Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
A Modified Software Tool for Mine Waste Rock Dump PlanningBy Z Fu, E Topal, O Erten
"Mine waste rock management involving waste rock movement and placement, is a critical aspect in the planning of open pit mining operations, as the waste rock haulage cost can be the largest portion o
Nov 15, 2016
-
Everyone Has a Plan Until They Get Punched in the Mouth – Creating Trust, Commitment and Results in Tough TimesBy P Moynagh
"A plan is critical but on its own it is a bit one dimensional, the three dimensions critical to success over the long-term, through changing economic, geological and management conditions are:the qua
Nov 15, 2016
-
What’s Stopping You? The Role of Sheeting Material Selection in Safe Haulage OperationsBy R Thompson, D Tulloch
"Wet-weather or 24×7 wet-trafficability is a commendable design objective for unpaved mine haul roads, but practically often difficult to achieve, due both to the road sheeting material selected, and
Nov 15, 2016
-
High Energy Bulk Explosives and Mine to Mill Focus – the Mt Rawdon StoryBy D Morton, G Wallace
"Evolution Mining is the sole owner of the Mt Rawdon open cut operation, located 75 km south-west of Bundaberg in Queensland, Australia (Figure 1). It is a massive, volcanically hosted, low-grade gold
Nov 15, 2016
-
Reducing Bench Turnover Time and Improving Shovel DigabilityBy D Kavanagh, C Michaud
"A continuous improvement initiative was identified at Kalgoorlie Consolidated Gold Mine’s (KCGM) Fimiston open pit with the goal of reducing bench turnover time and increasing shovel digability by im
Nov 15, 2016
-
Autonomous Haulage Systems – the Business CaseBy R Price
"Technology has the potential to revolutionise industries, work functions or businesses. One such technology in the mining industry is the deployment of automation in a modern autonomous haulage syste
Nov 15, 2016
-
Autonomous Haul System Savings – It’s Not about Less Truckies but Better Truckies!By R Price, B H. Miller
"The rise of autonomous haul truck fleets may have been initially driven by the rapid escalation of the cost of equipment operators, but the actual improvements reported by the major iron ore miners f
Nov 15, 2016
-
Remediation of Wall Failure at Kalgoorlie Consolidated Gold Mines’ Golden Pike Cut-back 2016By J Darbritz
"This paper details the events leading up to a slope failure that occurred at Kalgoorlie Consolidated Gold Mines (KCGM) and the remediation method executed using rope access specialists.n January 2016
Nov 15, 2016
-
Driving Haulage Productivity Improvements through Industry–Academia CollaborationBy R Thompson, J Miedecke, D Handel, E Tomicek, D Tulloch
"The Mine Haul Road Optimisation Alliance (HROA) is a unique Australian industry–academia collaboration that has been developed to support mine haul road operators. The alliance integrates industry, e
Nov 15, 2016
-
Determination of the Transition Point from Open Pit to Underground MiningBy A K. Ghosh, J Chung, E Topal, M Asad
"Many open pit (OP) mines with considerable vertical extent are approaching the end of their life-of-mine; some of them are seeking the opportunity to make the transition from OP to underground (UG) m
Nov 15, 2016
-
Getting the Most out of Technology to Drive Mine Productivity ImprovementsBy K Sommerville, J Parkinson
"Open pit mines today have more technology and data available. The challenge is to effectively use resources to analyse and identify mine productivity improvements. AMC Consultants Pty Ltd (AMC) has c
Nov 15, 2016
-
Adapting to Geotechnical Change – a Case Study of the Carina Open Pit MineBy R Jaine, D Strang, M Fowler
"This paper presents a case study demonstrating active geotechnical pit slope management at the now completed Carina Iron Ore Project operated by Mineral Resources Ltd (MRL). The site is located 105 k
Nov 15, 2016
-
Controlling Blast Related Fumes with Unconventional ExplosivesBy J Rock, K Bambrook
"Hanwha Mining Services was approached by Glencore Coal to provide a series of (trial) demonstration blasts at its Clermont coalmine. The intent of the project was to trial a bulk explosive product th
Nov 15, 2016
-
Optimisation Improvements for Narrow Vein Open Pit Deposits Using Mineable Shape OptimiserBy C Mann, S Swapp
"The mining industry is often challenged with the task of evaluating narrow vein open pit deposits. A realistic mineable solution from optimisation needs to accurately represent mining dilution and th
Nov 15, 2016
-
Trials, Tribulations and Triumphs of Unmanned Aerial Vehicle Surveying at St Ives Gold MineBy R Steven
"Surveying, and as a result, surveyors, have been around since the start of time, and it has been said that so has their methodology!The theodolite and tape have been the backbone of a time-tested pra
Nov 15, 2016
-
Use of Robust Design Methodology for Production Scale Definition in Open Pit MiningBy M A. González, J A. Romero, D L. Fuentes, C J. Poblete, O Abdrashitova
"Robustness can be defined as the ability of a system to resist change without adapting its initial stable configuration. Robust design methodology, which is widely accepted in the manufacturing indus
Nov 15, 2016
-
Application of Shuttle Radar Topography Mission Data in Hydrological Analyses of Super Pit and Griffin CoalmineBy A K. Ghosh
"Inrush of water is always an issue, especially for mines located in heavy rainfall areas. Nowadays, mining companies and research institutes have developed many advanced technologies for study and an
Nov 15, 2016
-
Innovative Approach to Open Pit Edge ProtectionBy N Redwood, N Fowkes, A Bassom, S Durkin
"It is well known that from time-to-time a vehicle will interact with a bund or windrow and often the barrier is insufficient to safely arrest that vehicle. The result of such an incident is often cat
Nov 15, 2016
-
A Fine Looking Sample – the Importance of Fines in Grade Control Sampling to Mine to Mill ReconciliationBy B Reid
"Since the commencement of mining operations at the Cowal Gold Operations (CGO) in 2005, reverse circulation (RC) drilling has been the preferred method for grade control (GC) sample collection. This
Nov 15, 2016
-
Optimum Management of Truck Tyres in a MineBy S Casas Castellanos
"Tyres consumption is one of the costliest branches of the operation in a truck-based haulage mine. Off-the-road (OTR) tyres working within undesirable conditions have a considerable negative impact o
Nov 15, 2016