    Optimization of Capital Cost and Smelter Revenue - Integrated Team Rebuild of Barro Alto Furnaces

    By K Belanger, J. Mclachlan, F. Stober, G. Norval, B. Snider, A. Munsch, T. Koehler, E. Piantino, J. Carlos Queiroz

    The project to rebuild the smelting furnaces at the Anglo American - Barro Alto ferronickel smelter, located in Goias, Brasil, was initiated in September 2013. To optimize the capital cost, while maxi

    Jan 1, 2015

  • NIOSH
    RI 4288 Flood-Prevention Projects at Pennsylvania Anthracite Mines Progress Report for Fiscal Year Ended June 30, 1947

    By W. E. Cassan, W. L. Eaton, James Westfield, W. M. Romisher, Karl Hughes, S. H. Ash

    "INTRODUCTION Funds were made available to the Bureau of Mines, United States Department of the Interior, for anthracite investigations during the fiscal year ended June 30, 1945. One of the approved

    Apr 1, 1948

  • AUSIMM
    Design of Reinforced Concrete Chimney at Yallourn Briquetting Works

    THE Yallourn chimney has aroused interest, as it is, for the time being, the tallest structural erection in Australia. Its height was not decided on, however, with the object of breaking records, but

    Jan 1, 1924

  • NIOSH
    OFR-76(3)-75 Mine Electrical Systems Evaluation - Transient Analysis - Introduction

    By Robert Stefanko

    Transients are results of sudden changes which take place in power systems and can be created by the opening and closing of switches and circuit breakers or the occurrence of a fault anywhere in the c

    Jan 1, 1974

  • CIM
    How the Mining Industry is Responding to Pressures for Change in the Management of Mine Waste

    By Don Welch

    Pressures for change ?Land use constraints ?Project financing ?Local communities ?Environmental issues ?Sustainability requirements ?Stricter regulatory procedures ?Technical excellence ?Reduc

    May 1, 2010

  • DFI
    Helical Pile Foundation Anchors As A Practical Alternative

    By Dilip Khatri

    Helical pile anchors have gained acceptance over the past sixty years. Most recently they have been commonplace in the 20th century for the power utility industry in anchoring transmission towers, equ

    Jan 1, 2003

  • SME
    Vibrant exhibit floor reflects recovering industry

    It had been more than a decade since this many booths were occupied at an SME Annual Meeting, but at the 2010 meeting in Phoenix, AZ 630 booths were sold to 470 vendors from the entire spectrum of the

    May 1, 2010

  • SME-ICGCM
    Pre-mining stresses at some hard rock mines in the Canadian Shield (2c76bca0-8dd2-4a44-bc9b-85524b3514cf)

    By B. Arjang

    ABSTRACT: Ground stresses are one of the significant factors in the context of rockbursts and underground instability at some hard rock mines in Canada. Overcoring strain relief measurements using tri

    Jan 1, 1989

  • NIOSH
    IC 6937 Mining And Milling Methods And Costs At The Glass-Sand Plant Of P. J. Weisel, Inc., Corona, Calif. ? Introduction

    By Edmund Shaw

    This paper is one of a series being prepared by the United states Bureau of Mines describing mining and milling methods and costs at industrial mineral plants throughout the United states. These paper

    Jan 1, 1937

  • CIM
    Rabbit Lake project – environmental impact

    By R. L. J. Phillips

    "The environmental impact of the Rabbit Lake project is presented. Baseline data for fish, water, air and radon collected in 1973, 1975, 1980and 1986, are compared with post-development environmental

    Jan 1, 1989

  • IMPC
    Drivers And Barriers In The Supply Chain ? The Importance Of Understanding The Complexity Of Recycling In The Industrial System

    By N. Pajunen

    The basic objectives of current EU waste policy are to prevent waste and promote re-use, recycling and recovery to reduce negative environmental impact (2008/98/EC). In this paper, we focus on drivers

    Sep 1, 2012

  • SME
    Developing a Virtual Reality Environment for Mining Research

    By J. Navoyski, B. Macdonald, W. J. Helfrich, J. L. Bellanca, B. Demich

    DISCLAIMER The findings and conclusions in this paper are those of the authors and do not necessarily represent the official position of the National Institute for Occupational Safety and Health, Cen

    Jan 1, 2019

  • NIOSH
    IC 7835 Shaft-Sinking Methods And Costs At The T. L. Shaft, Eureka Corp., Ltd., Eureka, Nev. ? Summary

    By A. C. Johnson

    The T. L. shaft of the Eureka Corp., Ltd., near Adams Hill, Eureka, Nev., was sunk in 1954 and 1955 to permit exploration and development of the lead-zinc-silver ore that had been indicated by drillin

    Jan 1, 1958

  • AUSIMM
    Feasibility Studies, EPCM and the Environment ù Case Studies in Integrated Mine Development

    By R Aseervatham

    The fast tracked mine development strategy attempts to blend feasibility studies and engineering/commissioning functions into a streamlined process. In this compressed process, environmental issues ar

    Jan 1, 1999

  • NIOSH
    Bulletin 136 Deterioration in the Heating Value of Coal During Storage

    By Horace C. Porter, F. K. OVITZ

    Much has been written of the changes undergone by coal in storage and the deterioration of coal through exposure to the weather. In order to obtain definite information for the benefit of the Governme

    Jan 1, 1917

  • AUSIMM
    Delivering a healthy atmosphere underground in a cost-conscious environment

    By D Reid, J Black

    The adverse health impacts from diesel particulate matter (DPM) exposure are a well-known global concern. The building evidence has triggered underground mining operations to review existing atmospher

    Aug 28, 2017

  • AUSIMM
    Geometric Control for Strategic Mine Planning at El Teniente Mine

    By J Cornejo, A Pinochet, C Caviedes

    The ore extraction rate and the incorporation of new areas are key operational parameters. In massive deposits mined by caving techniques they both control the cave back geometry, which is mostly resp

    May 9, 2016

  • NIOSH
    IC 6962 Mining And Grinding Methods And Costs At The Malvern Clay Co. Mine, Malvern, Ohio ? Introduction

    By E. J. Lintner

    This paper is one of a series being prepared by the United States Bureau of Mines describing clay mining, crushing, and grinding methods and costs at various operations throughout the United States. T

    Jan 1, 1937

  • SME-ICGCM
    Design and Performance of a Longwall Coal Mine Water-Barrier Pillar

    By Francis Kendorski

    The Skyline #3 Mine of Canyon Fuel Company in Utah was planning longwall mine development adjacent to and downdip of older mine workings known to be flooded. Barrier pillar geometries and widths were

    Jan 1, 2007

  • SME
    Slurry pipelines for Egypt and Sudan

    By Baha Abulnaga

    Slurry pipelines are used in a number of countries to convey processed ore mixed with water over long distances from remote mine sites to ports or plants for further processing. In Egypt and Sudan,

    Jan 3, 2010