Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
- 
                     Paracatu Gold Mine - Successful Processing of a Large Low-Grade Ore Body Paracatu Gold Mine - Successful Processing of a Large Low-Grade Ore BodyBy Wayne Phillips, Anatalia Silva, Robert Henderson, Tondo. Luis "Kinross’ Paracatu Mine has 20 years of operational success as one of the lowest grade milloperated gold mines in the world. At year end 2005, Paracatu’s Proven and Probable Reserves were 1.18 billion Jan 1, 2007 
- 
                     Barrick Goldstrike Roaster Facility Dry Grinding and Leach Barrick Goldstrike Roaster Facility Dry Grinding and LeachBy Dayle Denton, Lloyd Buckingham, Kenneth G. Thomas, Jacques McMullen "The dry grinding and leaching circuits of Barrick Gold’s new Roasting Facility at Goldstrike Mine in Nevada, USA incorporate well proven technologies in a unique combination. During the design of the Jan 1, 2001 
- 
                     The impact on underground ventilation of the reduction of diesel emissions toxicity by water-in-oil fuel emulsification The impact on underground ventilation of the reduction of diesel emissions toxicity by water-in-oil fuel emulsificationBy J. P. Mogan, E. D. Dainty, A. Lawson "The toxicity reduction of emissions from two diesel engines by the emulsification of water into fuel oil was investigated to determine the applicability of such systems to underground mining machiner Jan 1, 1981 
- 
                     An experimental investigation into the trapping model core pillars with reinforced fly ash composites An experimental investigation into the trapping model core pillars with reinforced fly ash compositesBy M. K. Mishra, U. M. R. Karanam Relative to slender pillars, larger size pillars exhibit improved strata control. Fly ash, though traditionally treated as a waste product, is emerging as an alternate engineering material. This paper Jan 1, 2008 
- 
                     Effect of Operating Variables in Knelson Concentrators: A Pilot-Scale Study Effect of Operating Variables in Knelson Concentrators: A Pilot-Scale StudyBy Sunil Koppalkar, A. R. Laplante "A Pilot Plant was installed in one of the grinding circuits of the Dome Mill, Ontario, Canada. Tests were conducted on a KCCD12 Knelson Concentrator to systematically analyze the effect of operating Jan 1, 2007 
- 
                     The Shortage of Engineers -Are We Working on the Solution or Are We Part of the Problem? The Shortage of Engineers -Are We Working on the Solution or Are We Part of the Problem?During the past decade, the miner-al industries have been faced with an increasing shortage of engineers. The point has now been reached where the shortage may be termed critical. This shortage may be Jan 1, 1965 
- 
                     Techno-economic evaluation of thiosalt treatment processes Techno-economic evaluation of thiosalt treatment processesBy K. G. Wheeland, J. E. Dutrizac, M. Wasserlauf, A. A. Condy Numerous processes for the treatment of thiosalts in base metal milling effluents have been examined in the past decade. Flowsheets for thirteen processes are outlined, and cost estimates are presente Jan 1, 1988 
- 
                     Effluent Treatment with Toxicity Control at Placer Dome (CLA)’S Dome Mine Effluent Treatment with Toxicity Control at Placer Dome (CLA)’S Dome MineBy Trevor Yeomans, David Yaschyshyn "Placer Dome (CLA) operates the 90-year-old Dome Mine, in South Porcupine, Ontario.The milling operation currently processes 5 million tons of ore per year, from both the underground and Open pit mini Jan 1, 2001 
- 
                     The JORC Code —Maintaining the standard (5ac53f1e-7e19-4af1-878c-db9069b75b44) The JORC Code —Maintaining the standard (5ac53f1e-7e19-4af1-878c-db9069b75b44)By P. R. Stephenson "The Australasian Code for Reporting of Mineral Resources and Ore Reserves (JORC Code) has been operating successfully for 14 years, and has an ancestry dating back over 30 years. Together with comple Jan 1, 2004 
- 
                     Implementation of a Semi-Autogenous Grinding Circuit at the Brunswick Concentrator Implementation of a Semi-Autogenous Grinding Circuit at the Brunswick ConcentratorBy Chris Larsen, Ian Orford, Mike Cooper "An autogenous grinding circuit was commissioned at the Brunswick concentrator in October 1998. The autogenous grinding circuit replaced existing surface crushing plants, fine ore storage, rod and pri Jan 1, 2001 
- 
                     Matching Motor to Mill Torque with Variable Speed Drives Matching Motor to Mill Torque with Variable Speed DrivesBy Craig M. Sams "Variable speed mill popularity has grown during the last 10 years with almost every SAG mill fitted with a variable speed drive. In addition, many of today’s larger ball mills are running a variable Jan 1, 2007 
- 
                     G Cell Pneumatic Flotation Technology a High Performance Imhoflot Technology for Molybdenum Applications G Cell Pneumatic Flotation Technology a High Performance Imhoflot Technology for Molybdenum ApplicationsBy Flavio Rojos-Tapia, Oscar Pereira-Cerda, Samuel Sánchez-Pino, Samuel Sánchez-Baquedano "Pneumatic flotation was introduced to the Chilean Copper Mining Industry in 1993 by Ingeniería de Minerales S.A. (IDM). The technology is based on the designs of Dr. Rainer Imhof from Germany, who is Jan 1, 2008 
- 
                     Development of a Stable Social Unit at the Black Angel Mine Development of a Stable Social Unit at the Black Angel MineBy P. J. Noakes Remote and isolated, located in a frigid, hostile environment, the Black Angel mine in Greenland had to create a warm social environment which would help attract and retain a stable work force of mine Jan 1, 1978 
- 
                     Achieving the Benefits of Information Technology in Surface and Underground Mining Processes Achieving the Benefits of Information Technology in Surface and Underground Mining ProcessesBy Sean Dessureault Information technology (IT) initiatives in the past have tended to be sold on their ability to maximize resource output and return on capital by using assets more effectively and efficiently. Many IT May 1, 2002 
- 
                     Geochemical and geophysical gold exploration in the Timmins area, Ontario: a case history Geochemical and geophysical gold exploration in the Timmins area, Ontario: a case historyBy A. Philipp, A. S. Middleton, G. A. Harron, A. B. Durham "Basal till sampling techniques were used to search for gold mineralization in the Timmins, Ontario area. During 1978 and 1979, approximately 90 overburden sampling drill holes were completed in Murph Jan 1, 1987 
- 
                     Kairos Mining: A Comprehensive Approach to Sustained Long-Term Benefits in Copper Processing Plant Automation Kairos Mining: A Comprehensive Approach to Sustained Long-Term Benefits in Copper Processing Plant AutomationBy Luis Castelli, Aldo Bonomelli, Giselle Schifferli, Claudio Zamora "This paper introduces the operational concept and the description of a multi-site Remote Support Center for knowledge management and long-term process performance improvement.This centralized Support Jan 1, 2010 
- 
                     UNIFLOT SP129 - Copper Sulphide Collector UNIFLOT SP129 - Copper Sulphide CollectorBy S. Auger, S. McDonald, K. Ward "This preliminary paper provides a summary of lab and mill flotation investigations into the copper collector at two Canadian operations. The orebodies illustrated in these studies both contain mainly Jan 1, 1992 
- 
                     The use of copper cast cooling members in the ironmaking process The use of copper cast cooling members in the ironmaking processBy G. Thom, A. Kay, J. B. Hyde "This paper will initially outline the specific types of copper castings used in blast furnace iron production. Tuyeres, tuyere coolers and stack cooling plates will be discussed in some depth, with p Jan 1, 1982 
- 
                     Kiena Maintains Up To Date Image with a New Gold Mill Kiena Maintains Up To Date Image with a New Gold MillBy R. Jolicoeur, J. F. Jackson, M. A. Green "The design, construction and commissioning of Kiena Gold Mines Limited's new mill was completed in 15 months ending in September 1984. Rated at 1250 tonnes per day the mill incorporates the latest in Jan 1, 1986 
- 
                     Continuous loading at Brunswick Mining Continuous loading at Brunswick MiningBy J. Jerome MacDonald, Stephen B. Flewelling "In the base metals industry of today, operations required to continuously improve productivity and reduce unit production costs. Consistent with these goals is the improvement of the muck haulage cyc Jan 1, 1989 
