Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Optimisation of the Milling Design of the Chessy Project Near Lyon, FranceBy Gallet M, Watsford R. M S
The 1989 feasibility study of the chessy, france, copper, zinc, pyrite and barite orebody was based upon a classical flowsheet. The flowsheet included, three stages of crushing, conventional rod and
Jan 1, 1991
-
US Bureau of Mines Coal Mining Automation ResearchBy Bevan JE
The US Bureau of Mines is conducting research to improve the health and safety for underground coal miners, and the efficiency of the mining systems that are used. In 1986, the Bureau began a major re
Jan 1, 1991
-
Overburden Geochemistry and Acid Rock Drainage Scale-Up Investigations at the Grasberg Mine, Papua Province, IndonesiaBy J Andrina, D Richards
The Grasberg is a large copper and gold open pit mine operated by PT Freeport Indonesia and located in the high equatorial mountains of Papua Province, Indonesia. The climate is alpine/sub-alpine with
Jan 1, 2003
-
Interferometric Synthetic Aperture Radar (InSAR) and its Potential to Monitor Subsidence Over Caving Zones Induced by Underground MiningBy H Zahiri
Utilisation of the InSAR technique for monitoring of subsidence in mining areas, employing open pit and underground mining methods, has large potential due to sensitivity and safety issues associated
Jan 1, 2008
-
Direct Fuming of Zinc from Sulphide ConcentratesBy Iley J. D
The production of zinc from low grade concentrates, particularly those high in iron, has a poor economic return due to a combination of higher concentrate transport costs, increased processing costs
Jan 1, 1993
-
Using Waste From Sand Mining to Reduce Environmental Impacts Coming From the Stocking ProcessBy L Soares, W T. Hennies, F Fujimur
Barra Bonita reservoir, located in the Sao Paulo State, Brazil, has been mainly used for local navigation and electricity generation to supply a prosper region in the country. Sand mining activities i
Jan 1, 2003
-
Some Notes on Carbide Tipped Rock Drill BitsFor several decades miners have been obliged to maintain a vast supply of sharp steels at the working face to meet the hungry needs of rock-drills. In medium and large size mines this has meant the se
Jan 1, 1948
-
The Development And Design Of A Cemented Rock Filling System At The Mount ISA Mine AustraliaThis paper examines the various stages of development and design work which were necessary to develop the cemented rock fill system for copper mining at Mount Isa. The reason for a cemented sand fil
Jan 1, 1973
-
Coking Coal and Iron Ore ù Comparisons and ContrastsThe products from beneficiation present themselves at opposite ends of the spectrum, and yet numerous synergies exist in the preparation of coking coal and hematite iron ore products for their common
Jan 1, 2005
-
Surface Reactivity of High-Sulfide Copper Mine Tailings Under Shallow Water Cover ConditionsBy A D. Paktunc
The surface reactivity of underwater deposited, high-sulfide copper mine tailings was evaluated under fresh and saline water cover conditions by measuring the surface and pore water quality as a funct
Jan 1, 2003
-
Some considerations on the engineering performance of subaqueously‐deposited siltsBy D Reid
Many of the relevant engineering behaviours of tailings are controlled to a large degree by the density of the material. For example, loose tailings are prone to brittle strength loss, while dense tai
Jul 1, 2021
-
Recent Developments in Shaft Sinking and Tunnelling in Melbourne's Sewerage SystemOne of the responsibilities of the Melbourne and Metropolitan Board of Works is to provide a sewerage system for the metropolis of Melbourne which now contains over 2.5 million people. In providing
Jan 1, 1976
-
Possible Heat Stress Problems Associated with Underground Mining in the NT, with Particular Reference to Woodcutters MineBy Wetzeil N
High ambient temperatures combined with high surface humidity in the north of Australia and, in particular, the northern areas of the Northern Territory can make underground workplaces relatively in
Jan 1, 1994
-
Driving Future Tunnels with Mechanical or Explosion Energy - A Blasting Engineer's ViewThe current drill-and-blast method of tunnelling is cyclic and, for this reason above all others, has a future application potential which is lower than that of continuous methods. There is scope
Jan 1, 1987
-
The Use of Electronic Detonators to Access Additional Aggregate Reserves Adjacent to Subsurface StructuresBy R Farnf, M Pegden, S Hosein, T White
A number of theoretical papers have been published outlining the use of electronic detonators to limit peak particle vibrations levels, but few empirical studies have been undertaken and even fewer ex
Jan 1, 2007
-
Mathematical Economic Models of Assessment of Technological Progress in the Mining IndustryMathematical economic models for assess ment of technological progress in the mining industry in the USSR are discussed. The models are based on a simple index, TT which approxi- mates the rate of g
Jan 1, 1977
-
A Study of How the Velocity of Detonation Affects Fragmentation and the Quality of Fragments in a MuckpileBlasting in Norwegian mines is often carried out by contractors who tend to look for the cheapest solution, without concern about fragment quality. The requirementsfor a contractor are usually only
Jan 1, 1995
-
TBM Use in Mine DevelopmentBy Zamel G. I, Zenari L. P
Technological developments in modem Tunnel Boring Machines (TBMs) and associated back-up equipment are offering significant alternatives for mining operators to consider, in the selection of equipment
Jan 1, 1993
-
Rehabilitation, Recommissioning and Upgrading of the Leinster Nickel ConcentratorBy Millett R
In January 1989, Western Mining Corporation (WMC) acquired the Perseverance and Rocky's Reward orebodies and associated infrastructure from the Agnew Mining Company (AMC). AMC had closed the o
Jan 1, 1991
-
Resilient Design of Large Open Pit SlopesBy S M. Arndt, D Tyler, F Reusch
Although significant advances have been made in understanding the mechanics of pit slopes, numerical modelling hasnÆt significantly impacted on the reliability of the design process. It is well known
Jan 1, 2007