Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Assessment of Options for Economic Processing of Preg-Robbing Gold Ores

    By K Buda, W Staunton, M Hill, V Tjandrawan

    One of the challenges facing the gold industry in the 21st century is the continuing need to identify new reserves of economically treatable ores. Discoveries of large, metallurgically simple orebodie

    Jan 1, 2007

  • AUSIMM
    Best Practices in Process Simulation for Design of Complex Metallurgical Plants

    By H W. Scriba

    The development and improvement of computer-based process simulation packages over the past 20 years has provided process engineers with a powerful tool to use in the design of complex metallurgical p

    Jan 1, 2008

  • AUSIMM
    The Challenges of Success

    Mining in the twenty-first century brings with it a new range of challenges, some unfamiliar to our industry. Skilled staff recruitment and retention is a significant issue. Equipment supply lead time

    Jan 1, 2007

  • AUSIMM
    Reducing the Variability in Dragline Operator Performance

    Australian coal mines have spent considerable capital on dragline improvements over the last two years. This has included ~$30 M on UDD conversions, >$20 M on new buckets, boom upgrades, electrical up

    Jan 1, 2005

  • AUSIMM
    Sulfur Isotope Signatures for Orogenic Gold Deposits, Lachlan Orogen, New South Wales

    By P K. Seccombe

    Sulfur isotope data are available for 18 low-sulfide orogenic gold systems hosted by the Lachlan Orogen in eastern New South Wales including those in the northern Hill End Trough (Hargraves, Hill End,

    Jan 1, 2008

  • AUSIMM
    Cover System Performance Monitoring for Tailings – Are We Doing It Correctly?

    By R Barritt, P Scott

    Across the globe, it is a common scenario that tailings storage facilities (TSFs) are being decommissioned; however, their subsequent impact on the local environment and landscape can often be overloo

    Jul 27, 2015

  • AUSIMM
    Integral Pressure Strip/Electrowin Circuit for Gold Recovery from Activated Carbon

    By Macaulay J

    The recovery of gold from cyanide liquors is frequently effected by using activated carbon. Process economics however require non destructive methods of gold extraction from the carbon so that it may

    Jan 1, 1984

  • AUSIMM
    Nickel Recovery from Nickel Refinery Waste Liquor

    By Reid JG, Cutfield S

    Considerable quantities of dissolved nickel are lost in the waste liquors from the QNPL nickel treatment plant. Cementation, precipitation and ion exchange techniques were investigated to reduce th

    Jan 1, 1978

  • AUSIMM
    A One Step Process for Manganese Leaching-Desulfurisation of Flue Gas

    By A He, J Li, J Pan, J Clout

    The removal of sulfur from SO2 containing flue gas is improved by adsorbing SO2 into solution with manganese ions as catalyser, however, burnt lime slurry has to be added to modify solution pH and the

    Jan 1, 2004

  • AUSIMM
    Dewatering Marra Mamba – Lessons Learned

    By K Sommerville

    BHP Billiton’s Area C iron ore operation has been in production since 2003. During 2010, below water table mining in the Marra Mamba formation commenced and dewatered ore has been successfully process

    Jul 11, 2011

  • AUSIMM
    Quantitative Mineral Mapping – A Building Block for Geometallurgy at Olympic Dam

    By K Ehrig

    Two irrefutable facts in geology and metallurgy are: ore deposits are comprised of variable mixtures of minerals which are systematically distributed throughout the deposit, and mineralogy exert

    Sep 5, 2011

  • AUSIMM
    Blast Fragmentation Modelling for a Green Field Open Cut Gold Deposit

    By G Chitombo, G Lewis

    The knowledge of the expected run of mine (ROM) fragmentation during the feasibility study of a green field site is essential for the design of downstream crushing and milling processes. However,the p

    Jan 1, 2004

  • AUSIMM
    Can æNovelÆ Ecosystems Offer Suitable Rehabilitation Alternatives for Post-Mined Landscapes?

    By P Audet, D R. Mulligan, D Doley

    This analysis attempts to reconcile existing ecological theories, rehabilitation planning goals and implementation constraints in the form of a rehabilitation paradigm that considers potential and pra

    Jul 10, 2012

  • AUSIMM
    Generation of 3D planar failure hazard maps for pit slope management

    By D E. Tennant

    In the fields of geotechnical engineering and slope management, various software packages are used to assess the behaviour or propensity for a slope to fail. Traditional kinematic analysis calculates

    Nov 29, 2022

  • AUSIMM
    The Awaroa Open Pit Project - Consenting Process

    By J Green, R Bartlett, A Goldstone, D Ferguson

    Solid Energy New Zealand is developing an extension of its Rotowaro open cast coal mine near Huntly. This large 8 year, 11 million tonne opencast coal mine, referred to as the Awaroa Project, is funda

    Jan 1, 2004

  • AUSIMM
    In-pit backfilling as part of integrated life-of-mine waste scheduling, closure planning and AMD risk management – Martabe Mine as a case study

    By K Grohs, A Satriawan, S R. Pearce

    Martabe gold and silver mine is operated by PT Agincourt Resources (PTAR) and is situated in northern Sumatra and comprises several deposits in steep terrain, and in a tropical climate, that are requi

    Aug 2, 2023

  • AUSIMM
    An Appraisal of Tunnelling in the Auckland Region for Infrastructure Development

    By J St George

    Much of AucklandÆs transport infrastructure has been developed on surface with little or no consideration of underground options. Current and planned transportation routes are now facing high costs du

    Jan 1, 2008

  • AUSIMM
    Application of Time Series Methods for Smelter Furnace Modelling and Control

    By Kam KM, Tran B

    Statistical techniques of Box and Jenkins (1976) have been used to assess the existing control schemes and determine the dynamics of flash smelting furnace at the Kalgoorlie Nickel Smelter. Pertinen

    Jan 1, 1996

  • AUSIMM
    Unveiling the future of psychosocial hazard management – a multidisciplinary approach

    By N Armitage, C Young

    In the dynamic realm of mining health and safety, addressing psychosocial hazards is crucial. Legislative requirements now demand employers navigate this complex terrain, but uncertainty often clouds

    Apr 16, 2024

  • AUSIMM
    A Methodology for Rock Mass Characterisation to Control Blast-induced Vibrations

    By A Karrech, E Hamdi

    The uncertainty of geomaterials properties is commonly encountered in resource engineering applications, especially in mining engineering where the rock mass texture, joints, fractures and damage zone

    Aug 24, 2015