Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Controlled Partial Recirculation in Mine Ventilation

    A brief review of the problems in ventilating and cooling deep and hot Australian mines is presented. An overview is given on the development of the controlled partial recirculation concept. The mai

    Jan 1, 1994

  • AUSIMM
    Mine Design with Special Reference to Shaft Pillars at Great Depths

    The paper poses certain questions relating to mine design aspects of deep shaft pillars. It then explores these questions in relation to Western Deep Levels (South) where a sub-shaft system is to

    Jan 1, 1986

  • AUSIMM
    Empirical Evaluation of Factors Affecting Froth Stability in Copper Flotation

    By M Zanin, E Chan, D Xu

    An experimental design has been developed to investigate the relative influence of distinct pulp and environmental properties on froth stability in the flotation of a typical porphyry copper ore. In p

    Sep 1, 2014

  • AUSIMM
    Rail Haulage and Off-Highway Truck Development at Weipa

    By Mortimer RR

    The Weipa bauxite mining operation on the west coast of Cape York currently mines lb million tonnes of crude ore per year from the Andoom and Weipa mines. Andoom ore is trucked up to 4 km to a rai

    Jan 1, 1978

  • AUSIMM
    Process Mineralogy of Manto Verde, Chile

    The Manto Verde copper mine (Atacama Region, Chile) is due to go into production in 1996. It will produce 40 000 tonne/year of copper cathode by heap leaching/SX-EW. Mineralogical studies were underta

    Jan 1, 1994

  • AUSIMM
    Mt Isa copper concentrator cleaner circuit redesign

    By P Radulovic, V Lawson, M Muller, J Wallace

    The Mount Isa Copper Concentrator was commissioned in 1973. Since commissioning some significant upgrades have been undertaken such as: • the replacement of the rod mill/ball mill circuit with AG mill

    Sep 11, 2017

  • AUSIMM
    Roof Support of Square Pillar Extraction Systems

    General design of pillars to ensure a continuing roof support during ex- traction is discussed. Practical problems associated with pillar extraction are Outlined.

    Jan 1, 1974

  • AUSIMM
    The Planning and Design of the Prospect to Pipehead Tunnel

    The Prospect to Pipehead Tunnel is a component of the Sydney Water Board's multi-million dollar Drinking Water Quality Program to improve the quality of Sydney's potable water supply to meet

    Jan 1, 1993

  • AUSIMM
    The Imperial Smelting Furnace - Operations with Increased Tuyere Angle

    By Potter DJ, Firkin GR

    The Imperial Smelting Furnace operated by Sulphide Corporation Pty. Limited at its Cockle Creek zinc-lead smelter was recently equipped with tuyeres angled at 25 degrees instead of the usual 10 de

    Jan 1, 1981

  • AUSIMM
    An Attempt to Delineate the Spatial Limits of A Hydrocarbon Reservoir by Thermal IR Remote Sensing Mission - A Case Study from Cambay Basin, Gujerat, India

    The calibrated thermal IR data of part of Cambay Basin is used to determine surface temperatures and to detect the heat flow. Applying the conductive heat flow continuation technique, the three d

    Jan 1, 1986

  • AUSIMM
    Final Session

    The seminar had its origins in an Inquiry into the Box Flat Disaster and one of the conclusions from this Inquiry was that there should be a better dissemination of technical knowledge and the res

    Jan 1, 1973

  • AUSIMM
    Features of Bougainville Copper LimitedÆs Concentration Water Supply System

    The problems of the as-built water supply system are discussed. Recent modifications to the collection dams and the water cleaning station using wedge wire screens to resolve these problems are ou

    Jan 1, 1978

  • AUSIMM
    Designing and Operating Backfill Systems on a South African Gold Mine

    For effective backfilling, a system with the 13 features covered under the section: effective backfill systems, is required. Effective backfilling cannot be done with systems that are badly designed,

    Jan 1, 1998

  • AUSIMM
    Value in Use ù Developing an Improvement Program for Success

    By M Gill, A Mathias

    The mining industry has always been cost-focussed but in recent times mining companies have moved towards obtaining a competitive advantage through the implementation and sustainability of best practi

    Jan 1, 2004

  • AUSIMM
    Tracking Coal Fragmentation from Pit Face to Plant Feed

    By Thornton D, Firth B, Kojovic T, Brien G, O&apos

    Coal fragmentation is a function of coal type and mining process. Each unit step in the mining, handling and crushing chain of coal imparts energy to the material and impacts on size degradation and

    Jan 1, 1998

  • AUSIMM
    The Application of Accurate Delays in Open Pit Blasting Operations

    The effect of accurate detonator delay timing on blast results can now be studied with the development of the ICI Electronic Detonator. This detonator has an accuracy and precision orders of magnitu

    Jan 1, 1989

  • AUSIMM
    The Geology and Genesis of High-Grade Hematite Iron Ore Deposits

    By J Mukhopadhyay, J Gutzmer

    Most world-class high-grade (60 - 67 wt per cent Fe) hematite iron ore deposits are the product of enrichment of Precambrian iron-formations but processes responsible for enrichment are still unclear.

    Jan 1, 2002

  • AUSIMM
    The Main Hydrogeological Characteristics of Mineral Deposits in China

    It is very apparent that the hydrogeotogicat characteristics of mineral deposits in China be dominated by meteoric factors, terrain factors and the kind of karstic aquifers as a main source threaten

    Jan 1, 1988

  • AUSIMM
    Australian Longwall Geomechanics - A Recent Study

    By Stewart A. M, Price D

    This paper presents recent findings concerning longwall caving mechanisms relating to Australian mining conditions and their effect upon longwall support requirements and behaviour. The findings ar

    Jan 1, 1992

  • AUSIMM
    Tonnes, Grade and Economics - The ZC Mine Experience 1985-1988

    From the mid-1970s ZC Mines at Broken Hill had a policy to increase ore production rates at progressively lower head grades. In the mid-1980s the mine suffered crippling losses at a time of low metal

    Jan 1, 1990