Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
East Boston Branch Sewer Relief Project: Support of Excavation Case Study (FULL Project)By Eric P. Bregman, Franklin M. Grynkewicz, John E. Regan
"As part of an on-going effort to improve water quality and reduce discharge into Boston Harbor, the Massachusetts Water Resources Authority (MWRA) East Boston Branch Sewer Relief Project was designed
Jan 1, 2017
-
Comminution Circuit Design Considerations (49th Annual Canadian Mineral Processors Operators Conference©, Ottawa, Ontario, January 17-19, 2017)By S. Rivard
"This paper demonstrates the selection of grinding circuit technology for a number of recent projects including discussion of the key drivers and the role of energy efficiency. Decreasing head grades
Jan 1, 2017
-
Alameda Corridor-East: San Gabriel Trench ProjectBy David Peterson, Terry Tucker, Rafael Serrano
"The Alameda Corridor-East (ACE) Construction Authority awarded a $172.6 million contract to Walsh Construction Company (Walsh) for the construction of a 2.2 mi (3.5 km) long grade separation includin
Jan 1, 2017
-
Capacity of Hydraulically Jacked PilesBy Howard A. Perko, Melinda J. Hummel
"Hydraulically jacked piles, herein referred to as jacked piles, are commonly used for underpinning existing structures to arrest settlement or augment an existing foundation for higher loads. They co
Jan 1, 2017
-
Case History: Large Diameter Micropiles for the Highway 53 Relocation ProjectBy Nathan W. Iverson, David S. Graham, Paul J. Axtell
"The Highway 53 relocation project in Virginia, Minnesota, involves construction of a very tall bridge across a currently inactive iron ore mine pit. The inactive pit is partially flooded and serves a
Jan 1, 2017
-
Analytical Expression for Plastic Hinge Length in Extended Pile-shaftsBy M. Hesham El Naggar, Mehdi Heidari
"Equivalent fixed-base cantilever model is a common approach for performance base seismic design of bridge structures supported by extended pile-shaft. In this method, global displacement ductility fa
Jan 1, 2017
-
Assessment of Existing Bulkhead Walls for Dredging ImpactsBy Rakam Lama Tamang, Michael J. Byle, Stephen Ernst
"For various reasons, dredging may become necessary in front of existing bulkhead walls, either for channel deepening or for environmental remediation of contaminated sediments. The removal of sedimen
Jan 1, 2017
-
Baum Station – A New Pile Driving and Drilling Navigation SystemBy Dzianis Proshchanka, Yoshi Izumi, Koji Mitani, Ayuna Kitaura
"A new pile driving and drilling navigation system has been developed. It utilizes the commonly used surveying total station, combined with an innovative reticle. Conventional crosshairs have been rep
Jan 1, 2017
-
Challenges in Managing an Aging Infrastructure, Lessons Learned from a Near Miss at the Lake Manatee DamBy Glen R. Andersen
"Two of the greatest challenges we face in managing our aging infrastructure are to perform accurate condition assessments and to realistically predict the risk of non-action. The aim of this paper is
Jan 1, 2017
-
Interpretation of Seismic Response Data from Full Scale Helical Pile TestsBy A. B. Cerato, M. K. ElSawy, A. Elgamal
"Helical piles are gaining popularity as foundations for new construction as well as retrofitting option for deficient foundations. More recently, large diameter helical piles are used to support stru
Jan 1, 2017
-
Driving and Extraction of Steel Pipe Piles in Nearshore EnvironmentBy Jim Rix, Ken Been, Nihal Bohra, Anthony Rice, Juan Lopez
"A temporary bridge, supported on steel pipe piles, was built to expedite the construction of a breakwater structure off the western coast of Peru. The bridge provided access for dump trucks to the br
Jan 1, 2017
-
Agnico Eagle Laronde Plant: Metallurgical Challenges Present and Future (CIM Journal | Vol. 8, No.1, 2017)By J. Cayouette, C. Bolduc, P. Blatter
"The LaRonde mill was commissioned in 1988 and began treating ore from the Penna shaft in 2000. The mill has been expanded to accommodate 7,500 t/day, but ramped down to 6,000 t/day since the deep ext
Jan 1, 2017
-
Analysis and Performance of Sheet Pile Cofferdam under Demolition Blast LoadsBy John Mould, Gordon Chen, Michael Oakland, William McElwee
"This paper will discuss the design analysis of sheet pile cofferdams for static and dynamic blast loads. Following construction of the new Willis Avenue Bridge across the East River between Brooklyn
Jan 1, 2017
-
Agnico Eagle LaRonde plant: Metallurgical challenges present and futureBy J. Cayouette, C. Bolduc, P. Blatter
"The LaRonde mill was commissioned in 1988 and began treating ore from the Penna shaft in 2000. The mill has been expanded to accommodate 7,500 t/day, but ramped down to 6,000 t/day since the deep ext
Jan 1, 2017
-
Acrylamide Grouting: Successfully Controlling Groundwater from Canada to South AmericaBy Daniel Magill, Jim Gentry
"Acrylamide chemical grout (C3H2NO) has been successfully used for over 50 years to control groundwater and stop infiltration. This paper will address three unique projects involving the control of gr
Jan 1, 2017
-
Alternative Deep Foundation Solutions – DMM at LPV-111 in New OrleansBy Peter Cali, Wesley Schmutzler
"The Deep Mixing Method (DMM) was employed to raise and support the LPV (Lake Pontchartrain and Vicinity) -111 Levee in New Orleans. Even using innovative technologies, the tight schedule to achieve t
Jan 1, 2017
-
Demonstration Campaign Results on a Cyanide-Free Process for Gold Extraction from a Refractory Pyrite Concentrate (SME Annual Meeting Feb. 19 - 22, 2017, Denver, CO)By . A. Drouin, J. -M. Lalancette, D. Lemieux, C. Chouinard
"A gold bearing pyrite concentrate was treated at the demonstration scale (15 t/d) for the extraction of gold using a cyanide-free process. The pyrite was depressed in the flotation circuit in order t
Jan 1, 2017
-
Copper Prestrip to Copper CyanideBy S. N. Dixon
"Maximizing the value of each tonne of processed ore is the goal for all operations. Cyanidation processing of gold-copper ores has been challenging since its first use in 1889. The current practice t
Jan 1, 2017
-
A Case History on the Design, Construction, and Field Quality Control of Cement Deep Soil MixingBy Dominic Parmantier, Karen Dawson, Suthan Pooranampillai, Seungcheol Shin
"This paper presents a case study of the use of single axis cement deep soil mixing (CDSM) to deal with static settlement and seismic stability of the foundation soils under a reinforced soil slope (R
Jan 1, 2017
-
Dynamic Analysis of a Base-Isolated Bridge, Seattle, WashingtonBy Greg Nutson, Jeremy Butkovich, Bill Perkins, Hollie Ellis, Paul Bott
"Dynamic soil-structure interaction (DSSI) analyses are becoming more common in bridge designs, especially in seismically active areas. Because of its proximity to two active fault zones, the Evergree
Jan 1, 2017