Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Surface Auger Mining At Rietspruit Mine Services (Pty) Ltd
By M. J. Lukhele
Paper written on project work carried out in partial fulfilment of B. Tech (Mining Engineering) degree A number of high wall mining methods were developed over the years to mine coal reserves expos
Jan 1, 2002
-
Lessons For The Future: The Origins And Legacy Of COMRO?s Hydraulic Technology Programme
By T. E. Pogue
This paper traces the co-operative initiative undertaken by South Africa?s gold mining companies through the Chamber of Mines Research Organization (COMRO) in development of hydraulic technologies. Af
Jan 1, 2006
-
The Role Of The Independent Technical Audit In Raising Finance
By J. R. Cole-Baker
An independent technical audit by a consultant is part of the accountability process of publicly owned or publicly quoted companies when raising finance through share issues or loans or the sale of eq
Jan 1, 1998
-
Current South African Coal Pillar Research
By B. J. Madden
Over 206 million tons of hard coal were mined in South African collieries in 1996. Some 132.5 millions tons came from underground operations and approximately 120 million tons came from bord-and-pilla
Jan 1, 1998
-
South Africa's Ferro Alloys Industry - Present Status And Future Outlook
By T. R. Curr, W. A. Gericke, J. Basson
South Africa is a leading player in the international ferro alloys industry. Historical factors that have contributed to this dominant position include an abundance of natural resources and relatively
Jan 1, 2007
-
Characterization Of The Leaching Properties Of A Uranium Leaching Pulp
By J. Roodt
Paper written on project work carried out in partial fulfilment of B. Eng (Metallurgical Engineering) degree This work was done to characterize the leaching of a uranium containing pulp processed b
Jan 1, 2003
-
Numerical Modelling Of The Yielding Of A Stabilizing Pillar/Foundation System And A New Design Consideration For Stabilizing Pillar Foundations
Following a short review of selected literature, a back analysis of stress measurements of stress regeneration in a closed mini-longwall is shown. The agreement is good, lending confidence to the para
Jan 1, 1998
-
Analysis Of Surface Modification On Coal Pyrite
By H. Zhu
Coal desulphurization by flotation is often difficult due to the surface oxidation of coal pyrite. Scanning electron microscope (SEM) and X-ray diffraction (XRD) were adopted to obtain detailed inform
Jan 1, 2002
-
Contract—A tool for evaluating mining contracts
By D. McCarthy
Contract is a PC-based software program designed to satisfy the main features that have been identified to be lacking from cost estimation systems currently in place in the Australian coal industry. C
Jan 1, 2003
-
A Mathematical Model Of Laser Surface Heat-Cooling Treatment For Medium Carbon Steel - Synopsis
By I. Fedotov
One of the most effective methods of metal surface heat treatment is through laser hardening. In most cases, laser parameters are determined experimentally, which is expensive and time-consuming. A ma
Jan 1, 2011
-
Trithiocarbonates For PGM Flotation (18e369b0-b921-4efe-bc90-4944b671f393)
By C. F. Vos
Small replacements of C12-trithiocarbonate (C12-TTC) for dithiocarbonate (DTC)/dithiophosphate (DTP) in a reagent suite for the flotation of platinum group metals (PGM) have significantly improved the
Jan 1, 2007
-
Keynote Address: Population And Poverty, Energy And Technology: Coal, Mining And A Proper Start For The Century
By R. L. Lawson
I?ve been asked to appraise the global role of coal and mining, and the best place I can think of to begin is with the World watch Institute, which purports to monitor all things global. Last fall the
Jan 1, 2001
-
Case Study Of The Rockpass System At Kloof No. 3 Shaft
By R. Hart
In this paper, problems that have been experienced with the rockpass system at Kloof Mine No. 3 Shaft are described. Actions that have been taken to overcome the problems are also described. These inc
Jan 1, 2006
-
Ore Pass Rehabilitation - Case Studies From Impala Platinum Limited
By L. J. Gardner
Ore pass systems play a critical role in moving broken rock from the workplace to surface, and the integrity of the ore pass excavations is crucial. Over the life of the mine, ore pass integrity deter
Jan 1, 2006
-
Engineering application of thrust block analysis in slope stability problems in open pit mines - Synopsis
By K. N. Karparov
The classical limit equilibrium methods are suspected to be ineffective in predicting the potential for highwall failure in many instances in coal mines around the world. Slope engineers have for many
Jan 1, 2009
-
Modular Mixer-Settlers for SXPlant Sustainability
By Henri Fredriksson, Rami Saario, Mark Weatherseed, Juri Matinheikki
"The challenges facing the mining industry include complex ores and declining grades, together with increasing capital costs and environmental regulations. In addition, future commodity price uncertai
Jan 1, 2015
-
The Gender And Racial Transformation Of Mining Engineering In South Africa ? Synopsis
By J. A. Cruise
With the end of the official apartheid legislation in the early 1990s, South Africa was heralded as a non-racial country. However, racial awareness has been reintroduced into the country with the Affi
Jan 1, 2011
-
Rock bolt condition monitoring using ultrasonic guided waves - Synopsis
By B. J. Buys
Rock bolt integrity is a critical issue for the mining industry because of its influence on the safety of mining operations. Guided ultrasonic wave testing of the defects associated with resin-anchore
Jan 1, 2009
-
Problem Of Non-Normality In Statistical Quality Control: A Case Study In A Surface Mine
By B. Samanta
A quality characteristic analysed through construction of the Shewhart control chart is required to be normally distributed. In mining applications, this assumption is often violated as many quality c
Jan 1, 2004
-
A Critical Evaluation Of The Installation Equipment Of In-Stope Rock Bolts And The Effectiveness Thereof In The Merensky Stoping Areas
By G. M. J. van Heerden
Paper written on project work carried out in partial fulfilment of B. Eng (Mining Engineering) degree The Union Section of Anglo Platinum is situated ±18 km west of the town of Northam on the north
Jan 1, 2002