Search Documents

  • DFI
    Drilled Shaft Acceptance Criteria Based Upon Thermal Integrity Profiling

    By Garland Likins, Gray Mullins, George Piscsalko

    "Quality control of drilled shafts is greatly dependent upon the practices of the site personnel. For drilled shafts cast under slurry, inspection of the hole prior to concreting is very difficult or

    Jan 1, 2016

  • DFI
    Drilling and Grouting For the Rehabilitation of Contaminated Areas: An Italian Case History

    By Raffaella Granata, Daniele Vanni

    "This paper presents the drilling and grouting program performed at two abandoned landfills located into former calcarenite rock quarries in Manfredonia, Italy. Tests performed after the abandonment o

    Jan 1, 2016

  • DFI
    Fraser Heights Bridge – Comparison between PDA Tests and Pile Capacity Estimation Methods

    By Ali Azizian, Brian Hall

    "Driven piles were selected to support the Fraser Heights Bridge bents. Piles were a key component of the top-down construction approach, which was adopted for minimizing potential impacts on an envir

    Jan 1, 2016

  • DFI
    Driven Pile Foundation Design and Construction Issues for a Highrise Building in Manhattan

    By Satyajit Vaidya, Rudolph Frizzi, Sandy Larimer

    "This paper presents a case history in design and construction of a deep foundation system that included high-capacity open-ended driven piles constructed to support a high-rise building in Manhattan,

    Jan 1, 2016

  • SME
    DSU TBM for Vishnugad Pipalkoti - TBM Design Development for Large Diameter Rock Tunnels under the High Covers of the Himalaya

    By Remo Grandori

    "INTRODUCTIONDouble Shield TBMs were introduced in the market in the early seventies with three main targets:• Increase the TBM performances in term of advance per day thanks to the ability to erect a

    Jan 1, 2016

  • DFI
    High Capacity Grouted Helical Piles

    By Mohamed A. Mansour, Ahmed M. Soliman, M. H. El-Naggar

    "Grouted helical piles allow significant increase in pile capacity with low additional cost over that of conventional helical piles. They can be particularly advantageous in sites where installation d

    Jan 1, 2016

  • DFI
    Load Tests on Drilled Shafts at Goethals Bridge Replacement

    By John P. Turner, Steven S. Dapp, Dan A. Brown

    "The Goethals Bridge Replacement (GBR) spanning the Arthur Kill Waterway between Elizabeth, NJ and Staten Island, NY is supported on over 200 drilled shaft foundations ranging in diameter from 4.5 ft

    Jan 1, 2016

  • DFI
    Metro Rome Line “C” - Artificial Ground Freezing Application for the Underpass of the Existing Metro Station San Giovanni - Line “A”

    By Giulia M. B., Ferruccio Cribari, Alessandro Bertero, Eliano Romani, Roberto Sorge, Francesca Casini

    "The use of Artificial Ground Freezing (AGF) to form earth support and seepage control barrier systems has had applications worldwide. These cover a variety of construction problems, including the for

    Jan 1, 2016

  • SME
    Metro Rome Line “C”: Artificial Ground Freezing Application for the Underpass of the Existing Metro Station San Giovanni, Line “A” (88718b03-9244-4135-bce5-d10b55d2684f)

    By Salvatore Fancello, Ferruccio Cribari, Amerigo Tanzi, Mauro D’Angelo, Massimo Lodico, Alessandro Bertero, Eliano Romani, Tommaso Gondolini, Fabio Giannelli

    "The new metro line “C” entails the construction and rehabilitation of 24 stations and 21,5 km of metro line, 13 of which carried out underground; the new metro line will improve the transportation sy

    Jan 1, 2016

  • CIM
    The Extractive Metallurgy of Agromined Nickel

    By William Hawker, James Vaughan, Jeff Chen, Antony van der Ent

    "Nickel agromining utilizes hyperaccumulator plants (“metal crops”) to extract nickel from low-grade soils, a process that yields high-grade nickel bio-ore. This feedstock is further processed into a

    Jan 1, 2016

  • TMS
    Acid Leaching Zinc And Indium With Reduction Ferric Simultaneously From Marmatite And High-Iron Neutral Leaching Residue

    By Chang Wei, Fan Zhang, Zhigan Deng, Minting Li, Cunxiong Li, Gang Fan, Xingbin Li

    Marmatite is an important resource of zinc, which exist in forms of high iron and high indium. In order to recycle the valuable metal from these ores, the testwork of simultaneous leaching on neutral

    Jan 1, 2016

  • SME
    The Brenner Base Tunnel

    By Michael Rehbock-Sander, Romed Insam

    "INTRODUCTIONThe idea of building a summit tunnel under the Brenner occurred to the Italian engineer Giovanni Qualizza as far back as 1847. But it was to be another 160 years to pass before a base tun

    Jan 1, 2016

  • DFI
    Use of Enhanced Pre-Mixed Self-Hardening Grout for an Emergency Cut-Off Wall Intervention in West Africa

    By Maurizio Siepi, Bruno Vingiani, Claudio Asioli

    "The article describes an emergency rehabilitation intervention executed at Buyo Dam, in Ivory Coast, to intercept a significant water seepage occurring through the foundation of this zoned earthfill

    Jan 1, 2016

  • SME
    Use of Numerical Modelling and GIS to Analyse and Share the Risks Related to Urban Tunnelling - Greater Paris - Red Line – South Section

    By Fatima-Zahra Houmymid, Elena Chiriotti, Mahdi, Samy

    "The Greater Paris projects involves the creation of a 200km extension of the actual public transport network on the close outskirt of Paris. In 2011, SYSTRA has been awarded the Engineering studies o

    Jan 1, 2016

  • DFI
    Value-Engineering of H-Pile Foundations in Karstic Geology

    By Rachael M. Fischer, Daniel J. Woeste, Terence P. Holman

    "A new 50 MW biomass renewable energy power plant was planned for construction in southwestern Georgia. The original foundation design consisted of very conservatively designed H-pile groups with vert

    Jan 1, 2016

  • SME
    Unexpected Post-Excavation Damage to a 28"-Thick Segment Lining - Failure Mechanism and Rehabilitation Measures

    By Jens Classen, Martino Gatti

    "GENERAL PROJECT DATAThe Sparvo Tunnel is part of the “Variante di Valico” project, a new 65km (40mi) highway link between Bologna and Florence, designed to renew the existing A1 route which connects

    Jan 1, 2016

  • DFI
    Washington Avenue Tunnel Project: Fortifying Aging Underground Infrastructure

    By Andrew R. Klaetsch, Peter W. Deming

    "The Washington Avenue tunnel in Kingston, NY was completed in 1912 to convey combined storm water and sanitary sewage. Over a mile in length, the tunnel was driven almost entirely in bedrock, with th

    Jan 1, 2016

  • DFI
    UB Digs Deep and Builds Over Adjacent Subway for New Medical Building Hub

    By Lisa R. Papandrea, David Chen, Walter E. Kaeck

    "Construction of the University at Buffalo’s new School of Medicine and Biomedical Sciences (UB-SMBS) required excavation in variable ground to a depth of more than 40 ft adjacent to the NFTA Metro su

    Jan 1, 2016

  • DFI
    Risk Assessment and Quality Control on Grouted Waterretaining Layers by Observational Engineering

    By Bartho J. Admiraal

    "As part of the Schiphol-Amsterdam-Almere project, the largest aqueduct in Europe is being built in order for the A1 motorway to cross the Vecht River. The A1 consists of 12 lanes and the total width

    Jan 1, 2016

  • DFI
    Rock Excavation and Underpinning below a 19-Story Building

    By Kevin P. Gleckler, Steven C. Highfill

    "Escalators to access platforms for the Second Avenue Subway Station at 72nd Street in Manhattan are to be installed in the basement of an existing 19-Story residential building. The escalators, which

    Jan 1, 2016