Search Documents

  • SME
    Geotechnical And Structural Design Challenges Of The Fremont Central PARK Subway For The Bart WARM Springs Extension

    By Mitchell L. Fong

    The Bay Area Rapid Transit (BART) District will be extending BART service south along an 8.7-km (5.4-mile) -long corridor in the city of Fremont, California as part of the Warm Springs Extension (WSX)

  • IOM3
    Current status of determination of mineralogical balances for platinum-group element-bearing ores

    By L. J. Cabri

    Although no complete mineralogical balances have been published, the background knowledge and proven, highly sensitive analytical techniques to produce them already exist. For PGE-Cu-Ni sulphide ores

    Apr 1, 1994

  • SAIMM
    Orapa 3 Plant Conceptual Design Evolution In Action (Let The Ore Dictate The Plant That You Build!!)

    By G. Popplewel

    Commencing with the Pre-Feasibility Study (PFS) conclusions, the Orapa 3 process design evolved through a phase of value-engineering studies. An overall re-evaluation of the originally proposed proces

    Jan 1, 2010

  • SAIMM
    Modelling and Determining the Technical Efficiency of a Surface Coal Mine Supply Chain

    By M. D. Budeba

    Determining the efficiency of a surface coal mine operation is an essential activity, which can help in deciding on the optimal use of input resources, including effective capital allocation, in gener

    Jan 1, 2014

  • AUSIMM
    The Production of Nuclear Grade Uranium Dioxide Powders From Australian Ores (7b2536c4-12d9-4a3b-abac-9212e2d5236f)

    Most types of nuclear power reactors use uranium dioxide fuel. Power reactors using natural uranium dioxide fuel are of special interest to countries such as Australia that have their own uranium supp

    Jan 1, 1970

  • AUSIMM
    Use of Optimal Techniques to Minimize Moisture Retention in Fine Coal Filtration

    The importance of reducing the moisture content of fine coal, the nature of the retained water, and the means of its removal are discussed. A statistical technique, using a balanced block design, was

    Jan 1, 1970

  • IOM3
    Risk assessment of surface structural damage due to mining subsidence: an integrated computer-based approach

    By R. K. Dunham, D. J. Reddish, X. L. Yao

    Paper presented at the conference: Risk assessment in the extractive industries, held in Exeter, UK, 23-24 March 1994, and first published London: IMM, 1994, preprint volume, 10pp., 10 refs. The integ

    Dec 1, 1995

  • SAIMM
    The Upgrading Of An Inferior Grade Zircon To Superior Opacifier For Sanitary Ware And Glazes

    By E. Snyders

    The upgrading process of an inferior grade of zircon to a superior opacifier for ceramic applications was investigated. A calcining process in the presence of mineralizers was used to produce the prod

    Jan 1, 2005

  • SAIMM
    A Perspective On The Supply And Utilization Of Mining Graduates In The South African Context - Synopsis

    By C. Musingwini

    The South African mining industry continues to be a major source of employment at a time when at least 25 per cent of the working age population is unemployed. At the same time the industry faces a sk

    Jan 1, 2013

  • SME
    Field tests of second generation proximity detection systems on continuous miners

    By Jeffrey A. Yonkey, Timothy J. Lutz, Jacob L. Carr, Christopher C. Jobes

    "Since 1984, there have been 39 fatalities involving striking and pinning of the operator and other workers by the continuous mining machine (CMM). In January 2015, the U.S. Mine Safety and Health Adm

    Jan 1, 2014

  • SME
    Role Of The Mill In A Competitive Minerals Company - Is Low Cost Enough?

    By Bruce Cavender

    Historically, the processing function has been regarded as efficiently managed as long as production costs were kept low, recovery was adequate and sufficient plant capacity was avail-able. In this pa

    Jan 1, 2008

  • AUSIMM
    Robotic Hang-up Assessment and Removal of Rock Blockages in Mining Operations Using Virtual Reality for Safety

    By G Baiden

    The removal of rock blockages in mining operations has long been a risky undertaking, especially in high overhead conditions. Moreover, the assessment of where to put charges and the placement of them

    May 9, 2016

  • CIM
    Numerical Analysis of the Early Response of Paste Backfill in a Vertical Stope

    By N. E. Mkadmi

    Backfilling increases the stability of underground stopes and may help reduce the environmental footprint from the mining operation. The barricades holding the backfill in place must be designed to pr

    May 1, 2011

  • NIOSH
    RI 8972 - Field Measurement and Finite-Element Modeling of Circular and Rectangular Shaft Shapes in the Coeur d'Alene Mining District, Idaho

    By Michael J. Beus

    This Bureau of Mines report describes a field experiment involving the sinking of two test shafts to directly compare the deformational behavior of circular and rectangular shapes. Results show that t

    Jan 1, 1985

  • CIM
    Mining for Space Why now?

    By Michel Doyon

    Canadian Context: Exploration ??Space Exploration is within the unique mandate of the Canadian Space Agency ??Global partnerships ??Maintain close relationship with our partners ??New knowledge

    May 1, 2009

  • SME
    Repairs and Modifications to the Providence Water 2.3 m ID Scituate Aqueduct and Tunnel

    By David Belknap, Clay Haynes, David Egger

    Rehabilitation challenges were met nearly two months ahead of contract schedule for the Design-Build, Fast Track Scituate Aqueduct & Tunnel project in Cranston, Rhode Island. The aqueduct and tunnel w

    Jan 1, 2005

  • SAIMM
    Strategic and tactical requirements of a mining long-term plan

    By B. J. Kloppers, J. V. Z. Visser, C. J. Horn

    "The long-term plan (LTP) in a mineral resource company is defined by the quality of the mineral resource and represents the result of a series of trade-offs to fulfil internal organizational as well

    Jan 1, 2015

  • DFI
    Reducing Construction Interference when Implementing Geotechnical Instrumentation and Monitoring in Urban Excavation Projects

    By Martin B. Hudson, Daniel Brescia, Zhangwei Ning

    Due to the complexity and sensitivity of surrounding environments, instrumentation and monitoring (I&M) is critical for many urban deep excavations. The objects to be monitored include shoring bulkhea

    Jan 1, 2018

  • AUSIMM
    Laboratory Testing of Cemented Rock Fill for Open Stope Support

    By H Saw, M Cordova

    Cemented rock fill (CRF) is often used to support open stope voids. This allows for the full recovery of ore while achieving global mine stability. In such cases, the exposed CRF masses require adequa

    May 9, 2016

  • SME
    Tribute To J. Robert Woolsey

    By Michael Cruickshank

    Bob Woolsey was born in 1936 in the state of Georgia and grew up to be a man of great integrity, vitality, wisdom and charm, totally neutral on matters of race, gender, and religion. A true Southern G

    Jan 1, 2008