Search Documents

  • NIOSH
    IC 8076 Processes For Recovering Sulfur From Secondary Source Materials ? Introduction And Summary

    By B. K. Shibler

    During a research program to develop improved methods for recovering elemental sulfur and useful sulfur compounds from secondary source materials, the technical literature was searched for pertinent a

    Jan 1, 1962

  • ISEE
    Modeling of Dynamic Break in Underground Ring Blasting

    By Troy Williams, Chris Preston, Ian Lipchak

    "Underground blasting operations are challenging from the standpoint of the distribution of explosivesenergy representative of ring blasting. Energy from both shock and pressure regimes of commerciale

    Jan 1, 2016

  • AUSIMM
    Western Lode Structures and Southward Extensions of the Boulder Mining Belt

    An intensely sheared and mineralized zone occurs in the quartz dolerite greenstone (or younger greenstone) mass on the western limb of the Kalgoorlie syncline. This zone comprises the western part of

    Jan 1, 1964

  • AIME
    The Behavior Of Copper-Matte And Copper-Nickel Matte In The Bessemer Converter.

    By David H. Browne

    (Pittsburg Meeting, March, 1910.) NICKEL has always been a fruitful mother of problems. Previous to the year 1906 nickel was regarded as an element replacing iron in copper-mattes, and it was belie

    Apr 1, 1910

  • DFI
    Foundations In The Urban Environment The Need For Unique Installation Methods - Introduction

    By James J. Cahill

    Contractor's working in an urban environment face a multitude of working conditions. There is no typical "Downtown" job site. From afar we just see the skyline, or up close a specific building. T

    Jan 1, 1991

  • IIMP
    Aplicación de un sistema de gestión estratégico en las operaciones de la mina San Rafael – MINSUR. S. A

    By Juan Lizana

    El presente trabajo describe el proceso del sistema de gestión estratégica en la mina San Rafael, Puno. En este sentido, la empresa como parte introductoria de sus operaciones, ha propuesto la solució

    Sep 12, 2005

  • AUSIMM
    Gravity and Magnetic Surveys Over Iron Formations, Middleback Ranges, South Australia

    Measurement of densities, susceptibilities, permanent magnetization, and calculation of demagnetization factors has allowed computer modelling of gravity and magnetic data over the Middleback Range ir

    Jan 1, 1975

  • AIME
    Don'ts for the Lady Miner

    By Alicia O&apos, Overbeck, Reardon

    DIFFIDENTLY, because don'ts are rarely greeted with cheers; humbly, because I, myself, have never lined up with the irreproachables, I venture on the subject of manners for the mining camp matron

    Jan 1, 1936

  • CIM
    In Situ Synchrotron Radiation Diffraction during Compression of a ZKQX Alloy

    By K. U. Kainer, A. Stark, D. Tolnai, M. Hehenberger, C. L. Mendis, N. Schell, N. Hort

    Samples of an as extruded Mg-6Zn-0.6Zr-0.4Ag-0.2-Ca (wt.%) alloy was compressed at room temperature and at 250°C. The in situ deformation tests were performed at the P07 (HEMS) beamline of PETRA III,

    Jan 1, 2014

  • SAIMM
  • NIOSH
    OFR-86-95 The Magnitude 5.3 Seismic Event And Collapse At The Solvay Trona Mine: Analysis Of Pillar/Floor Failure Stability - Acknowledgments

    By Peter L. Swanson

    This investigation, which began 90 minutes after the February 3, 1995, seismic event, has benefitted from the assistance of a large number of individuals. These individuals provided information, data,

    Jan 1, 2011

  • AUSIMM
    Mount Angelo Copper Prospect, East Kimberleys, W.A.

    The Mount Angelo prospect outcrops as two copper rich gossans, the larger of which is 250 ft long and 70 ftwide. The mineralization is epigenetic and replaces part of a brecciated and disturbed lime t

    Jan 1, 1966

  • SME
    Grouting and Segmental Linings—Proceed with Caution

    By Thomas Gregor, Brian Garrod

    As the popularity of precast concrete segmental linings for tunnels is growing in North America, some problems related to grouting of, and near, these linings are starting to appear. The installat

    Jan 1, 2005

  • SME-ICGCM
    Subsidence prediction using a laminated linear model

    By Miklos D. G. Salamon

    If all stratifications are horizontal, the computation of surface deformation induced by coal mining involves the prediction of roof and floor convergence and then the transfer of the effects of this

    Jan 1, 1989

  • AUSIMM
    Broken Hill Vughs-Occurrence and Some Probable Causes

    Although these subterranean cavities are common to the Broken Hill big lode, yet the Broken Hill Proprietary is the most prolific in their occurrence, loud they have been found of various dimensions a

  • CIM
    Optimization of the paste backfill plant at Louvicourt Mine (930a856d-d697-4cc4-918f-5d8dfe68aeb0)

    By Jean Cayouette

    "In 1995, Louvicourt Mine started one of the first paste backfill operations in Canada. From 500,000 tonnes in 1995, the annual paste backfill tonnage produced reached 800,000 tonnes in 1999. The maxi

    Jan 1, 2002

  • AUSIMM
    Environmental Management Plans to Reduce Mine Closure Costs

    By I F. Bell, K P. Hammerschmid

    Well planned and executed environmental management plans can reduce life-of-mine operating costs and the need to deal with major environmental issues at the time of mine closure. With proper planning

    Jan 1, 1995

  • CIM
    Management of Copper Solvent Extraction Plants Running At Reduced Throughput

    By D. Kachongo, Y. Cheng, A. Kashala, D. Samal, G. Mitshabu

    Many copper processing flowsheets in the Democratic Republic of Congo include the leaching of oxide ores containing copper and cobalt, copper solvent extraction, copper electrowinning, and precipitati

    Jan 1, 2019

  • AUSIMM
    Metallographic Study of Heat-Treated Chrome Ore Briquettes

    By Tripathy A. K, Satapathy B. K, Nayak B, Mohanty J. N, Dey D. N

    The paper deals with the metallographic tudy of heat treated chromite and chromite-coke composite briquettes. The briquettes, prepared from chromite concentrate of Orissa Mines using molasses-lime, de

    Jan 1, 1987

  • SME
    Predicted versus Actual Obstructions for Two Pipe-Jacked Tunnels of the Henderson CSO, Seattle, Washington

    By Dennis Molvik, Roberto J. Guardia, Brad Cowles, Rick Andrews, Robert A. Robinson

    A 220-meter (m) segment of the Henderson/ ML King Combined Sewer Overflow(CSO) consists of two 1.8-meter-inside diameter (I.D.) pipe-jacked tunnels that pass beneath Interstate-5 and the BNSF and UPRR

    Jan 1, 2005