Search Documents

  • AIME
    In Memoriam (dc0b46dd-9cb1-4690-b9f2-613d55cf21c5)

    CAPTAIN JOHN H. BALLAMY John H. Ballamy, Captain on the Regimental Staff of the 103d Engineers, was killed near Fismes, on August 9, 1918. Captain Ballamy was born at Plymouth, Pa., in 1886 and gra

    Jan 11, 1918

  • AUSIMM
    Inclined Caving Option for the DNK Mine, Kazakhstan

    By S M. Loewen, J J. Fuykschot

    Located in the north-west of Kazakhstan is a world-class podiform chromite deposit. Donskoy mining and beneficiation complex (DGOK), a branch of Kazchrome TNC, which is a subsidiary of the Eurasian Re

    May 9, 2016

  • DFI
    In Situ Soil Mixing Concepts Explained; Myths Dispelled - What Is Soil Mixing?

    By Richard W. Hanford

    The geotechnical construction industry generally considers soil mixing to be defined as an in situ ground improvement or treatment method by which a dry or wet reagent is introduced into the ground an

    Jan 1, 2001

  • SME
    Underground Mining: Caving Methods

    By George A. Mealey

    Caving mining methods that are based on a planned caving of rock above and/or at times surrounding the material being mined can be classified in three broad categories: longwall mining, sublevel cavin

    Jan 1, 2008

  • CIM
    Reducing Miners? Exposure to Diesel Particulate Matter Using Real-time Measurement

    By Michel G. Grenier

    Compliance with Diesel Particulate Matter (DPM) exposure regulation is currently performed using timeweighted average (TWA) sampling on underground mine workers. These samples are collected in the spa

    May 1, 2010

  • CIM
    The Pogo project: flowsheet development and design

    By Eric Konigsmann

    "The Pogo project is located on the Goodpaster River, 38 miles north of Delta Junction in east central Alaska. Sumitomo Metal Mining and Teck Corporation are planning to develop a 2,500 ton per day un

    Jan 1, 2002

  • SME-ICGCM
    Catastrophic Failures of Underground Evaporite Mines

    By Jeff Whyatt

    Deformation of underground salt, trona and potash mines is generally time dependent, providing for gradual adjustment of strata to mining induced stresses. Time dependence can allow for higher extract

    Jan 1, 2008

  • NIOSH
    RI 7385 Evaluation Of Electrowon Tungsten Sheet

    By G. H. Keith

    Electrowon tungsten powders were investigated with respect to consolidation, fabrication, and mechanical properties. Sheet, 0.03 inch thick, was produced and its tensile strength measured between 250°

    Jan 1, 1970

  • SME
    Borehole Hoisting For Shaft Sinking And Development At Brunswick Mining And Smelting Corporation Limited, Bathurst, New Brunswick

    By W. R. Dengler, R. S. Brown

    In 1974, Brunswick Mining and Smelting Corporation Limited started a 48 million dollar expansion programme at their property in Bathurst, New Brunswick. A portion of the expansion plans includes a 26

    Jan 1, 1976

  • SME
    Engines And Tires: Emissions, Life Of Tire Improved With Technology

    Nearly as impressive as the machines that will be on display at MINExpo are the massive engines and tires that keep the machines moving. As you can imagine, it takes a special tire and special engine

    Jan 1, 2012

  • NIOSH
    RI 5899 Electric Smelting And Gaseous Refining Of Cement-Copper Precipitate ? Summary

    By F. E. Brantley

    Research was undertaken by the Bureau of Mines to assess the technical feasibility of smelting cement-copper precipitate in an electric furnace to produce commercial-grade copper. The blister-grade co

    Jan 1, 1961

  • SAIMM
    Design And Support Of Rockpasses At Ultra-Deep Levels

    By F. M. C. C. Vieira

    The DEEPMINE Research Programme sought to develop the technology and competence to mine gold safely and profitably at depths of 3 to 5 km. Among the many issues addressed was the stability and support

    Jan 1, 2005

  • CIM
    Anode Furnace Nitrogen Gas Purging System at Kansanshi Copper Smelter

    By L. Hanschar, C. Bwalya, E. Mokola, K. Musonda, A. Makayi

    This paper describes the installation, commissioning and operation of porous plugs featuring nitrogen gas purging in both Anode Furnaces at the Kansanshi Copper Smelter (KCS), a greenfield copper smel

    Jan 1, 2019

  • ISEE
    Concrete Bridge Pier Removal in an Environmentally Sensitive River

    By Paul Kunze

    When a new bridge was needed across the upper reaches of the Yellowstone River in Montana, removing the old concrete bridge piers became an environmental concern for the highway department engineers.

    Jan 1, 2014

  • AUSIMM
    Exerting the Advantages of National Key Discipline, Outstanding the Training of Engineering Capability, Cultivating Talent to be with Innovation Ability

    Exerting the Advantages of National Key Discipline, Outstanding the Training of Engineering Capability, Cultivating Talent to be with Innovation Ability

    Sep 13, 2010

  • SAIMM
    Corrosion Of Hot End Automotive Exhaust Components

    By Z. W. Nkosi, M. Sephton, J. H. Potgieter

    The exhaust system is a complex assembly of various components performing important tasks in harsh environments. Carbon steels have been used extensively in exhaust systems, but pressure for lower cos

    Jan 1, 2006

  • DFI
    Experimental Study Of Axial Bearing Capacity Of Half-Closed End Steel Pipe Piles ? Synopsis

    By Y. G. Qin

    In this article an experimental study of axial bearing capacity of half-closed steel pipe pile installed at BKSH dock is presented. In comparison with open and closed end piles, half-closed end pile i

    Jan 1, 2010

  • AUSIMM
    On the Use of Dry Pulp Duplicates in Quality Assurance/Quality Control - A New Tool of the Trade

    Same-batch and non-blind as well as blind pulp duplicates are often submitted as quality assurance/quality control (QA/QC) control samples to a routine laboratory along with routine assays (and other

    Jan 1, 2008

  • SAIMM
    Gravity Circuit Optimisation Via Mathematical Modelling By Particle Size Classes

    By Ishwinder Grewal, Michael Fullam

    Many factors affect the overall performance of a gravity circuit beyond that of the primary gravity recovery device. It is critical to examine the gravity circuit in its entirety in order to determin

    Jan 1, 2006

  • AUSIMM
    Borehole Ropeways at No 2 Ore Shaft, Mount Isa Mines Limited

    The No. 2 Ore-shaft, at Mount Isa Mines Limited, involving the use of boreholes as ropeways for the upper portion thereof, constitutes, we believe, a unique feature in hoisting installations. The bore

    Jan 1, 1939