Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Talc Problems Encountered in the Mining and Milling of Kanichee Nickel-Copper Ore
By F. M. Makarinsky
"SynopsisThe Kanichee open pit mine and milling complex is situated approximately four air miles north-west of Ternagami, Northern Ontario, in Strathy Township. Mining and milling production commenced
Jan 1, 1975
-
Prestress and Stress Around A Redistribution 1n Mine Opening
By C. L. Emery, A. V. Corlett
"The stress equilibrium is disturbed in a body of rock by a mine opening and is restored by a redistribution of the stresses around the opening. The pattern of the redistribution of unilateral stress
Jan 1, 1959
-
The Red Dog VIP mill optimization project. Part A: Rectifying the shortage of flotation capacity
By George Hope, Brigitte Lacouture
"The Red Dog mine has increased mill throughput most years since start-up. Although flotation equipment has been added over the last 10 years, the Red Dog metallurgical performance has been restricted
Jan 1, 2003
-
Uranium mineralization in northern Saskatchewan
By R. J. Munday
Although uranium deposits in northern Saskatchewan are clustered around the Athabasca basin, basement lithostructure determines their distribution. Basal Wollaston Group pelites are invariably graphi
Jan 1, 1979
-
Investigation of Block Geometrical Properties of the Shale-Limestone Chaotic Complex bimrock of The Santa Barbara Open Pit Mine (Italy)
By N. Coli
The exhausted Santa Barbara open pit mine (Tuscany, Italy), owned by the main electric power company in Italy (ENEL S.p.A,) extracted lignite as a fuel for the Santa Barbara thermoelectric power plant
May 1, 2009
-
Geostatistical Simulation of Optimum Mining Elevations for Nickel Laterite Deposits
By J. A. McLennan
Nickel laterite deposits are typically formed from tropically weathered mafic-ultramafic complexes. The resulting nickel concentration is found within soil horizons and is mineable with regular dozer
Apr 1, 2005
-
Artificial Geo-Hydrological Zonation
By J. A. López-Molina, S. García, V. Castellanos-Pedroza
"Groundwater inflow into underground constructions may cause hazardous working conditions and environmental problems. It is essential to localize and characterize potential flow paths and to estimate
Jan 1, 2015
-
Role of Process and Logistics Simulation Modeling in Delivering Capital Effective and Operationally Efficient Solutions for RTFT
By G. Issid, J. McGinty, C. Lee, Y. Pepin
For more than a decade, Hatch has used process and logistics models to assist Rio Tinto Fer et Titane (RTFT) with capacity planning, debottlenecking, and optimization to help ensure design capability,
Jan 1, 2011
-
Silicothermic Extraction of Magnesium from Dolomite by Induction Heating
By N. K. Jaber
The "Pidgeon Process" for the extraction of magnesium from dolomite ore utilizing ferrosilicon as the reducing agent has been studied extensively by active metallurgists such Mr L,M, Pidgeon the fathe
Jan 1, 2006
-
Geotechnical Considerations for Underground Mining of the Dy Deposit, Faro, Yukon
By Nick D. Rose
The Dy deposit is a 21 Mt Pb-Zn-Ag-Au SEDEX-type massive sulphide resource located in the Anvil District, Faro, Yukon. This relatively unexplored orebody lies at a depth of 480 to 920m below surface,
May 1, 2002
-
Knelson-Deswik Milling Technology: Bridging the Gap between Low and High Speed Stirred Mills
By David Rahal, Des Erasmus, Ken Major
"Over the past twenty years there has been an increased emphasis on fine grinding in the minerals industry. This spurred the development of a range of new fine grinding equipment in the 1990s. At that
Jan 1, 2011
-
Towards Optimum Value in Underground Mine Scheduling
By Bryan M. Maybee
The scheduling of underground mining activities is a complex task, in particular because of the requirement to satisfy a large number of constraints. A Schedule Optimization Tool (SOT) for underground
May 1, 2009
-
Goldstream Concentrator Design and Operation
By Stuart McTavish
"Noranda's Goldstream mine is a 1,500 ton per day copper-zinc mine located 60 miles north of Revelstoke, B.C.The orebody which contains 3.69% Cu and 2.69% Zn was discovered in 1972. Construction of th
Jan 1, 1985
-
Review of Self-Heating Testing Methodologies
By J. E. Nesset, F. Rosenblum, J. A. Finch
"The self-heating of sulphides can be a major hazard in mining operations and concentrate handling, particularly during transportation and associated storage. Self-heating results from the oxidation o
Jan 1, 2014
-
Simulation of an Iron Ore Concentration Circuit Using Mineral Size Recovery Curves of Industrial Spirals
By Pierre Roy, Claude Gosselin, Maryam Sadeghi, Michel Bourassa, Christian Rochefort, Claude Bazin, Gautier Mahieu, François Lavoie, Marilène Renaud, David Cataford
"Spirals are gravity concentrators used for the concentration of iron oxide minerals from ores. This paper presents the mineral size recovery curves observed for spirals operating in two Canadian iron
Jan 1, 2014
-
Dynamic Management of Road Construction Operations on Site
By R. Heikkilä
Today road construction sites utilize more and more information modeling in design phases as well as model based 3-D machine control systems in site operations. For main contractor, the management and
Aug 1, 2013
-
Flotation of Base Metals from Grinding Mill Discharges
By A. J. Williams
"Conventional base metal milling practice normally consists of crushing, grinding and cyclone classification followed by flotation. It is the authors' belief that the commencement of flotation after c
Jan 1, 1984
-
Commissioning and Operating Experience with Gekko’s Gold Ore Treatment Plants
By Tim Hughes, Steve Gannon, Jennifer Abols
"In the past year, two very innovative gold ore processing plants have been designed, built and commissioned by Gekko Systems Pty Ltd. The first plant in Vietnam utilizes conventional crushing and bal
Jan 1, 2007
-
Post Start-Up Modifications to the Golden Bear Roaster
By S. McCalpine, W. Muir, P. J. Downey
"Golden Bear Operating Company Ltd. (GBOC) was a joint venture between Chevron Minerals Ltd. and North American Metals Corp. that was formed for the development of the Golden Bear Project. The mine is
Jan 1, 1992
-
Haldor Topsoe’s Catalytic Advances Result in Dramatically Lower So2 Emissions
By Patrick Polk
For many years, sulfuric acid producers all over the world have been forced to meet ever more strict environmental regulations to reduce SO2 emissions. The sulfuric acid industry has implemented new s
Jan 1, 2014