mine in September 2014 following throughput and gold recovery results which were below expectations during the first months of operation. After a

    Jan 1, 2018

  • CIM
    Maintenance Control at Algoma's Macleod Mine

    By C. A. Campbell

    "There has been a significant reduction in maintenance hours and improved performance by maintenance crews at the MacLeod mine since the introduction of a Maintenance Control system which includes the

    Jan 1, 1973

  • CIM
    Influence of microstructural parameters of a SOFC composite cathode on the collection of reliable experimental data: A modelling analysis

    By B. Kenney

    For SOFCs, composite cathodes comprising an electronically conducting electro¬catalyst (e.g. LSM) and an conically conducting electrolyte material (e.g. YSZ) are considered to improve the electrochemi

    Jan 1, 2005

  • CIM
    San Antonio No. 3 Winze

    By R. J. R. Schaller

    NO. 3 winze, the sixth shaft to be sunk on the San Antonio property, is practically a duplicate of No. 3 shaft, which was the main shaft prior to the installation of the larger hoisting equipment in 1

    Jan 1, 1941

  • CIM
    Exploiting A Small Orebody

    By E P. Graham

    Orebodies occur in an infinite variety of grades, shapes and sizes, and take many millions of years to grow. When extraction starts there is only one possible end -the mine sooner or later will run ou

    Jan 1, 1964

  • CIM
    Classification of ore reserves/resources based on geostatistical methods

    By P. Diehl, M. David

    "As shortage in the supply of mineral commodities become more probable, there is an increasing need for reliable and comparable reserve/resource data. It is therefore necessary to standardize the trad

    Jan 1, 1982