Search Documents

  • SME
    Bypass Tunnel Shafts—Shotcrete Lining - RETC2023

    By Paul Madsen, Bade Sozer, Thomas Hennings, Eileen Test

    The Rondout Bypass Tunnel in New York has two access shafts. The upper sections of the shafts are lined with steel pipe to resist a substantial net internal water head . Initial design included a ¾-in

    Jun 13, 2023

  • SME
    Wireless Optical Displacement Sensor for Convergence and Divergence Monitoring - RETC2023

    By Raphael Victor

    The construction and modification of tunnels brings a requirement for precise measurement of convergence and divergence to safeguard the structure, maintain safety and provide the assurance needed to

    Jun 13, 2023

  • SME
    Acclimatization: Adapting Conventional Tunnel Lining Techniques to Overstress Rock Conditions - RETC2023

    By Ross Goodman, Jean-Luc des Rivières

    The Ohio River Tunnel Project encountered multiple unexpected geotechnical challenges which, continuing to develop over time, hampered excavation completion and impacted the cast-in-place final lining

    Jun 13, 2023

  • SME
    Design-Build Project Delivery Method Selection and Implementation of a GBR-B and GBR-C for the Pawtucket Tunnel - RETC2023

    By Robin Dill, Julian Prada, Kathryn Kelly, Brian Hann, Todd Moline

    Narragansett Bay Commission’s (NBC) Pawtucket Tunnel Project includes construction of the 11,600-ft long, 30-ft ID, deep rock tunnel. This paper presents insight into the features and benefits of lump

    Jun 13, 2023

  • SME
    Steep TBM Challenge for the Limberg III Pump Storage Power Plant Project - RETC2023

    By Karin Bäppler

    Hydropower produces almost two-thirds of the world’s renewable electricity generation and delivers a major contribution on the ambition of the Paris Agreement and Sustainable Development Goals (SDG) w

    Jun 13, 2023

  • SME
    Record-Setting Tunnel Boring Below Lake Ontario at the Ashbridges Bay Outfall Tunnel - RETC2023

    By Doug Harding

    The 3.5 km long Ashbridges Bay Outfall in Toronto, Ontario, Canada was a challenging drive set below Lake Ontario. After a remote machine acceptance due to the global pandemic, an 8 m diameter Single

    Jun 13, 2023

  • SME
    Missouri River Intake Screen Structure and Tunnel: Overcoming Underground Challenges to Build Vital Infrastructure - RETC2023

    By Ryan Ward

    The Missouri River Intake Screen Structure and Tunnel (MRISST) is one phase of the Red River Valley Water Supply Project (RRVWSP), a vital piece of infrastructure in the state of North Dakota to trans

    Jun 13, 2023

  • SME
    SVCW Gravity Pipeline—Ground Movements During Construction - RETC2023

    By Nik Sokol, Eric Sekulski, Leo Weiman-Benitez, Jon Hurt, Shrinidhi Vijayakumar, Phaidra Campbell

    The Silicon Valley Clean Water (SVCW) Gravity Pipeline (GP) is the first Progressive Design Build (PDB) tunnel completed in North America. As part of the Regional Environmental Sewer Conveyance Upgrad

    Jun 13, 2023

  • SME
    Direct Tensile Testing and CT-Scanning of Fiber Reinforced Shotcrete - RETC2023

    By Denis Tepavac, Mark Trim

    Structural performance of fiber reinforced concrete (FRC) depends on its ability to carry tensile forces after cracking. Australian Standards AS5100-2017 and AS3600-2018 are the only available design

    Jun 13, 2023

  • SME
    TBM Tunnel Offshore Connection - RETC2023

    By H. Vigil Fernandez, G. Peach

    The Musaimeer pump station and outfall project located in Doha Qatar, was designed to collect and manage ground and stormwater and then discharge the treated waters offshore. The project constructed a

    Jun 13, 2023

  • SME
    Designing and Constructing the Advance Tunnel for the Scarborough Subway Extension - RETC2023

    By Jorge Ferrero, Andreas Raedle, Uhland Konrad, Michael Dutton, Keivan Pak Iman, Walter Trisi

    Strabag, in partnership with Arup, is constructing the Advance Tunnel for the Scarborough Subway Extension (ATSSE); a project by Metrolinx and Infrastructure Ontario (Sponsors). The 10.7 m internal di

    Jun 13, 2023

  • SME
    Corrosion and Leakage Remediation for WMATA Yellow Line Steel Tunnels - RETC2023

    By Tatiana Kotrikova, Steven Kolarz, Alan Kolodne, James Parkes, Matthew Goff

    The WMATA Yellow Line is the section of steel segmentally lined tunnels that have experienced leakage and significant corrosion in isolated areas. A three part rehabilitation design has been developed

    Jun 13, 2023

  • SME
    Qualifications and Design of Waterproofing Systems for Underground Structures - RETC2023

    By Enrico Pavese, Tim Kearney, Stefan Lemke

    Watertightness is of central importance in hydraulic and underground structures but has always been associated with a risk, as demonstrated by the very high impact that water inflows have on the damag

    Jun 13, 2023

  • SME
    Ashbridges Bay Treatment Plant Outfall TBM Risk Mitigation— Prescriptiveness and Verification of TBM Fabrication - RETC2023

    By Dan Ifrim, Andre Solecki

    Tunneling could be a major challenge to tunneling contractors as tunneling operations can be seriously affected by the Tunnel Boring Machine (TBM) performance. Specifying the appropriate TBM methodolo

    Jun 13, 2023

  • SME
    Gravity Sewer Tunnel Liner Corrosion Protection—Part Two - RETC2023

    By Jon Y. Kaneshiro, Eric Dawson, Pooyan Asadollahi, Steven Hunt

    This paper provides updates to the paper published by the lead author at RETC 2011 with a summary of developments in technologies, products, and approaches to corrosion analyses of gravity sewer tunne

    Jun 13, 2023

  • SME
    Bad Bergzabern Bypass Tunnel—NATM Tunneling Through Vineyards - RETC2023

    By Ralf Plinninger, Pafos Busch, Richard Gradnik

    This paper presents the details of the Bad Bergzabern tunnel project. This tunnel is the main part of the B427 federal road bypass, intended to improve the regional traffic infrastructure and to reduc

    Jun 13, 2023

  • SME
    The Woodsmith Project—Construction of the Access Shaft at Lockwood Beck Using Innovative Blind Boring Technique - RETC2023

    By Cameron Dunn, Callum Fryer, Carmen Hu, Craig Sewell, Peter Stakne, Andrew Raine

    The Woodsmith Project is located in north-eastern England within the North York Moors National Park. The strata contains the world’s largest known high-grade Polyhalite resource of around 2.66 billion

    Jun 13, 2023

  • SME
    Overexcavation Risk Management During Pressurized Face Tunneling in the Pacific Northwest - RETC2023

    By Ulf Georg Gwildis

    Overexcavation and ground loss events during pressurized-face TBMadvance in soft ground can result in unplanned deformations above the tunnel and damage to existing infrastructure. Successfully managi

    Jun 13, 2023

  • SME
    Second Narrows Water Supply Tunnel—Conventional Deep Shaft Excavation in Variable Weak Rock - RETC2023

    By J. Andrew McGlenn, Brian McInnes, Bruce Downing, Murray Gant

    The Second Narrows Water Supply Tunnel crossing beneath Burrard Inlet is an important component of the Greater Vancouver Water District’s plans to increase seismic resilience and meet increasing water

    Jun 13, 2023

  • SME
    Risk-Based Design Study and Innovative Ventilation Strategy for a High-Gradient Short Tunnel - RETC2023

    By Reinhard Gertl, Maximilian Weithaler, Harald Kammerer, Juan Pablo Muñoz, Juan-Carlos Rueda

    The Guillermo Gaviria Echeverri tunnel and its access roads project in Antioquia, Colombia is a mega infrastructure project that includes a road network with the longest tunnel in Latin America and se

    Jun 13, 2023