Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Optimization of Capital Cost and Smelter Revenue - Integrated Team Rebuild of Barro Alto FurnacesBy K Belanger, J. Mclachlan, F. Stober, G. Norval, B. Snider, A. Munsch, T. Koehler, E. Piantino, J. Carlos Queiroz
The project to rebuild the smelting furnaces at the Anglo American - Barro Alto ferronickel smelter, located in Goias, Brasil, was initiated in September 2013. To optimize the capital cost, while maxi
Jan 1, 2015
-
RI 4288 Flood-Prevention Projects at Pennsylvania Anthracite Mines Progress Report for Fiscal Year Ended June 30, 1947By W. E. Cassan, W. L. Eaton, James Westfield, W. M. Romisher, Karl Hughes, S. H. Ash
"INTRODUCTION Funds were made available to the Bureau of Mines, United States Department of the Interior, for anthracite investigations during the fiscal year ended June 30, 1945. One of the approved
Apr 1, 1948
-
Design of Reinforced Concrete Chimney at Yallourn Briquetting WorksTHE Yallourn chimney has aroused interest, as it is, for the time being, the tallest structural erection in Australia. Its height was not decided on, however, with the object of breaking records, but
Jan 1, 1924
-
OFR-76(3)-75 Mine Electrical Systems Evaluation - Transient Analysis - IntroductionBy Robert Stefanko
Transients are results of sudden changes which take place in power systems and can be created by the opening and closing of switches and circuit breakers or the occurrence of a fault anywhere in the c
Jan 1, 1974
-
How the Mining Industry is Responding to Pressures for Change in the Management of Mine WasteBy Don Welch
Pressures for change ?Land use constraints ?Project financing ?Local communities ?Environmental issues ?Sustainability requirements ?Stricter regulatory procedures ?Technical excellence ?Reduc
May 1, 2010
-
Helical Pile Foundation Anchors As A Practical AlternativeBy Dilip Khatri
Helical pile anchors have gained acceptance over the past sixty years. Most recently they have been commonplace in the 20th century for the power utility industry in anchoring transmission towers, equ
Jan 1, 2003
-
Vibrant exhibit floor reflects recovering industryIt had been more than a decade since this many booths were occupied at an SME Annual Meeting, but at the 2010 meeting in Phoenix, AZ 630 booths were sold to 470 vendors from the entire spectrum of the
May 1, 2010
-
Pre-mining stresses at some hard rock mines in the Canadian Shield (2c76bca0-8dd2-4a44-bc9b-85524b3514cf)By B. Arjang
ABSTRACT: Ground stresses are one of the significant factors in the context of rockbursts and underground instability at some hard rock mines in Canada. Overcoring strain relief measurements using tri
Jan 1, 1989
-
IC 6937 Mining And Milling Methods And Costs At The Glass-Sand Plant Of P. J. Weisel, Inc., Corona, Calif. ? IntroductionBy Edmund Shaw
This paper is one of a series being prepared by the United states Bureau of Mines describing mining and milling methods and costs at industrial mineral plants throughout the United states. These paper
Jan 1, 1937
-
Rabbit Lake project – environmental impactBy R. L. J. Phillips
"The environmental impact of the Rabbit Lake project is presented. Baseline data for fish, water, air and radon collected in 1973, 1975, 1980and 1986, are compared with post-development environmental
Jan 1, 1989
-
Drivers And Barriers In The Supply Chain ? The Importance Of Understanding The Complexity Of Recycling In The Industrial SystemBy N. Pajunen
The basic objectives of current EU waste policy are to prevent waste and promote re-use, recycling and recovery to reduce negative environmental impact (2008/98/EC). In this paper, we focus on drivers
Sep 1, 2012
-
Developing a Virtual Reality Environment for Mining ResearchBy J. Navoyski, B. Macdonald, W. J. Helfrich, J. L. Bellanca, B. Demich
DISCLAIMER The findings and conclusions in this paper are those of the authors and do not necessarily represent the official position of the National Institute for Occupational Safety and Health, Cen
Jan 1, 2019
-
IC 7835 Shaft-Sinking Methods And Costs At The T. L. Shaft, Eureka Corp., Ltd., Eureka, Nev. ? SummaryBy A. C. Johnson
The T. L. shaft of the Eureka Corp., Ltd., near Adams Hill, Eureka, Nev., was sunk in 1954 and 1955 to permit exploration and development of the lead-zinc-silver ore that had been indicated by drillin
Jan 1, 1958
-
Feasibility Studies, EPCM and the Environment ù Case Studies in Integrated Mine DevelopmentBy R Aseervatham
The fast tracked mine development strategy attempts to blend feasibility studies and engineering/commissioning functions into a streamlined process. In this compressed process, environmental issues ar
Jan 1, 1999
-
Bulletin 136 Deterioration in the Heating Value of Coal During StorageBy Horace C. Porter, F. K. OVITZ
Much has been written of the changes undergone by coal in storage and the deterioration of coal through exposure to the weather. In order to obtain definite information for the benefit of the Governme
Jan 1, 1917
-
Delivering a healthy atmosphere underground in a cost-conscious environmentBy D Reid, J Black
The adverse health impacts from diesel particulate matter (DPM) exposure are a well-known global concern. The building evidence has triggered underground mining operations to review existing atmospher
Aug 28, 2017
-
Geometric Control for Strategic Mine Planning at El Teniente MineBy J Cornejo, A Pinochet, C Caviedes
The ore extraction rate and the incorporation of new areas are key operational parameters. In massive deposits mined by caving techniques they both control the cave back geometry, which is mostly resp
May 9, 2016
-
IC 6962 Mining And Grinding Methods And Costs At The Malvern Clay Co. Mine, Malvern, Ohio ? IntroductionBy E. J. Lintner
This paper is one of a series being prepared by the United States Bureau of Mines describing clay mining, crushing, and grinding methods and costs at various operations throughout the United States. T
Jan 1, 1937
-
Design and Performance of a Longwall Coal Mine Water-Barrier PillarBy Francis Kendorski
The Skyline #3 Mine of Canyon Fuel Company in Utah was planning longwall mine development adjacent to and downdip of older mine workings known to be flooded. Barrier pillar geometries and widths were
Jan 1, 2007
-
Slurry pipelines for Egypt and SudanBy Baha Abulnaga
Slurry pipelines are used in a number of countries to convey processed ore mixed with water over long distances from remote mine sites to ports or plants for further processing. In Egypt and Sudan,
Jan 3, 2010