Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Corrosion behaviour of ferrite and aluminate refractories in cryolitealuminium meltsBy M A. Rhamdhani, R Z. Mukhlis
Removing the ledge formation in the Hall-Heroult cell during the electrolysis process may significantly reduce the energy requirement of the aluminium production process. In the absence of the ledge,
Aug 21, 2024
-
Advanced Mill Relining - A Key Operational Control (Not Simply a 'Must Do' Maintenance Function)RME has a vision for a new grinding plant operational paradigm made possible by RMEÆs fast, safe Mill Relining System. Some new liner designs can degrade SAG mill performance because of mill volume lo
Jan 1, 2007
-
Paper No. 185. Presidential Address. Statistics And Economics.GENTLEMEN, I have to thank you very much for the honour you have conferred upon me by electing me President of the Institute for this year. On behalf of resident members, I have to offer the visitors
Jan 1, 1911
-
Integration of Mine Planning with Groundwater Modelling to Optimise Mine Closure Plans at the Marillana Creek (Yandi) MineBy K Rozlapa, P Waters, H Middlemis
A major challenge for closure planning at mining operations below the water table is evaporation from final void pit lakes and concentration of salts, which can impact on downstream groundwater (and s
Jan 1, 2006
-
Philex Gold Philippines, Inc's Bulawan Mine - The Philippines Largest Primary Gold ProducerBy Anievas JB, Sevillano AC
This paper describes the acquisition, exploration, development, initial operation and subsequent financing of the Bulawan mine by means of a listing on the Toronto Stock Exchange of a subsidiary of th
Jan 1, 1997
-
Understanding Mineralisation Controls – A Case Study of the Chesney DepositBy J Channell, G Phillips
"The Chesney deposit, located 4 km south-east of Cobar consists of three copper-gold rich shoots that lie within a larger, copper dominant lode. A fourth gold rich shoot is located adjacent to the mai
Aug 18, 2014
-
Northside Storage Tunnel ProjectBy R J. Cuttler
In January 1998 Sydney Water Corporation formed an Alliance with construction contractor Transfield, and engineering consultants Connell Wagner and Montgomery Watson, to design and construct the North
Jan 1, 1999
-
Mine Pit Slope Geotechnical DesignMine pit slopes in the Pacific Rim are a geotechnical challenge because of the complex geology in which they are developed. Mines are currently being fast-tracked to meet the increase in commodity pri
Jan 1, 2006
-
Sublevel Cave Drop Down Strategy at Perseverance Mine, Leinster Nickel OperationsBy P A. Jenkins, I W. O Jones
WMC has mined the Perseverance disseminated orebody exclusively by SLC (sublevel cave) methods. Deteriorating ground conditions in the vicinity of an orebody inflection forced a re-evaluation of futur
Jan 1, 2000
-
Modelling Mine Sustainability - Indicators Based on a Comprehensible FrameworkBy A Lyon
The minerals industry, as many other industries, has a wealth of indicators and a thriving æindustryÆ in their development, measurement and reporting. It is natural for this to occur for a new endeavo
Jan 1, 2009
-
Gold Rank Indicators - Exploration to AcquisitionBy Robinson T
The paper describes a spreadsheet system that enables selection of projects and companies that meet the user's corporate exploration and/or acquisition philosophy. A regularly maintained commer
Jan 1, 1988
-
Controls on Disseminated Gold Mineralisation at Fosterville, Victoria, AustraliaThe Fosterville Goldfield has a modest past production (0.3 Moz), but is now emerging as a significant goldfield (2.6 Moz resources, including 1.1 Moz reserves) with implications for exploration withi
Jan 1, 2005
-
Challenges in achieving zero harm – lessons from past incidents in miningBy K M. Cook, D Clark
Fatality prevention and zero harm are key focus areas for resource companies. However, they remain an ongoing challenge for high hazard industries, including the mining sector. As one example the late
Apr 16, 2024
-
Brisbane Airport Link Project – Design and Construction of the 26 m Span Kedron Caverns: Comparing Monitoring Data with the DesignBy I Coombes, M Trim, Y Sun, M McRae, A Spiegl, H Lagger, A Amon, P Barraclough, M Villeneuve
The Brisbane Airport Link Project (AirportlinkM7) includes the design and construction of more than 12.5 km of tunnels, with the Kedron interchange including four ramp tunnels that intersect with main
Sep 17, 2014
-
Learning from and managing a significant saprolite instabilityBy M Bouare, C Holland, K N’Diaye
Two adjacent open pits in Mali hosted by deeply weathered saprolitic materials were mined consecutively over the course of approximately 12 months. During excavation, both pits experienced significant
Jun 22, 2022
-
How innovation trumps isolation, one mine at a timeBy J Pearce, R Ramanathan
hortly after the World Health Organization declared COVID-19 a pandemic, the words ‘social distancing’ entered the global lexicon. The effects on the public of social distancing, lockdowns and travel
Jun 22, 2022
-
An Approach to the Development of Technological Flowsheets for Raw Material Beneficiation Using New Flotation Reagent SystemsBy Dendyuk TV
The possible use of combined (flotation/magnetic separation and magnetic separation/flotation) technologies involving the new flotation reagent systems for upgrading the iron ore concentrates, low g
Jan 1, 1993
-
Description of New Plant at South Mine, Broken HillBy Cunningham J. C
JUST prior to the war the Broken Hill South Ltd: raised, on the average, 6628 tons of ore per week, all of which was crushed and treated in the 4-section gravity mill and the slime flotation plant, fo
Jan 1, 1921
-
Environment Effluent Control at RoseberryComparatively recent Tasmanian legisla tion established a series of rigid control standards for environmental protection just as ma spectacular expansion of the mining industry was nearing completi
Jan 1, 1977
-
Cut-off Grade-based Sublevel Stope Mine Optimisation – Introduction and Evaluation of an Optimisation Approach and Method for Grade Risk QuantificationBy M W. N Buxton, M T. Bootsma, J Benndorf, C Alford
Research in the field of cut-off grade optimisation has shown a relationship between cut-off grade, project life and net present value (NPV). Lane’s theory demonstrates that cut-off grades can be opti
Nov 24, 2014