Search Documents

  • NIOSH
    Introduction - The Mission (85814226-4440-4427-874a-f47ca8e121f0)

    Endless lines at service station gasoline pumps, limited travel at reduced speeds, thermostats set at an uncozy sixty-eight degrees in the dead of winter-these are but a few of the inconveniences and

    Jan 1, 1974

  • DFI
    General Reports - Session 1 - General Report- Deep Excavations "He Who Pays The Piper Calls The Tune"

    By Tim Chapman

    This general report considers what promoters of deep basement projects want from their teams and whether they get it often enough. Most large projects are based on complex financial models where the f

    Jan 1, 2006

  • NIOSH
    IC 8477 Socioeconomic Aspects Of Mining In Selected Cities - Urbanization And Surface Mining, Atlanta, Ga.

    By R. R. French

    The industrial minerals industry in the Atlanta, Ga., area was studied in order to better understand problems associated with exploiting mineral resources in and near metropolitan areas. A method for

    Jan 1, 1970

  • SME
    Epidemiology: a tool for risk analysis of mine injuries - SME Transactions 2011

    By Ashis Bhattacherjee, Bijay Mihir Kunar

    A literature review on quantitative analysis of mine safety studies revealed that investigators use a wide range of statistical techniques for the analysis of mine injury data. Researchers have addres

    Jan 1, 2011

  • CIM
    The Baie Comeau Quartzite Deposit and Its Importance as an Industrial Mineral Reserve

    By L. Juteau

    """The north coast of the St. Lawrence River will be the scene of an industrial development during the coming decades"". The facts which underlie this statement are the occurrences of iron and titaniu

    Jan 1, 1971

  • NIOSH
    IC 7328 Hazards Of The Trolley-Locomotive Haulage System In Coal Mines ? Introduction

    By D. Harrington

    The greatly extended use of the underground trolley-locomotive system for hauling coal without doubt was one of the most important factors in the rapid progress of coal mining and the increased produc

    Jan 1, 1945

  • AUSIMM
    Biogeochemical Prospecting for Zinc and Lead in the Te Aroha Region of New Zealand

    The uptake of zinc, lead, and copper by the flora of the Tui Base Mine area near Te Aroha is described.Vegetation and soil samples were taken from two traverses across the Raukaka Lode. Results. after

    Jan 1, 1969

  • CIM
    The OECD Steel Industry -with emphasis on Europe

    By G. E. Wittur

    "The twenty-one members of the Organization for Economic Cooperation and Development, comprising eighteen western European nations plus Canada, the United States and Japan. account for two-thirds of w

    Jan 1, 1967

  • SME
    Industrial Minerals Review 2012

    Editor?s note: Each year, Mining Engineering features an industrial minerals review. Several people put in a fair amount of time in developing the material for this issue, all the while doing their ow

    Jul 1, 2013

  • ABM
    New Danjoint High Performance Oil Lubricated Gear Spindles For Essar Steel Algoma’s

    By Andrea Codutti, Gianni Tiussi, Andrea Tonnicchi, Morris Codarin

    Essar Algoma Steel, Canada, awarded Danieli Transimissions a strategic order for the upgrade of the main drive spindles belonging to the most loaded stands of the Hot Strip Mill, F1-F2, F5 and F6. Fea

    Oct 1, 2019

  • NIOSH
    OFR-89-75 The Application Of Boring Machines To The Production Of Steeply Pitching Anthracite Coal ? Executive Summary

    By James H. Cobbs

    The purpose of this study is to investigate the application of boring equipment to the production of anthracite coal from steeply pitching beds. Both raise boring and augering equipment were considere

    Jan 1, 1975

  • AUSIMM
    Characteristics, Timing and Formation of Diatreme Breccias at the Kelian Gold Deposit, East Kalimantan, Indonesia

    By J B. Gemmell, D R. Cooke

    Recent mapping at the Kelian epithermal gold deposit in East Kalimantan, Indonesia has delineated intrusive and extrusive-phreatomagmatic breccias, their magmatic roots, and late-stage endogenous dome

    Jan 1, 1999

  • SAIMM
    Geotechnical Investigation Of Decline Shaft Portals

    By R. A. Puchner

    The location of a decline shaft portal can have far reaching implications if the geotechnical conditions are not suited for safe and cost effective excavation. Ideally the portal should be positioned

    Jan 1, 2009

  • SAIMM
    Geotechnical Investigation Of Decline Shaft Portals (98716578-d9a6-4b5f-b3d0-51b497360883)

    By R. A. Puchner

    The location of a decline shaft portal can have far reaching implications if the geotechnical conditions are not suited for safe and cost effective excavation. Ideally the portal should be positioned

    Jan 1, 2009

  • NIOSH
    Mineral Indicators - Aluminum: (112ce05f-d267-41e6-9380-68deb1f3ab87)

    Since March 28, domestic producer prices on 99.5 percent aluminum ingot have been at 5l¢ per pound. Dealers in this same time frame have held ingot quotes at 49¢-50.5¢ per pound. COBALT: Imports f

    Jan 1, 1977

  • NIOSH
    OFR-35-88 Prediction Of Incipient Electrical-Component Failures

    By Jeffery L. Kohler

    This final report on Bureau of Mines Contract J0338028 presents the results of a research effort to predict incipient failure in electric-power-system components. The development of continuous monitor

    Jan 1, 1987

  • CIM
    Stirred Milling at Anglo American Platinum

    By Chris Rule

    This paper tells the story of the rapid commercial application of stirred milling technology at Anglo American Platinum?s many Concentrators. The first stirred mill ? a 10 000 litre IsaMillTM; the lar

    Jan 1, 2012

  • SME
    Evaluation of Whole‑Body Vibration Exposure of Dozer Operators, a Task‑Based Approach

    By Bülent Erdem, Zekeriya Duran, Tuğba Doğan

    The objective of this study was to evaluate the potential health risk associated with exposure of dozer operators to whole-body vibration. Measurements were made on 31 dozers used in different surface

    Jun 16, 2022

  • AUSIMM
    E26 Lift 1 North block cave development and construction

    By R Cunningham

    The E26 Lift 1 North Project took 37 months from the approval on 1st January 2019 to the commencement of production on 1st March 2022. This was five months ahead of the feasibility plan. When compared

    Mar 29, 2023

  • NIOSH
    IC 6546 Safety At The Old Dominion Copper Mine, Globe, Ariz.

    By R. I. C. Manning

    The Old Dominion Co, at Globe, Ariz., like the: Phelps Dodge Corporation with which it is closely allied, considers safety a major operating problem. Safety is fostered by this company in consideratio

    Jan 1, 1931