Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Developing Asset Strategies and a Zero Based Budget for an Iron Ore Crushing Plant

    By Jason J. Ballentine

    This paper presents a case study of how an asset strategy and zero based budget was developed for an existing crushing plant that had been purchased from the contract service provider by an Australia

    May 1, 2007

  • CIM
    Cadia Expansion ? From Open Pit to Block Cave and Beyond

    The Cadia mine is shifting from the open pit operation to the Cadia East underground block cave. The resulting increase in milled tonnes and the decrease in fines production through shifting to block

    Jan 1, 2012

  • CIM
    The Donalda gold deposit, Rouyn-Noranda, Quebec

    By Gérald Riverin, Bernard Boily, Daniel Bernard

    "The Donalda gold deposit is located in the southern part of the Noranda camp, approximately 2 /em east of the Horne deposit. Combined past production and current reserves total over 1.5 Mt grading 6.

    Jan 1, 1990

  • CIM
    Analyses of Minerals Containing Platinum-Group Elements

    "8.1. IntroductionThe stoichiometry of most named platinum-group minerals (POM) is known (cf. Cabri, 1981b, in Chapter 7), but, because these minerals are subject to a wide range of element substituti

    Jan 1, 1979

  • CIM
    Analysis of electrochemical noise data with phase space methods

    By A. J. Makoka, B. C. Qi

    Reliable monitoring of corrosion is vitally important in the combat against corrosion and over the last two decades the interpretation of electrochemical noise has received considerable attention as a

    Jan 1, 2005

  • CIM
    Supergene Mineralization at the Kori Kollo Gold Mine, Bolivia

    By C. M. Clapperton, K. E. Darke, A. J. Boyce, C. M. Rice, S. D. Redwood

    "Abstract - The Kori Kollo gold deposit is hosted by a c.15 Ma sericitized dacite stock in the La Joya district on the Bolivian Altiplano. The mineralization is of the Bolivian polymetallic vein (BPV)

    Jan 1, 1997

  • CIM
    Supergene Mineralization at the Kori Kollo Gold Mine, Bolivia (5a50eab3-2567-48d0-8c87-7819113638f7)

    By C. M. Clapperton, K. E. Darke, A. J. Boyce, C. M. Rice, S. D. Redwood

    "The Kori Kollo gold deposit is hosted by a c.15 Ma sericitized dacite stock in the LaJoya district on the Bolivian Altiplano. The mineralization is of the Bolivian polymetallic vein(BPV) type, with a

    Jan 1, 1997

  • CIM
    The Significance of Eclogite and Cr-poor Megacryst Garnets in Diamond Exploration

    By Daniel J. Schulze

    Abstract-Eclogite is an important source of diamond in the upper mantle, but is more localized than peridotite. Using eclogitic minerals in kimberlite and diamond exploration is also more problematic

    Jan 1, 1997

  • CIM
    The Signifcance of Eclogite and Cr-poor Megacryst Garnets in Diamond Exploration

    By Daniel J. Schulze

    Eclogite is an important source of diamond in the upper mantle, but is more localized than peridotite. Using eclogitic minerals in kimberlite and diamond exploration is also more problematic than usin

    Jan 1, 1997

  • CIM
    The Timber Resources of the Territory Served by the Pacific Great Eastern Railway

    By P. Z. Caverhill

    In this section of the province only the most meagre of surveys have been made and because these are not sufficient to determine with any degree of accuracy even the total forest area, the information

    Jan 1, 1925

  • CIM
    Determining Milling Parameters of a Pear-Shaped Ball Mill for Grinding High-Talc Oxidized Copper-Cobalt Ore

    By M. B. Kime, A. T. Kaniki

    "Grinding tests were conducted on an oxidized copper-cobalt ore using a pear-shaped ball mill. Twelve mono-sized ore fractions were prepared and wet ground batchwise. The mill was run for 0.5 to 30 mi

    Jan 1, 2017

  • CIM
    Fine Grinding Investigations at Lake Shore Mines (10a67995-9fcf-4997-9b1a-13fa03a556a1)

    By The Staff

    WE were requested to make a digest of our original grinding report, Fine Grinding Investigations at Lake Shore Mines. This digest is much easier to read than the original report, but it lacks the expe

    Jan 1, 1941

  • CIM
    The Red-Chris porphyry copper-gold deposit, northwestern British Columbia

    By J. M. Newell, G. R. Peatfield

    "The Red-Chris porphyry Cu-Au deposit is located between Ealue and Kluea lakes, southeast of the village of Iskut on the Stewart Cassiar highway in northwestern British Columbia. It was explored by Te

    Jan 1, 1995

  • CIM
    Developing Maintenance Plans Designed to Reduce Efficiency Losses in Fired Equipment

    By Jason J. Ballentine

    This case study presents the results of a maintenance review of a soot blower system at a coal fired power generation station. The power generation station was following a ?repair when it breaks? main

    May 1, 2007

  • CIM
    Process Mineralogy of Samples from the Wellgreen Cu-Ni-Pt-Pd Deposit, Yukon

    By Larry J. Hulbert, Louis J. Cabri, John L. Campbell, Gilles Laflamme, Chris G. Ryan, Soey H. Sie, Rolando Lastra

    "Abstract- The mineralogy of samples from the Wellgreen Cu-Ni-Pt-Pd deposit, Yukon Territory, is complex and the metals of interest are contained within fme-grained minerais which vary in size and min

    Jan 1, 1993

  • CIM
    Effects of Mg, Si, and Cu on the Formation of the Al3Sc/Al3Zr Dispersoids

    By T. J. Langan, M. Ramajayam, T. Dorin

    "6xxx-series Al alloys are the most commonly used alloys in the automotive industry as they have an appropriate balance of strength, corrosion resistance and formability. The main strengthening phase

    Jan 1, 2018

  • CIM
    Total Plant Control by a Process Computer at Quebec Cartier?s Mount Wright Property

    By G. Bourque

    One of the design criteria for the Mount Wright facilities was to incorporate the latest proven automation techniques and devices for the new crushing, grinding and concentrating plant. The heart of

    Jan 1, 1977

  • CIM
    Modification of the Sarcheshmeh Copper Complex Flotation Circuit in Response to a Reduction in Feed Grade

    By S. Banisi, E. Arghavani, A. Akbari, Gh. A. Parsapour, S. Darvish Tafvizi

    The new copper processing plant of the Sarcheshmeh copper complex consists of two parallel circuits. After a primary crushing, the ore is sent to a SAG mill and the product is further ground in a ball

    Jan 1, 2016

  • CIM
    Nickel - Boron Plating on AZ31 Magnesium Alloy

    By X. Shi

    Magnesium, the lightest structural metal, has not yet been considered as a serious contestant for automotive use due to its weaknesses in corrosion. Electroless nickel-boron alloys are well known for

    Jan 1, 2006

  • CIM
    The Road to Production-Line Mining II -Into the Seventies

    By E. Zucker

    In this paper, as in the 1960 CIM paper of the same name, s1gmf1cant new developments in electrical-mechanical mining equipment are briefly described. These include static thyristor-supplied D.C. driv

    Jan 1, 1969