Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Comparison of One Stage and Two Stage Classification ù A Case Study

    By M N. Mian

    The Cayeli volcanogenic massive sulphide deposit is located in Black Sea region of Turkey. Cayeli Bakir Isletmeleri (CBI) was formed as a joint venture between Inmet (Canada) and Eti Holding (Turkey).

    Jan 1, 2003

  • AUSIMM
    Recent advances in understanding phosphorus in oxygen steelmaking

    By G Brooks

    The control of phosphorus in steelmaking is one of the famous challenges of pyrometallurgy. It is well established that highly basic slags, the presence of FeO in the slag and lower temperatures (less

    Jun 19, 2024

  • AUSIMM
    Prevention of Blast Induced Damage to Underground Mine Infrastructure from Open Pit Operations – A Case Study

    By A Campbell

    Open pit blasting at Ernest Henry Mining has the potential to cause damage to nearby underground workings. This paper is a case study of the blast vibration management project that was conducted to en

    Nov 8, 2011

  • AUSIMM
    Getting the most from existing processes: using cleverly designed experiments to optimise the line 3 AG mill at Boyne Smelters Limited

    By T G. Vizcarra, T J. Napier-Munn, A T. Karbowiak, M G. Hart

    Squeezing extra performance from existing equipment (‘sweating the assets’) is key to continuous improvement initiatives, particularly during times of cost cutting where the option of spending additio

    Aug 29, 2018

  • AUSIMM
    Evaluation of the environmental benefits of using a conveyor belt mining system in an open pit mine

    By G P. S Resende, D E. G Oliveira, E A. S Baeta, T F. Bravin

    There is currently in the mining industry, as well as in other industries, a movement seeking to increase investments in decarbonisation processes to help combat global warming. Among some initiatives

    Sep 18, 2023

  • AUSIMM
    Do You Understand Your Legal Obligations in the Industry?

    Most new engineers in the mining industry do not realise the importance of legal obligations. During investigations the first question you are asked is: Do you have any proof or evidence? The smallest

    Jan 1, 2007

  • AUSIMM
    DeGrussa Copper Mine, Western Australia - Feasibility to First Production: A Case Study in Developing a Working Geometallurgy Model from First Principles

    By P Vass, C Butler, J Condon, B Hooper

    DeGrussa Copper Mine, resource status 10.2 Mt at 5.7 per cent Cu, 2.1 g/t Au (Sandfire Resources, 2013), commenced concentrate production through its 1.5 Mt/a conventional copper flotation processing

    Sep 29, 2013

  • AUSIMM
    Challenges Faced by Narrow Vein Graphite Mining and Influence of Graphite Infill on Wall Stability

    By H S. Welideniya, K Ekanayake

    Carbon rich graphite deposits found in Sri Lanka are of inorganic origin and they occur as narrow steeply dipping veins. The vein width of these deposits varies from a few centimetres to metres, with

    Mar 26, 2012

  • AUSIMM
    Mine Geology of the MacPhersons Reward Gold Mine, Coolgardie, Western Australia

    By M D. Goodz

    MacPhersons Reward gold deposit is in a post-kinematic tonalite intrusion which is a setting different from many other deposits of the Coolgardie goldfield that are hosted in early Archaean tholeiitic

    Aug 22, 2011

  • AUSIMM
    Mine to Mill Reconciliation - Three Case Studies

    By J T. Carswell, N A. Schofield

    Fluctuations in periodic reconciliations between the mine and the mill are an expected and common experience in mining and processing operations. These fluctuations are caused in part by errors in the

    Nov 20, 2012

  • AUSIMM
    Sensors and Systems for the Measurement of Tunnel Movements During and After Construction

    By W Ward, J Clegg, R Barnes, T Zhong

    This paper provides an overview of methods for measuring tunnel deflection and construction’s effects on the surrounding environment during and post construction. It will also review illustrative case

    Sep 17, 2014

  • AUSIMM
    An assessment of the rate of construction of an upstream raised tailings dam

    By J J. Moreno, J Willis, P Garvey

    Many of the tailings storage facilities (TSFs) in Australia are upstream raised facilities for which the consolidation of the hydraulically deposited tailings is essential to the stability of the TSF.

    Jul 1, 2021

  • AUSIMM
    In situ observation of phase transition of silico-ferrite of calcium and aluminium

    By H Kim, J Park, J Lee

    Silico-ferrite of calcium and aluminium (SFCA) is a bonding phase in the iron ore sinter. The phase transition upon melting of SFCA was investigated with Differential Scanning Calorimetry and Confocal

    Jun 19, 2024

  • AUSIMM
    Continuous Haulage the Coal and Allied Experience

    By Lennox A

    In an attempt to increase underground productivity Coal and Allied has introduced a continuous haulage unit into it's Moonee colliery. A second unit is planned for Nallarah colliery in the ne

    Jan 1, 1988

  • AUSIMM
    The use of collaboration and management to turn-around the performance of a failing copper mine

    By M Jacobs

    This abstract discusses a heap leach copper mine that was failing to perform and as a result was not meeting targeted production. The mine had numerous technical challenges including: high water inflo

    Jun 22, 2022

  • AUSIMM
    Thermal Fragmentation - An Innovative Process for Mining Narrow High-Grade Precious Metal Veins

    The mining of high-grade narrow vein deposits is a predominant field of activity in the precious metal sector. These types of deposits are located throughout the globe and have a significant presence

    Jan 1, 2008

  • AUSIMM
    Characterisation and calculation method of friction resistance based on fractal theory of roadway rough surface

    By B Wu, C Zhao, B Lei

    At present, the friction factor is calculated by measuring pressure drop and airway configurations. However, the workload of on-site measurement is heavy, and the measurement results are easily distur

    Oct 12, 2022

  • AUSIMM
    Operations of a Low Grade Nickel Sulphide Mine, Nikkel og Olivin, Northern Norway

    At the Nikkel og Olivin nickel mine near Narvik, Norway, Outokumpu has been the operator since 1993. The mine was opened in 1989 and in 1992 Outokumpu commenced operations to secure concentrate del

    Jan 1, 1996

  • AUSIMM
    Multi-factor integrated data analytics and data-driven decision-making for ground control management

    By R Carstens, L Munsamy, L Prinsloo, C Huang, C Zhang, R Liang, I Canbulat

    With recent advances in machine learning, data-based automated decision-making has been proven successful with promising outcomes in many industries. Its application in the mining sector can be ground

    Nov 29, 2022

  • AUSIMM
    No assumptions, no surprises

    By G Deans, M Longbottom

    OZ Minerals’ Carrapateena mine is one of Australia’s newest ‘greenfield’ mining deposits. It will be a 4.25 Mtpa sub level cave underground operation, with an estimated mine life of 20 years. The inte

    Jul 1, 2021