Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Strategic thinking about long-term ‘above ground’ orebody complexity using scenarios

    By T Craske, J Sykes, T C. McCuaig, M Jessell, A Trench

    The prevalent strategic approach in the mining industry is one of planning. However, it is widely recognised that planning does not work in complex and uncertain situations (Mintzberg, 1994), such as

    Nov 21, 2018

  • AUSIMM
    Trajectory Design and Economic Analysis of Asteroid Mining Missions to Asteroid 2014 EK24

    By S Dorrington, J Olsen, N Kinkaid

    Several studies have been conducted on the economic analysis of mining near-Earth asteroids for resources for use in Earth orbit. While these studies use detailed economic figures of merit, they often

    Nov 4, 2015

  • AUSIMM
    Risk assessment tool for mines using diesel-powered mobile equipment

    By A Reid, A W. Musk, O Jones

    In this paper, the authors attempt to bridge the gap that currently exists between the duty-of-care responsibilities of underground mining industry personnel, and the multifaceted health challenges fa

    Oct 16, 2017

  • AUSIMM
    Bored Reinforced Piles for Raise Bore Support – Four Case Studies and Guidelines Developed from Lessons Learnt

    By P Marlow

    Raiseboring is an attractive method of constructing shafts, being safe, fast and comparatively cheap. But this means back-reaming through weathered ground. However in the gravels and weathered near-su

    Mar 21, 2011

  • AUSIMM
    Five Years With Paste Fill ù Experience at Henty Gold Mine

    By T J. Grandfield

    Paste fill has been used successfully at Henty Gold Mine for the past five years. It has allowed 100 per cent extraction of the orebody, stabilised poor ground and enabled wide sections and offsets to

    Jan 1, 2002

  • AUSIMM
    Assessing the volume change behaviour of red mud through laboratory and field testing

    By D J. Williams, A Shokouhi, A Naderian

    Extracting alumina from bauxite involves the production of fine-grained waste known as red mud. The highly alkaline red mud is usually neutralised by applying sea water, thickened to between 25% and 3

    Jul 23, 2018

  • AUSIMM
    Predictive Maintenance Using Simulation and Machine Learning

    By R Marchant, D Willingham

    "Predictive maintenance (also known as PHM or equipment ‘health monitoring’) refers to the intelligent monitoring of equipment to avoid future equipment failures. In contrast to conventional preventiv

    Oct 10, 2016

  • AUSIMM
    Recommended Design Methods and Serviceability Limits for Permanent Rock Bolts

    By D J Maconochie

    The use of rock bolts as permanent support has been prohibited by client specifications in several recent large tunnel projects in Australia. The justification for this appears to lie in concerns with

    Mar 8, 2011

  • AUSIMM
    Issues Confronting Major Expansions and New Developments

    The mining industry has expanded significantly in the Pacific Region over the past two decades through a mix of new developments and brownfields expansions of existing operations. Despite this overall

    Jan 1, 2004

  • AUSIMM
    A Predictive Model for Beneficial Use of Rehabilitated Mine Tailings for Grazing Cattle after Mine Closure

    By B N. Noller, J C. Ng, S L. Bruce

    Mining activities can result in the transfer of harmful elements, including arsenic and lead, into the environment. In Australia, one of the potential future uses of rehabilitated mine land is to stoc

    Jul 16, 2014

  • AUSIMM
    The Resistance of Cyclone Underflow Material to Flow Liquefaction

    By J Boshoff, D Reid

    It has been recognised worldwide that the liquefaction risk of unconstrained tailings stacks or cyclone underflow embankments requires careful consideration. The stability of a tailings deposit where

    Jul 27, 2015

  • AUSIMM
    The Role of Chlorine in the Passivation of Preg Robbing Gold Ores

    Chlorination of organic matter by direct injection of chlorine gas or hypochlorite has been investigated metallurgically worldwide with little understanding of the basic chemistry of the passivation

    Jan 1, 1991

  • AUSIMM
    Mine geology standardisation – providing the foundation to consistent short-term geometallurgical product predictions in a complex multimine and supply chain environment

    By B L. Sommerville

    "The theme of this International Mining Geology Conference is ‘Setting New Standards’. Rio Tinto’s iron ore operations include a complex integrated supply system to deliver ore from 15 mine operations

    Sep 20, 2017

  • AUSIMM
    Bentonite and Fuller's Earth Deposits of New South Wales: II. Bonding Properties

    By Giles C. N, Loughnan F. C

    Bentonites and active earths from N.S.W., previously analysed with respect to occurrence, mineralogy and physical properties have been evaluated for use as bonding agents in quartzose moulding sands i

    Jan 1, 1959

  • AUSIMM
    Simulating Integrated Hydrology in Mining Catchments from Planning to Closure

    By S Szylkarski, D N. Graham

    In mining, water management is an operational necessity, requiring planning and detailed engineering, as well as risk assessment. Yet, the hydrology of streams and aquifers typically extends well beyo

    Jun 28, 2016

  • AUSIMM
    Modelling Open Pit and Underground Production Scheduling in Concert

    By B King

    A large number of mineral deposits contain regions in which it is economically beneficial to extract ore both via open pit and underground mining techniques. Current industry practice lacks an effecti

    Nov 24, 2014

  • AUSIMM
    In situ observation of phase transition of silico-ferrite of calcium and aluminium

    By H Kim, J Park, J Lee

    Silico-ferrite of calcium and aluminium (SFCA) is a bonding phase in the iron ore sinter. The phase transition upon melting of SFCA was investigated with Differential Scanning Calorimetry and Confocal

    Jun 19, 2024

  • AUSIMM
    Mining method, and controls, to cut back a failed slope at KCGMs Fimiston Pit (KCGM Superpit)

    By C E. Woolley, H Jebaliya, J Foster

    The East wall of the Kalgoorlie Consolidated Gold Mines Fimiston Open Pit (KCGM Superpit) has a history of wall instabilities impacting mining operations; the most significant of which occurred in May

    Jun 22, 2022

  • AUSIMM
    Solving a Large Stochastic Integer Programming Model for Production Scheduling at a Gold Mine with Multiple Processing Streams and Uncertain Geology

    By M de Freitas Silva

    One of the main steps during the decision-making process of long-term mine planning is the definition of the optimal sequence of extraction, which usually is synonymous with maximising the discounted

    Nov 24, 2014

  • AUSIMM
    Stabilising and filling the Beaconsfield Hart Shaft

    By A Turner, P Hills, D Johnson

    Underground mining for gold began in Beaconsfield in 1877 and development of the Tasmania Mine saw the sinking of multiple shafts, including the Hart Shaft over the ensuing 35 years. The mine closed i

    Nov 30, 2018