Search Documents

  • IOM3
    Oxidation of silver-copper selenide matte in copper-anode slimes smelting

    By G. G. Barbante

    The oxidation behaviour of selenide matte with a substantial Cu content and low Ag differs significantly from that of high-Ag matte. Low-Ag selenide mattes display a large oxygen solubility and the up

    Jun 19, 1905

  • SAIMM
    The Influence Of Pillars On The Merensky Reef Horizon On Stoping Operations On The Underlying UG2 Reef Horizon

    By N. Singh

    Merensky Reef is mined extensively within the Bushveld Complex. In previously mined-out areas on the Merensky Reef horizon there are pillars, potholes and remnants that have not been mined. These unmi

    Jan 1, 2005

  • AIME
    Logging and Log Interpretation - Velocity Log Characteristics

    By A. A. Stripling

    The Cretaceous limestone wells of the Mara/Maru-caibo Dist. of Venezuela are extremely prolific producers. To maintain production on cessation of natural flow, large scale gas-lift operations were com

  • SAIMM
    Mortimer Smelter: Operations Description

    By C. Sima, M. Legoabe

    Keywords: Pyrometallurgy, furnace, platinum Mortimer Smelter is one of the three smelting operations in the Anglo Platinum Group. It is located in the Limpopo Province, approximately 100 km north

    Jan 1, 2006

  • SME
    Cross-Borehole Geophysical Probing For Site Characterization

    By R. J. Lytle

    INTRODUCTION Prior to excavation in soil and rock, it is useful to know the subsurface structure. This is important information both for safety and for equipment scheduling reasons. It is useful to

    Jan 1, 1979

  • CIM
    Design, testing and performance of the world’s first fuel cell mine vehicle—a production locomotive

    By A. R. Miller, G. Desrivières, T. MacKinnon, H. Bursey, M. C. Bétournay, B. Replogle, D. L. Barnes, P. Laliberté

    "A mine production locomotive, the world’s first applied industrial fuel cell vehicle, has been designed and tested in the context of a number of proof-of-concept projects supported by the Fuelcell Pr

    Jan 1, 2004

  • NIOSH
    OFR-104(4)-80 Selective Placement Of Coal Strip Mine Overburden In Montana - IV. Hydrogeologic Studies

    By D. J. Dollhopf

    This research was part of an effort to investigate means of reestablishing non¬polluted hydrological systems in areas where surface mining directly impacts shallow ground-water resources. Chemically

    Jan 1, 1979

  • DFI
    Connecting Railway Lines In Vienna With Underground Structures - Synopsis

    By Rüdiger Wunsch

    The new high speed Vienna - St.Pölten line and the Lainzer tunnel are to be connected to the existing Western railway line in Vienna. This involves building an underground cut and cover branching tunn

    Jan 1, 2000

  • SME-ICGCM
    Feasibility Study And Design Of A New Underground Coal Mine Developed From Open Cut Highwall In Indonesia (25d3d094-fa9d-4970-a166-6a4fe20badce)

    By Takashi Sasaoka

    About 200 M tons of coal were imported into Japan in 2007 and Indonesia was its second largest exporter, accounting for about 30 M tons (12% of the total imported coal). Indonesia produced about 200 M

    Jan 1, 2009

  • ISEE
    Case Examples of Sensor Coupling Effect on Blast Vibration Measurement and Charge Weight Scaling Plot

    By Gabsoo Kim, Rulin Yang, Dave Kay

    Blast vibration data, such as PPV are usually scattered. In many cases, plots of PPV versus the charge weight scaled distance are so scattered that useful trends from different blast designs cannot be

    Jan 1, 2014

  • SME
    Government and Miners Meet to Increase Indian Exploration and Mining

    By Andrew E. Nevin

    The government of India convened a precedent-setting meeting in New Delhi on Nov. 12, 2001.The meeting brought together regulators and the mining industry in an attempt to fix the industry’s mine deve

    Jan 1, 2002

  • TMS
    Process Modeling For Rotary Kiln Treating EAF Dust

    By Pengfu Tan

    Electric arc furnace (EAF) dust from the steel industries is listed by the United Sates EPA as a hazardous waste under the regulations of the Resource Conservation and Recovery Act due to the presence

    Jan 1, 2005

  • IIMP
    Mitigación de pasivos ambientales mineros en la cuenca Alta del Río Pisco

    By José Vidalón

    Dado que las lagunas de Papacocha y la Virreyna sufren los efectos de los drenajes ácidos de minas abandonadas, relaves y desmontes depositados en sus áreas de influencia, se ha previsto el control de

    Sep 13, 2001

  • SME
    South Arturo, Nevada

    By R. Hipsley, D. Arbonies, P. Dobak

    South Arturo is a “Carlin-type”, breccia-hosted, oxide gold deposit located at the north end of the Carlin Trend. The discovery hole was drilled in July 2005 from mine dumps 1,000 feet south of the D

    Jan 1, 2007

  • AUSIMM
    Development and Benefits of Interactive Learning Systems on Atlas Copco Equipment

    Atlas Copco Construction and Mining Australia identified a number of issues in regard to the skill levels, labour turnover and productivity of our service technicians. In 1994 we were experiencing a l

    Jan 1, 1998

  • SME-ICGCM
    Laboratory And Field Characterization Of Immediate Floor Strata In Illinois Basin Coal Mines

    By Yoginder P. Chugh

    The characteristics of weak floor strata associated with actively mined coal seams in Illinois are very important from ground stability point of view and, in many cases, are the governing factors in d

    Jan 1, 1989

  • SAIMM
    Life-Of-Mine Ventilation and Refrigeration Planning for Resolution Copper Mine (f7fec8ba-f444-4056-8367-98da9f297180)

    Resolution Copper Mine is planned to be a 2000 m deep panel cave mine with virgin rock temperatures above 80°C in rock with a high crystalline silica content. The planned run-of-mine production rate i

    Jan 1, 2014

  • SME
    Large Diameter Tunnel Boring Machine Development

    By Martin Herrenknecht

    The world?s growing population and rapidly proceeding urbanization are boosting an enormous demand for new and high-capacity infrastructures to secure the mobility of goods and people. Densely popula

    Jan 1, 2010

  • ISEE
    Algorithms for Adaptive Solutions: Essential Tools for Operational Blast Optimization

    By Sushil Bhandari, Amit Bhandari

    Blast optimization in open-pit operations is a task that often remains at a theoretical stage. Indeed, when it comes to operational blast design and onsite implementation, time restrictions and field

    Jan 1, 2019

  • AUSIMM
    Australian Iron and Steel Ltd.

    This modern plant consists of a battery of 72 Otto Wilputte Compound Under-jet Ovens with extensive plant for the recovery by-products. The ovens produce 9000 tons of furnace coke per week together wi

    Jan 1, 1938